S No. Zone S Z W Status Head Cat Dep Work Name Work Type Work Location E Cost
(in lacs)
T Cost
(in lacs)
Agency Work Order Date T Limit
(in months)
Phys Prog
(in %)
Bill Prep
(in lacs)
Paid
(in lacs)
Liab
(in lacs)
1 A A1 19 ongoing cq nw br Laying 60mm thick I/tiles in Street No. 2 Basti Mani Singh. ILT60 Street No. 2 Basti Mani Singh. 4.67 3.82 K.C. Builders A/br/2013/87/19/6 09/12/2013 5 100.00 3.82 0.00 3.82
2 A A1 19 ongoing cq nw br Laying RMC M20 in St. No. 5, Boby Oswal Madhopuri. RMC6 St. No. 5, Boby Oswal Madhopuri. 30.27 26.24 Kabir Infra Pvt. Ltd. A/br/2013/95/19 09/12/2013 5 100.00 26.00 0.00 26.24
3 A A1 19 ongoing cq nw br Laying RMC M20 in St.no.4 upto Gujrati Gali New Madho Puri. RMC6 St.no.4 upto Gujrati Gali New Madho Puri. 24.12 20.91 M/s Kabir Infra Pvt. Ltd. A/br/2013/95 09/12/2013 5 100.00 20.27 0.00 20.91
4 A A1 19 ongoing mlaq nw br P/F of 60mm thick I/tiles in Basti Sheikh Mohammad. ILT60 Basti Sheikh Mohammad. 5.37 5.19 M/s The Ghangas Co-op L/C Society Pvt. Ltd. A/br/2015/158 31/08/2015 1 100.00 5.20 4.10 1.09
5 A A1 19 ongoing other nw br Laying RMC M-20 in st.no.5,6 Kuldeep Nagar in ward no.19. RMC4 St.no.5,6 Kuldeep Nagar in ward no.19. 38.40 34.51 IHR Associates A/br/2016/66 23/08/2016 2 100.00 26.64 0.00 34.51
6 A A1 19 ongoing cq nw br P/fixing Sign boards and speed bumps in ward no.19. Others In area of ward no.19. 7.00 5.96 The Sihar Co-op L&C Society Ltd. A/br/2016/57 18/07/2016 1 100.00 5.93 0.00 5.96
7 A A1 19 ongoing other nw br Laying RMC in st.no.4 & link street, st.no.10 New Madho Puri & st.no.4 Basti Mani Singh in w.no.19. (PIDB Work of Phase-I-Central) RMC4 In st.no.4 & link street, st.no.10 New Madho Puri & st.no.4 Basti Mani Singh in w.no.19. 60.12 50.32 Subodh Batish A/br/2016/206 18/04/2016 3 100.00 0.64 34.45 15.87
8 A A1 19 ongoing other nw br (i) Laying RMC over lean concrete from gali no.15 to G.T Road Bye Pass portion of New Madho Puri main Road in W-No.19.(19.27), (ii) Construction of RMC Road in Daulat Colony in w.no.19 (21.97), (iii) Laying RMC in Mahavir Jain Colony, street no. 4,5,6 and main street in w.no.19.(43.38) (PIDB Works of Phase-I-Central) RMC4 (i) from gali no. 15 to G.T Road Bye Pass portion of New Madho Puri main Road in W-No.19 (ii) In Daulat Colony in w.no.19., (iii) Mahavir Jain Colony, street no. 4,5,6 and main street in w.no.19. 83.22 68.76 Subodh Batish A/br/2016/21 03/06/2016 4 100.00 1.99 61.36 7.4
9 A A1 19 ongoing other nw br Laying RMC in different streets of ward no.19. (i) Laying RMC M-20 in st.no.5,6 & links in New Madho Puri w.no.19. (30.22)., (ii) Laying RMC M-20 in st.no.7 & 8 in New Madho Puri w.no.19. (32.79). (PIDB Works of Phase-II-Central) RMC4 (i) St.no.5,6 & links in New Madho Puri w.no.19., (ii) St.no.7 & 8 in New Madho Puri w.no.19. 63.01 55.32 Sham Sunder Singla A/br/2016/71 09/09/2016 2 55.00 30.29 0.00 55.32
10 A A1 19 ongoing cq nw br Construction of RMC road in Daulat Colony and Laying RMC M-20 in streets of New Madho Puri in ward no.19. RMC4 Daulat Colony and Laying RMC M-20 in streets of New Madho Puri in ward no.19. 75.90 62.41 Surya Construction A/br/2017/96 03/04/2017 3 100.00 9.36 51.20 11.21
11 A A1 19 ongoing other nw br Laying RMC M-20 in streets of Mohalla Sunder Nagar in ward no.19. RMC4 Mohalla Sunder Nagar in ward no.19. 32.63 28.01 The Lubana Co-op L&C Society Ltd. A/br/2017/112 05/07/2017 1 90.00 16.12 0.00 28.01
12 A A1 19 ongoing other nw br Extension of footpath providing, Swings and light in Park opp. Shifalli School in ward no.19. Parks Shifalli School in ward no.19. 4.26 3.90 The Samrala Co-op L&C Society Ltd. A/br/2017/113 10/07/2017 1 100.00 3.68 3.86 0.04
13 A A1 19 ongoing other nw br Laying RMC M-20 in streets of Basti Mani Singh st.no.4 & links and Kuldeep Nagar st.no.2,3 and link in ward no.19. RMC4 Basti Mani Singh st.no.4 & links and Kuldeep Nagar st.no.2,3 and link in ward no.19. 62.46 48.10 Ashok Kumar Sobti A/br/2017/138 07/12/2017 3 85.00 32.76 13.41 34.69
14 A A1 19 ongoing other nw br Laying RMC M-20 in Mahaveer Jain Colony Part-II in ward no.19 and Laying RMC in streets of Basti Mani Singh & Kuldeep Nagar st.no.1 in ward no.19. RMC4 Mahaveer Jain Colony Part-II in ward no.19 and Basti Mani Singh & Kuldeep Nagar st.no.1 in ward no.19. 51.57 39.68 Ashok Kumar Sobti A/br/2017/140 07/12/2017 3 90.00 12.86 18.47 21.21
15 A A1 19 ongoing other nw br Const. of RMC Road in Kirpal Nagar st.no.7 and link street in ward no.19. RMC4 Kirpal Nagar st.no.7 and link street in ward no.19. 20.37 18.33 M/s Ashok Kumar Sobti A/br/2016/64 23/08/2016 2 95.00 0.00 0.00 18.33
16 A A1 19 ongoing other nw br Const. of RMC Road in New Madho Puri st.no.9 and link streets of Prem Nagar main road in ward no.19. RMC4 New Madho Puri st.no.9 and link streets of Prem Nagar main road in ward no.19. 30.40 28.88 M/s Ashok Kumar Sobti A/br/2016/63 23/08/2016 2 95.00 8.91 18.69 10.19
17 A A1 19 ongoing other nw br Construction of mettaled Roads in various streets of ward no.19. Others in various streets of ward no.19. 93.32 89.12 C.H. Builders A/br/2016/241 27/05/2016 4 95.00 24.41 41.54 47.58
18 A A1 19 ongoing other nw br Re-carpeting of Sunder Nagar 70 feet Road and Daulat Colony Main Road in ward no.19. Others Sunder Nagar 70 feet Road and Daulat Colony Main Road in ward no.19. 81.52 77.85 Dass Builders Pvt. Ltd. A/br/2017/123 24/08/2017 3 100.00 31.88 61.00 16.85
19 A A1 19 ongoing other nw br Laying RMC M-20 in st.no.2,3,4,8 & links of st.no.8 in New Madho Puri in ward no.19. RMC4 New Madho Puri in ward no.19. 43.14 30.17 Ashok Kumar Sobti A/br/2018/190 27/04/2018 2 100.00 4.33 26.03 4.14
20 A A1 19 ongoing other nw br Laying RMC M-20 in st.no.9 & links of Kirpal Nagar & link streets of Prem Nagar in ward no.19. RMC4 Kirpal Nagar & link streets of Prem Nagar in ward no.19. 45.82 32.05 Ashok Kumar Sobti A/br/2018/191 27/04/2018 3 100.00 2.82 29.82 2.23
21 A A1 19 ongoing other nw br Laying RMC M-20 in st.no.11,12 & links in New Madho Puri & Jain Colony in ward no.19. RMC4 New Madho Puri & Jain Colony in ward no.19. 57.86 40.43 Navyug Company A/br/2018/6 03/05/2018 3 100.00 11.80 28.98 11.45
22 A A1 19 ongoing other nw br Laying BM/PC on Budha Nallah Road from New Madho Puri Bridge to National Highway Kirpal Nagar in ward no.19 (New w.no.58), Laying 20mm thick premix surfacing on Gaushalla Road in ward no.20. (New w.no.56) & Laying SDBC Concrete 30mm thickness on Main Road Bajwa Nagar and New Bajwa Nagar in ward no.21 (New w.no.61). Others Budha Nallah Road from New Madho Puri Bridge to National Highway Kirpal Nagar in ward no.19 (New w.no.58), Gaushalla Road in ward no.20. (New w.no.56) & Main Road Bajwa Nagar and New Bajwa Nagar in ward no.21 (New w.no.61). 81.25 68.85 J.K Incon Pvt. Ltd. A/br/2019/28 20/02/2019 5 0.00 0.00 0.00 68.85
23 A A1 19 ongoing cq nw br Laying RMC M-30 in st.no.1,2,3 & link street no.1,2,3 & 4 in Mahaveer Jain Colony in ward no.19. (New w.no.8) RMC6 St.no.1,2,3 & link street no.1,2,3 & 4 in Mahaveer Jain Colony in ward no.19. (New w.no.8) 50.03 34.96 NKC Constructions Private Limited A/br/2019/33 22/02/2019 3 0.00 0.00 0.00 34.96
24 A A1 19 ongoing cq nw br Laying RMC M-30 in st.no.16,17,18 & links in New Madho Puri in ward no.19. (New w.no.8) RMC6 St.no.16,17,18 & links in New Madho Puri in ward no.19. (New w.no.8) 51.06 34.91 Navyug Company A/br/2019/34 22/02/2019 3 5.00 0.00 0.00 34.91
25 A A1 21 ongoing cq nw br Prov. and Laying I/Tile 80 mm thick in area of Sub Zone A in Ward No. 21 ILT60 Prov. and Laying I/Tile 80 mm thick in area of Sub Zone A in Ward No. 21 78.22 69.19 Narinder Kumar and Co. A/br/2013/93 09/12/2013 6 100.00 75.69 75.69 -6.5
26 A A1 21 ongoing gq nw br Laying RMC M-20 in Dhandian Mohalla and links streets. (Mtc. with 5 years). RMC4 Dhandian Mohalla and links streets. 36.05 28.75 M/s Glisten Engineers & Contractor A/br/2015/162 31/08/2015 3 100.00 22.34 18.32 10.43
27 A A1 21 ongoing gq nw br Renovation of park near Police Post in Sunder Nagar. Others Near Police Post in Sunder Nagar. 3.57 3.39 M/s The Rajowal Co-op L/C Society Pvt. Ltd. A/br/2015/151 07/08/2015 1 100.00 0.97 2.24 1.15
28 A A1 21 ongoing gq mw br Maintenance works in streets of ward no.21 Others In streets of ward no.21 1.97 1.74 M/s The Samrala Co-op L/C society Ltd. Pvt. A/br/2015/186 23/10/2015 1 100.00 1.74 1.51 0.23
29 A A1 21 ongoing cq nw br Laying RMC M-20 in streets of Bajwa Nagar in w.no.21. RMC4 In streets of Bajwa Nagar. 32.37 25.78 M/s Glisten Engineers & Contractors A/br/2016/205 30/03/2016 3 100.00 9.86 10.68 15.1
30 A A1 21 ongoing other nw br Construction of brick masonry wall in Circular road near Balmik Ghatti. Others Circular road near Balmik Ghatti. 0.99 0.98 The Sunet Co-op L&C Society Ltd. A/br/2016/59 22/07/2016 1 100.00 0.83 0.00 0.98
31 A A1 21 ongoing other nw br Construction of cement Concrete road in Balmiki Ghati,Saidan Mohalla,Ghati Vadhera & Vaqilan Mohalla in w.no.21. (PIDB Work of Phase-I-Central) Others In Balmiki Ghati,Saidan Mohalla,Ghati Vadhera & Vaqilan Mohalla in W-21 41.13 40.71 Ashok Kumar Sobti A/br/2016/68 05/09/2016 2 30.00 0.00 0.00 40.71
32 A A1 21 ongoing other nw br Laying RMC in different streets of ward no. 21 (Part - I). (i) Laying PCC flooring in Purana Bazaar and links.(Part-I) (17.75), (ii) Laying PCC flooring in Purana Bazaar and links streets.(Part-II). (19.50), (iii) Laying RMC M-20 in Jain Santhanak in Sundar Nagar. (18.28), (iv) Construction of RMC roads in Sunder Nagar. (45.66), (v) Laying RMC M-20 in Sundar Nagar. (27.31). (PIDB Works of Phase-II-Central) RMC4 (i) Purana bazaar and links.(Part-I), (ii) Purana bazaar and links streets.(Part-II), (iii) Jain Santhanak in Sundar Nagar., (iv) Sunder Nagar (45.66), (v) Sundar Nagar. (27.31). 128.50 115.65 S.K Const. Co. A/br/2016/26 03/06/2016 4 90.00 14.04 78.44 37.21
33 A A1 21 ongoing other nw br Laying RMC in different streets of ward no.21 (Part - II). (i) Laying RMC M-20 in street no. 1,3 Kalyan Nagar & Wait Ganj main road in ward no. 21. (GQ) (25.49), (ii) Construction of RMC Road in Circular Road (7.17), (iii) Laying RMC in street no.5 & 8 of Guru Nanak Nagar and street no.1 of Balmiki Nagar. (24.76), (iv) Construction of cement concrete road Sunder Nagar (Khetan wali gali, Police Chowki Road others links in Sunder Nagar) Sadian chowk,Purna Bazar Road (Rai Bhadur Road) Vaqilan Mohalla & other links in w.no.21. (67.72). (PIDB of Works Phase-II-Central) RMC4 (i) In street no.1,3 Kalyan Nagar & Wait Ganj main road in ward no. 21., (ii) Circular Road, (iii) In street no.5 & 8 of Guru Nanak Nagar and street no.1 of Balmiki Nagar., (iv) Sunder Nagar (Khetan wali gali, Police chowki Road others links in Sunder Nagar) Sadian chowk,Purna Bazar Road (Rai Bha 125.14 112.63 S.K Const. Co. A/br/2016/27 03/06/2016 4 90.00 9.52 77.78 34.85
34 A A1 21 ongoing other nw br Re-carpeting road along Budha Nallah from Sunder Nagar Pulley to Madho Puri Pulley ward no.21. (PIDB Works of Phase-III-Central) Others Budha Nallah from Sunder Nagar Pully to Madho Puri Pully. 16.36 16.03 C.H. Builders Pvt. Ltd. A/br/2016/79 01/11/2016 1 0.00 0.00 0.00 16.03
35 A A1 21 ongoing other nw br Providing and fixing 60mm thick interlocking tiles in streets of New Madho Puri in ward no.21. ILT60 In streets of New Madho Puri in ward no.21. 9.44 7.45 The Sutlej Co-operative Labour & Construction Society Ltd. Ludhiana A/br/2018/169 29/01/2018 1 100.00 0.72 6.48 0.97
36 A A1 21 ongoing other nw br Laying RMC M-20 in st.no.1,2,3,6,7 & links in Sunder Nagar in ward no.21. RMC4 Sunder Nagar in ward no.21. 65.20 45.60 Ashok Kumar Sobti A/br/2018/188 27/04/2018 4 85.00 5.42 23.67 21.93
37 A A1 21 ongoing cq nw br Laying RMC M-30 in streets of Kalyan Nagar, Bajwa Nagar & New Bajwa Nagar & Balmik Mohalla Sardar Nagar in ward no.21. (New w.no.61 & 86) RMC6 Kalyan Nagar, Bajwa Nagar & New Bajwa Nagar & Balmik Mohalla Sardar Nagar in ward no.21. (New w.no.61 & 86) 43.66 30.96 Varinder Singh Govt. Contractor A/br/2019/35 22/02/2019 3 35.00 8.96 0.00 30.96
38 A A1 21 ongoing cq nw br Laying CC/RMC M-20 in streets of Mohalla Barahm Puri & Guru Nanak Dev Nagar, Balmik Mohalla street no.3,4,5 & 7 in ward no.21. (New w.no.61) RMC4 Mohalla Barahm Puri & Guru Nanak Dev Nagar, Balmik Mohalla street no.3,4,5 & 7 in ward no.21. (New w.no.61) 41.61 27.83 Capital Construction Co. A/br/2019/40 08/03/2019 3 0.00 0.00 0.00 27.83
39 A A1 21 ongoing cq nw br Laying RMC M-30 in street no.1,2,3 and links in Kalyan Nagar in ward no.61. RMC6 Street no.1,2,3 and links in Kalyan Nagar in ward no.61. 54.86 38.53 Navyug Company A/br/2019/48 08/03/2019 3 0.00 0.00 0.00 38.53
40 A A1 21 ongoing other nw br Construction of Lavortary Block in Child Grave Yard Shiv Puri Road in ward no.34 and Construction of Toilet Block near Dawer Market in ward no.21. Others Child Grave Yard Shiv Puri Road in ward no.34 and Toilet Block near Dawer Market in ward no.21. (New w.no.61 & 59) 7.15 6.89 Kohinoor Builders A/br/2018/2 03/05/2018 2 100.00 0.81 5.95 0.94
41 A A1 22 ongoing cq mw br Construction of streets with Ready Mix Concrete (M20 grade) in area of Sub Zone A-1(with Mtc.five years) (a) Provinding & Laying RMC in Basti Jodhewal St.no.1,2,4,5,7& links. RMC4 Basti Jodhewal st.no.1,2,4,5,7 & links 56.65 50.25 M/s Kabir Infra Pvt. Ltd., A/br/2013/96 09/12/2013 5 100.00 50.17 0.00 50.25
42 A A1 22 ongoing cq mw br Laying BM & PC in Mohalla Kabir Nagar. BMPC Kabir Nagar 10.03 8.50 M/s Shiva Construction A/br/2014/102 27/01/2014 3 100.00 8.50 0.00 8.5
43 A A1 22 ongoing gq nw br Renovation of the Senior Citizen Home at Sardar Nagar in ward no.22. (Revised Estimate) Others Sardar Nagar in ward no.22. 6.22 5.78 M/S Ravinder Kumar Takkar A/br/2016/202 11/03/2016 1 100.00 1.02 4.55 1.23
44 A A1 22 ongoing other nw br (i) Laying RMC M-20 in Sekhewal village road & links.(25.02), (ii) Construction of RMC road in Sarvanand Colony St.No.1, 3, 4, 5 & Link of St.No.6 and Farid Nagar St.No.1 in Ward No.22.(37.48). (PIDB Works of Phase-I-North) RMC4 (i) In Sekhewal village road & links. (ii) In Sarvanand Colony St.No.1, 3, 4, 5 & Link of St.No.6 and Farid Nagar St.No.1 in Ward No.22. 62.11 54.28 Subodh Batish A/br/2016/22 03/06/2016 3 82.00 11.75 33.38 20.9
45 A A1 22 ongoing other nw br (i) Laying RMC in streets of Jagdeep Nagar in w.no.22.(24.16), (ii) Laying RMC road in Sardar Nagar & Basti Gujran in w.no.22.(29.44), (iii) Laying RMC in streets of Farid Nagar in w.no.22.(20.56). (PIDB Works of Phase-I-North) RMC4 (i) In streets of Jagdeep Nagar in w.no.22., (ii) In Sardar Nagar & Basti Gujran in w.no.22., (iii) In streets of Farid Nagar in w.no.22. 72.92 65.63 Subodh Batish A/br/2016/14 03/06/2016 4 100.00 0.00 45.47 20.16
46 A A1 22 ongoing other nw br (i) Construction of RMC road in Bal Singh Nagar in w.no.22.( 35.16), (ii) Construction of RMC road in Kabir Nagar in ward no.22.(14.01) (PIDB Works of Phase-I-North) RMC4 (i) Bal Singh Nagar in w.no.22, (ii) Kabir Nagar in w. no.22. 48.36 43.52 Kohinoor Builder A/br/2016/15 03/06/2016 3 100.00 7.97 32.30 11.22
47 A A1 22 ongoing other nw br Laying RMC Road in Basti Jodhewal in w.no.22. (PIDB Work of Phase-I-North) RMC4 Basti Jodhewal in w.no.22. 54.66 49.19 Subodh Batish A/br/2016/207 22/04/2016 3 100.00 0.00 48.77 0.41999999999999
48 A A1 22 ongoing cq nw br Laying RMC M-20 in streets of near Gurudwara and street of Radhey Sham Mandir in Sardar Nagar in w.no.22. RMC4 Gurudwara and street of Radhey Sham Mandir in Sardar Nagar in w.no.22. 26.31 23.38 The Sutlej Co-op L&C Society Ltd. A/br/2016/88 29/12/2016 2 100.00 6.84 22.61 0.77
49 A A1 22 ongoing cq nw br Laying RMC M-20 in streets of Bal Singh Nagar st.no.0,st.no.9, Jagdeep Nagar st.no.1, Kabir Nagar street and links & Basti Jodhewal Saban wali gali in ward no.22. RMC4 Bal Singh Nagar st.no.0,st.no.9, Jagdeep Nagar st.no.1, Kabir Nagar street and links & Basti Jodhewal Saban wali gali in ward no.22. 65.61 53.15 M/s Gupta Contractors Pvt. Ltd. A/br/2017/108 20/04/2017 3 100.00 37.46 20.15 33
50 A A1 22 ongoing other nw br Laying RMC M-20 in streets of Sarwanand Colony and Farid Nagar in ward no.22. RMC4 Sarwanand Colony and Farid Nagar in ward no.22. 20.72 17.86 The Suraj Co-op L&C Society Ltd. A/br/2017/125 07/12/2017 2 100.00 0.76 16.97 0.89
51 A A1 22 ongoing other nw br P/Laying 60mm thick I/tiles in narrow streets of Basti Jodhewal in ward no.22. ILT60 Basti Jodhewal in ward no.22. 12.76 10.99 The Suraj Co-op L&C Society Ltd. A/br/2017/127 07/12/2017 2 100.00 5.87 0.00 10.99
52 A A1 22 ongoing other nw br Laying RMC M-20 in Bal Singh Nagar st.no.5,8 & 9, Vishwakarma Colony st.no.8 other links & Sardar Nagar Balance Area in ward no.22. RMC4 Bal Singh Nagar st.no.5,8 & 9, Vishwakarma Colony st.no.8 other links & Sardar Nagar Balance Area in ward no.22. 51.00 36.00 Apex Developers A/br/2018/166 29/01/2018 3 60.00 7.17 11.09 24.91
53 A A1 22 ongoing other nw br Laying RMC M-20 in st.no.7 & link street of Bal Singh Nagar & Basti Gujran in ward no.22. RMC4 In st.no.7 & link street of Bal Singh Nagar & Basti Gujran in ward no.22. 60.03 40.62 Navyug Company A/br/2018/168 29/01/2018 3 100.00 7.72 27.82 12.8
54 A A1 22 ongoing other nw br P/fixing speed bumps in area of ward no.22. Others In area of ward no.22 5.72 3.71 The Rajowal Co-op L&C Society Ltd. A/br/2018/183 24/04/2018 1 90.00 3.09 0.00 3.71
55 A A1 22 ongoing other nw br Laying BM/PC on Main Road Bal Singh Nagar, Sardar Nagar & Kabir Nagar in ward no.22. BMPC Main Road Bal Singh Nagar, Sardar Nagar & Kabir Nagar in ward no.22 66.38 63.73 Dass Builders Pvt. Ltd. A/br/2018/187 24/04/2018 3 0.00 0.00 0.00 63.73
56 A A1 22 ongoing other nw br Laying 30mm thick SDBC on Main Old Rahon Road in ward no.22. (New w.no.86) SDBC Main Old Rahon Road in ward no.22. (New w.no.86) 52.69 45.63 NKC Constructions Private Limited A/br/2019/29 22/02/2019 3 5.00 0.00 0.00 45.63
57 A A1 22 ongoing cq nw br Laying RMC M-20 in streets of Guru Nanak Dev Nagar in new ward no.86. RMC4 Guru Nanak Dev Nagar in new ward no.86. 62.45 40.46 Capital Construction Co. A/br/2019/41 08/03/2019 3 25.00 8.14 0.00 40.46
58 A A1 22 ongoing cq nw br Laying RMC M-30 in st.no.5 & 6 Guru Nanak Dev Nagar in (new w.no.86) and P/Laying 60mm thick I/tiles in various streets of Mohalla Gandhi Nagar in (new w.no.85). Others St.no.5 & 6 Guru Nanak Dev Nagar in (new w.no.86) and P/Laying 60mm thick I/tiles in various streets of Mohalla Gandhi Nagar in (new w.no.85). 60.83 43.09 Varinder Singh Govt. Contractor A/br/2019/50 08/03/2019 3 5.00 0.00 0.00 43.09
59 A A1 23 ongoing gq mw br Laying 20mm thick mix seal surface on main Sekhewal road. BMPC Sts. of Preetam Puri 17.28 15.78 Narinder Kumar & Co. A/br/2014/227 16/07/2014 2 100.00 18.66 0.00 15.78
60 A A1 23 ongoing cq mw br Providing and Fixing Interlocking tiles/paver block 60/80mm thick in area of Sub Zone A-1( with Mtc. Of five years) (a) Laying I/T flooring in Dhaliwal street backside of Chaudury Dhaba New Shiv Puri Part-II ILT80 Dhaliwal Street backside Dhaba New Shivpuri Part-II 69.87 62.11 M/s S.K. Const. Co. A/br/2013/92 09/12/2013 6 100.00 70.35 57.10 5.01
61 A A1 23 ongoing mplad nw br Renovation of Guru Ravi Dass Dharamshala in st.no.4 Santokh Nagar (ward no.23) under MP LAD funds. Buildings In st.no.4 Santokh Nagar 5.00 4.73 M/s The National Co-op L/C society Ltd. Pvt. A/br/2015/160 31/08/2015 3 100.00 4.35 0.00 4.73
62 A A1 23 ongoing cq nw br P/fixing sign board & speed bumps in ward no.23. Others In area of ward no.23. 7.00 6.45 The Samrala Co-op L&C Society Ltd. A/br/2016/50 14/07/2016 1 100.00 2.51 2.91 3.54
63 A A1 23 ongoing other nw br (i) Laying RMC in streets of New Shiv Puri (Part-ii) in w.no.23 (25.24), (ii) Laying RMC M-30 over CC 1:5:10 on Main Preetam Puri along Budha Nallah ward no.23.(25.62). (PIDB Works of Phase-I-North) RMC4 (i) New Shiv Puri (Part-ii) in w.no.23, (ii) Main Preetam Puri along Budha Nallah ward no.23. 49.93 44.94 Subodh Batish A/br/2016/16 03/06/2016 3 100.00 0.00 41.89 3.05
64 A A1 23 ongoing other nw br Construction of metalled road in various streets of w.no. 23. (i) Rejuvenation of main road Jaswant Nagar in ward no.23. (38.56)., (ii) Construction of Mettaled Road in Streets of Mohalla Surinder Park. (34.50). (PIDB Works of Phase-II-North) Others (i) Main Road Jaswant Nagar in ward no.23., (ii) In Streets of Mohalla Surinder Park in w.no.26. 73.06 69.77 CH Builders Pvt. Ltd. A/br/2016/7 27/05/2016 3 80.00 0.00 0.00 69.77
65 A A1 23 ongoing other nw br Laying RMC in different streets of ward no. 23. (i) Laying RMC in street of New Shiv Puri in w.no.23. (44.22)., (ii) Laying RMC M20 in st.no.4�,6, 6� & links of Santokh Nagar in W.No. 23 (36.99)., (iii) Construction of RMC road in Jaswant Nagar in ward no.23. (21.96)., (iv) Construction of RMC Road in Santokh Nagar, St. No. 4E7 to 4E12 & links, Haryana Mandir street. (61.13). (PIDB Works of Phase-II-North) RMC4 (i) New Shiv Puri in w.no.23., (ii) In st.no.4�,6, 6� & links of Santokh Nagar in W.No. 23., (iii) Jaswant Nagar in w. no.23., (iv) Santokh Nagar, St. No. 4E7 to 4E12 & links, Haryana Mandir street. 164.30 147.87 Kabir Infra Pvt. Ltd A/br/2016/23 03/06/2016 5 80.00 25.54 67.10 80.77
66 A A1 23 ongoing cq nw br Repair and renovation of Green Belt/Park in ward no.23. (Revised Estimate) Others In ward no.23. 12.09 9.23 The Sutlej Co-op L&C Society Ltd. A/br/2017/95 03/04/2017 2 100.00 11.07 7.34 1.89
67 A A1 23 ongoing other nw br Laying RMC in streets of Mohalla New Shiv Puri (Part-II) back side of Aman Sweet Shop in ward no.23. RMC4 Mohalla New Shiv Puri (Part-II) back side of Aman Sweet Shop in ward no.23. 13.56 12.05 The Khairey Co-op L/C Society Ltd. A/br/2017/129 07/12/2017 2 100.00 10.46 0.00 12.05
68 A A1 23 ongoing other nw br Laying RMC M-20 in streets of Santokh Nagar st.no.5,6,7,8 & 10 links in ward no.23. RMC4 Santokh Nagar st.no.5,6,7,8 & 10 links in ward no.23. 94.51 73.09 Ashok Kumar Sobti A/br/2017/130 07/12/2017 4 100.00 7.13 56.96 16.13
69 A A1 23 ongoing other nw br Laying RMC M-20 in st.no.6 ½, 8, 8 ½, 9 & links of Santokh Nagar in ward no.23. RMC4 Santokh Nagar in ward no.23. 42.11 28.82 Capital Construction Company A/br/2018/164 29/01/2018 2 0.00 0.00 0.00 28.82
70 A A1 23 ongoing other nw br Laying RMC M-20 in streets of New Shiv Puri (Part - II) in ward no.23. RMC4 New Shiv Puri (Part - II) in ward no.23. 41.00 28.65 Apex Developers A/br/2018/165 29/01/2018 2 90.00 15.12 25.10 3.55
71 A A1 23 ongoing other nw br Laying RMC M-20 in st.no.9, 9 ½, 8 ½, 8 & 7 to 9 ½ in Santokh Nagar in ward no.23. RMC4 In st.no.9, 9 ½, 8 ½, 8 & 7 to 9 ½ in Santokh Nagar in ward no.23. 52.26 35.77 Capital Construction Company A/br/2018/167 29/01/2018 3 80.00 10.45 13.43 22.34
72 A A1 23 ongoing other nw br Laying BM/PC on Links of New Shiv Puri Part-II from New Shiv Puri Main Road to Sekhewal Road in ward no.23. BMPC New Shiv Puri Part-II from New Shiv Puri Main Road to Sekhewal Road in ward no.23. 66.40 63.75 IHR Associates A/br/2018/193 03/05/2018 3 0.00 0.00 0.00 63.75
73 A A1 23 ongoing other nw br Laying BMPC on Links of New Shiv Puri Part-II from New Shiv Puri Main Road to Sekhewal Road in ward no.23. BMPC New Shiv Puri Part-II from New Shiv Puri Main Road to Sekhewal Road in ward no.23. 66.40 63.75 IHR Associates A/br/2018/193 03/05/2018 3 0.00 0.00 0.00 63.75
74 A A1 23 ongoing cq nw br Laying BM/PC on Sekhewal Road & Santokh Nagar st.no.4 in ward no.23. (New w.no.88) BMPC Sekhewal Road & Santokh Nagar st.no.4 in ward no.23. (New w.no.88) 91.94 78.04 NKC Constructions Private Limited A/br/2019/31 22/02/2019 5 5.00 0.00 0.00 78.04
75 A A1 35 ongoing cq mw br (e) Const.of pulley & provision of M.H's on nallah including wearing coat on slab in ward no.35 Others on Nallah including wearing coar on slab 15.35 12.55 M/s K.C Builders A/br/2013/82 05/12/2013 2 100.00 12.55 0.00 12.55
76 A A1 35 ongoing cq nw br Laying 60mm thick I/tiles in treets of Gujjar Mal Road. ILT60 Streets of Gujjar Mal Road. 8.99 6.69 Sona International A/br/2013/97/35/1 09/12/2013 5 100.00 8.99 0.00 6.69
77 A A1 35 ongoing cq nw br Providing /Laying 80mm thick I/T flooring in street in Kuchha Laxmi Narayan. ILT80 street of Kucha Laxmi Naryan 9.12 7.45 K.C. Builders A/br/2013/87/19/1 09/12/2013 5 100.00 7.45 0.00 7.45
78 A A1 35 ongoing cq nw br Laying I/T flooring in street Narian Mohalla. ILT80 Narian Mohalla 16.81 13.74 K.C. Builders A/br/2013/87/35/1 09/12/2013 5 100.00 13.74 0.00 13.74
79 A A1 35 ongoing cq nw br Laying I/T flooring in Gandhi gali in Chaura Bazar. ILT60 Gandhi Gali in Chaura Bazar 3.70 3.03 K.C. Builders A/br/2013/87/35/2 09/12/2013 5 100.00 3.03 0.00 3.03
80 A A1 35 ongoing cq nw br Laying I/T flooring in b/s Petian wali gali Opp. Shiv Durga Mandir. ILT60 Petian Wali Gali opp. Shiv Durga mandir 11.45 9.36 K.C. Builders A/br/2013/87/19/4 09/12/2013 5 100.00 9.36 0.00 9.36
81 A A1 35 ongoing cq nw br Laying Providing I/t in town hall Partap Bazaar and Niggar Mandi W.No.35 ILT60 Town Hall, Partap Bazar and Niggar Mandi. 19.20 13.33 Singla and Co. A/br/2013/94/35 09/12/2013 2 100.00 13.33 0.00 13.33
82 A A1 35 ongoing gq nw br Special repair and renovation of toilets of Area of ward no.35 in sub zone-A1. Others Area of ward no.35 in sub zone-A1. 5.00 4.75 M/s The Doraha Co-op L/C Society Pvt. Ltd. A/br/2015/161 31/08/2015 2 0.00 0.00 0.00 4.75
83 A A1 35 ongoing gq mw br Maintenance works in streets of ward no.35. Others In streets of ward no.35. 1.99 1.98 M/s The Gill Co-op Society Ltd. A/br/2015/187 23/10/2015 1 100.00 0.00 0.00 1.98
84 A A1 35 ongoing gq nw br Patch work of PCC streets in area of ward no.35. PCC In area of ward no.35. 4.87 4.09 The Samrala Co-op L/C Society Ltd. A/br/2016/201 15/02/2016 1 100.00 4.09 3.56 0.53
85 A A1 35 ongoing cq nw br Laying RMC on streets of Deepak Cinema Road, Nali Mohalla Bhadaur House and Bagh Khajanchian. RMC4 Cinema Road, Nali Mohalla Bhadaur House and Bagh Khajanchian. 40.97 35.37 Navyug Company A/br/2016/51 14/07/2016 2 100.00 19.72 27.72 7.65
86 A A1 35 ongoing other nw br (i) Laying RMC in Kucha Karta Ram,Plahi Bazaar,Hindi bazaar, Kishor road to Sakhi Mandir road ,Kucha Soodan and Ram Mandir gali in w.no.35.(22.36), (ii) Construction of CC road in Rupa Mistry wali gali, Malari gali & Bagh wali gali in w. no.35.(15.31), (iii) Laying PCC in street Prem Gali.(5.50). (PIDB Works of Phase-I-Central) Others (i) Kucha Karta Ram,Plahi Bazaar,Hindi bazaar, Kishor road to Sakhi Mandir road ,Kucha Soodan and Ram Mandir gali., (ii) Rupa Mistry wali gali, Malari gali & Bagh wali gali in w. no.35., (iii) In street Prem Gali in w.no.35. 42.49 37.98 Rai Const.Co A/br/2016/55 18/07/2016 2 40.00 10.71 0.00 37.98
87 A A1 35 ongoing other nw br Laying RMC in different streets of ward no.35. (i) Construction RMC Road Pindi Street in w.no.35 (7.67)., (ii) Construction of RMC road in Sangla Shivala in w . no.35. (10.41)., (iii) Construction of Cement Concrete road in Chawal Bazar in w. no.35. (9.74)., (iv) Laying Cement Concrete in streets of Arya Mohalla, Arya School road, Deepak Cinema road, Soodan Mohalla & Thapparn Mohalla in w.no.35. (29.77). (PIDB Works of Phase-II-Central) RMC4 (i) Pindi Street in w.no.35., (ii) Sangla Shivala in w no.35., (iii) Chawal Bazar in w no.35., (iv) Arya Mohalla, Arya School road, Deepak Cinema road, Soodan Mohalla & Thapparn Mohalla in w.no.35. 57.59 49.03 P. P. Enterprises A/br/2016/1 27/05/2016 2 65.00 23.95 0.00 49.03
88 A A1 35 ongoing cq nw br Rejuvenation of main Maleri gali and Bagh wali gali in w.no.35. Others Maleri gali and Bagh wali gali in w.no.35. 22.40 22.37 M/s IHR Associates A/br/2016/89 29/12/2016 2 100.00 18.81 0.00 22.37
89 A A1 35 ongoing cq nw br Laying RMC M-20 in streets of Patiya wali gali links, Lalu Mal gali & Katchi gali between Chaura Bazar, Dal Bazar in ward no.35. Laying CC streets of Meena Bazar, Sangla Shivala Road and Vikas Nagar in ward no.35. RMC4 Patiya wali gali links, Lalu Mal gali & Katchi gali between Chaura Bazar, Dal Bazar in ward no.35 & Meena Bazar, Sangla Shivala Road and Vikas Nagar in ward no.35. 91.80 89.69 M/s Navyug Company A/br/2017/107 10/04/2017 4 70.00 5.68 67.00 22.69
90 A A1 35 ongoing other nw br Construction of cement concrete road in Dal Bazar in ward no.35. Others Dal Bazar in ward no.35. 6.62 5.94 The Lubana Co-op Labour & Construction Society Ltd. A/br/2017/143 29/12/2017 2 100.00 5.17 0.00 5.94
91 A A1 35 ongoing other nw br Laying RMC M-20 in Kucha Lakshami Narayan main street and main road and links of Narriya Mohalla, Laying RMC M-20 in Niggar Mandi opp. Akal Market Mata Rani Road and Chargiya Mohalla and Laying interlocking tiles in Parking of Bhadaur House in ward no.35 near Indian Coffee House. Others Kucha Lakshami Narayan main street and main road and links of Narriya Mohalla & Niggar Mandi opp. Akal Market Mata Rani Road and Chargiya Mohalla & Bhadaur House in ward no.35 near Indian Coffee House. 56.04 46.47 Ashok Kumar Sobti A/br/2018/189 27/04/2018 4 70.00 9.83 19.22 27.25
92 A A1 35 ongoing other nw br Laying RMC M-30 in street of Namak Mandi & links, Bans Mandi Bagh Khajanchia in ward no.35. RMC6 Namak Mandi & links, Bans Mandi Bagh Khajanchia in ward no.35. 58.76 48.66 Ashok Kumar Sobti A/br/2018/192 27/04/2018 4 0.00 0.00 0.00 48.66
93 A A1 35 ongoing other nw br Laying CC in streets of Sati Soodan, Likhia Mohalla & links street in ward no.35. Others Sati Soodan, Likhia Mohalla & links street in ward no.35. 8.23 7.32 The Lubana Co-op Labour & Construction Society Limited A/br/2018/8 08/05/2018 3 0.00 0.00 0.00 7.32
94 A A1 35 ongoing other nw br Repair of slab on Nallah in Akalgarh Market in ward no.35 (New w.no.60) Others Akalgarh Market in ward no.35 (New w.no.60) 1.00 0.97 M/s Prince Sharma A/br/2018/17 25/07/2018 1 0.00 0.00 0.00 0.97
95 A A1 35 ongoing other mw br Annual Maintenance & Repair of Municipal Corporation Zone-A Main Office near Mata Rani Chowk. (Time Limit 1 Year) Others Near Mata Rani Chowk. 9.55 8.20 The Mohi Co-op L And C Society Ltd. A/br/2019/25 20/02/2019 1 0.00 0.00 0.00 8.2
96 A A1 35 ongoing other nw br Laying RMC M-30 in Soodan Mohalla Part-II & Kucha Mangat Rai in ward no.35 & Laying RMC M-30 in Mali Ganj Main Road, Soodan Mohalla & links in ward no.35. (New w.no.60) RMC6 Soodan Mohalla Part-II & Kucha Mangat Rai in ward no.35 & Mali Ganj Main Road, Soodan Mohalla & links in ward no.35. (New w.no.60) 53.82 38.46 NKC Constructions Private Limited A/br/2019/26 20/02/2019 3 0.00 0.00 0.00 38.46
97 A A2 20 ongoing cq mw br Providing and Fixing Interlocking tiles/paver block 60mm thick in area of sub zone A2 (with amintenance of 5 years) in ward no.20 (a) Laying 60 mm I/T flooring in Mehmoodpura and Ashok street ,Ram Nagar , Nalwanda street , Sandha street , Beliram street & Kucha Satto ILT60 Mehmoodpura and Ashok street ,Ram Nagar , Nalwanda street , Sandha street , Beliram street & Kucha Satto. 55.50 54.10 M/s Gupta Contractors Pvt.Ltd. A/br/2013/88 09/12/2013 4 100.00 37.08 0.00 54.1
98 A A2 20 ongoing cq nw br Laying I/T in links of Madho Puri st.no.2,3,4,5 & 6 w.no.20 (Out of Esti.Providing and Fixing Interlocking tiles/paver block 60mm thick in area of sub zone A1 & A2 (With maintenance of 5 years) in Ward No.20 & 35 (G.Q) Esti,Amt 60.69 Lacs And Ten.Amt-45.12 Lacs ILT60 Links of St. No. 2,3,4,5 and 6 of Madhopuri 24.84 18.47 Sona International A/br/2013/97/20/1 09/12/2013 5 100.00 34.63 0.00 18.47
99 A A2 20 ongoing cq nw br Laying I/T in Madho Puri st.no.2,3,4,5 w.no.20 (Out of Esti.Providing and Fixing Interlocking tiles/paver block 60mm thick in area of sub zone A1 & A2 (With maintenance of 5 years) in Ward No.20 & 35 (G.Q) Esti,Amt 60.69 Lacs And Ten.Amt-45.12 Lacs ILT60 Street No. 2,3,4 and 5 Madhopuri 27.05 20.12 Sona International A/br/2013/97/20/2 09/12/2013 5 100.00 34.63 0.00 20.12
100 A A2 20 ongoing gq nw br Laying RMC M20 Grade in Tilak Nagar. R-RMC Tilak Nagar. 32.06 26.59 M/s Inderjit Bajaj A/br/2014/114 11/02/2014 3 100.00 8.20 15.74 10.85
101 A A2 20 ongoing cq nw br Laying RMC M-20 in Madho Puri near Dr.Karam Chand Sood and Gau Shala Part (B). R-RMC Madho Puri near Dr.Karam Chand Sood and Gau Shala Part (B). 36.92 28.21 M/s Subodh Batish A/br/2015/(159) 31/08/2015 4 100.00 0.00 0.00 28.21
102 A A2 20 ongoing cq nw br P/F 60mm thick I/tiles in street of Gulchaman gali. (Revised) ILT60 Gulchaman gali. 60.37 55.68 M/s Gupta Cont.Pvt.Ltd. A/br/2015/164 31/08/2015 5 100.00 55.68 40.76 14.92
103 A A2 20 ongoing other nw br (i) Laying of Interlocking Tiles in the streets of Bajrian Mohalla & Bangru Mohalla W-20.(30.39). (ii) Laying of Interlocking Tiles in the streets near Chauri sarak W-20 (31.43). (iii) Laying of Interlocking Tiles in the streets of mehmood Pura & Madhopuri W-20 (14.21). (PIDB work Phase-I Central) ILT60 (i) Bajrian Mohalla & Bangru Mohalla (ii) near Chauri sarak (iii) mehmood Pura & Madhopuri W-20 75.80 74.13 Navyug Company A/br/2016/69 08/09/2016 3 60.00 24.48 12.49 61.64
104 A A2 20 ongoing other nw br Laying RMC M-20 in Streets of Madho Puri gali no.1 & links Part (A). (PIDB work Phase-I Central) RMC4 Madho Puri gali no.1 & links Part (A). 27.19 26.10 The Rajowal Co-op Society Pvt. Ltd. A/br/2016/238 10/05/2016 2 80.00 10.72 7.79 18.31
105 A A2 20 ongoing other nw br (i) Laying 30mm thick SDBC from Circular road Ghaushalla to Ghati Balmik chowk in w.no.20. (21.41) (ii) Laying 30mm thick SDBC from Division no.3 to Madhopuri chowk to Wait Ganj road in w.no.20. (37.15) (PIDB work Phase-II Central) SDBC (i) from Circular road Ghaushalla to Ghati Balmik chowk in w.no.20. (ii) Division no.3 to Madhopuri chowk to Wait Ganj road in w.no.20. 58.56 55.92 IHR Associates A/br/2016/41 24/07/2016 3 95.00 0.00 0.00 55.92
106 A A2 20 ongoing other nw br Laying 60mm thick I/tiles in streets of Wait Ganj and near Wait Ganj in w.no.20. (PIDB work Phase-II Central) ILT60 Wait Ganj and near Wait Ganj in w.no.20. 20.57 18.92 C J Builders A/br/2016/29 03/06/2016 1 100.00 4.35 11.24 7.68
107 A A2 20 ongoing other nw br (i) Laying RMC M-20 in Street of Hazuri Road. (23.63) (ii) Laying RMC 4" thick in street of Madho Puri st.no.7 & links in ward no.20. (44.49) (PIDB work Phase-II Central) RMC4 (i) Hazuri Road (ii) Madho Puri st.no.7 & links in ward no.20. 68.12 61.30 Navyug Company A/br/2016/240 27/05/2016 3 70.00 9.63 30.49 30.81
108 A A2 20 ongoing gq mw br Repair & Upgradation of Office Building Subzone A2 6.24. Others Office Building Subzone A2 6.24 5.49 The Lubana Co-op Labour & Construction Society Ltd. LDH. A/br/2017/133/EEA 07/12/2017 3 20.00 0.00 0.00 5.49
109 A A2 20 ongoing gq nw br Laying RMC M-20 in streets of Madhopuri ward no.20 and (Related this work A-1) Laying RMC M-20 in street near Kochar Bakery and Vipan Karyana Store Vishnu Puri.) RMC4 Madhopuri 52.05 42.89 NAVYUG COMPANY A/br/2017/106/EEA 10/04/2017 2 74.00 0.00 0.00 42.89
110 A A2 20 ongoing gq nw br P/F speed breakers & bump sign boards in area of ward no.20. (Related this work A-1) Renovation of park on Old G.T Road near Chaman Devi School in ward no.24 and Maintenance of Park in New Vishnupuri in ward no.24. Others speed breakers & bump sign boards 35.70 42.89 S K CONSTRUCTION CO. A/br/2017/114/EEA 28/07/2017 2 0.00 0.00 0.00 42.89
111 A A2 36 ongoing cq nw br Laying 60 mm I/T flooring in street of Gawala Mohalla ILT60 Streets of Gwala Mohalla 5.97 5.61 S.k.Const. Co, A/br/2013/84/36/1 09/12/2013 3 100.00 29.06 0.00 5.61
112 A A2 36 ongoing cq nw br Laying 60 mm I/T flooring in streets near by KC Gas company and Burma Shell ILT60 Streets near K.C. Gas and Burma Steel 3.41 3.20 S.k.Const. Co, A/br/2013/84/36/2 09/12/2013 3 100.00 29.06 0.00 3.2
113 A A2 36 ongoing cq nw br Prov. and Fixing Pcc Kerbs and 80mm I/T on both sides of Road of KareemPura Chowk to Lakkar Bazar ILT80 Sides of Road from Karimpura Chowk to Lakkar Bazar 18.06 16.97 S.k.Const. Co, A/br/2012/84/36/3 09/12/2012 3 100.00 29.06 0.00 16.97
114 A A2 36 ongoing cq nw br Laying RMC 4'' in street of Fied Ganj Kucha no.5 & 7 RMC4 Streets of Field Ganj Kucha No. 5 and 7 31.82 29.89 S.k.Const. Co, A/br/2013/80/36/1 05/12/2013 5 80.00 28.96 0.00 29.89
115 A A2 36 ongoing cq nw br Laying RMC 6'' in Thapar wali gali near Govt. High School Lakkar Bazar RMC6 Thapar Wali Gali near Govt. High School Lakkar Bazar 12.96 12.18 S.k.Const. Co, A/br/2013/80/36/2 05/12/2013 3 100.00 28.96 0.00 12.18
116 A A2 36 ongoing cq nw br Widening and strengthing of road by Laying BM & PC on Shapur road in ward no.36. BMPC Shapur road in ward no.36. 42.69 33.92 M/s Dass Builders A/br/2015/181 16/10/2015 4 95.00 32.49 0.00 33.92
117 A A2 36 ongoing other nw br (i) Laying RMC M20 in streets of Shehzada Mohalla.(11.47). (ii) Laying RMC M20 in Kucha Dhiman Near Kumar Ice Cream.(7.18). (iii) Laying RMC M20 in Street of Bhatra Mohalla & Sikha Wali Gali.(26.82). (PIDB Work of Phase-I-North) RMC4 (i) Shehzada Mohalla. (ii) Kucha Dhiman Near Kumar Ice Cream.(iii) 44.64 43.30 Navyug Company A/br/2016/60 29/07/2016 2 75.00 6.78 21.09 22.21
118 A A2 36 ongoing other nw br Laying RMC M-20 in Prabhakar Mohalla and Sukh Ram Nagar streets in w.no.36. (47.65) (PIDB work Phase-II North) RMC4 Prabhakar Mohalla and Sukh Ram Nagar streets in w.no.36. 47.65 41.00 P P Enterprises A/br/2016/02 27/05/2016 2 80.00 22.63 0.00 41
119 A A2 36 ongoing other nw br Laying 60mm thick interlocking tiles in street of Gwalla Mohalla in ward no.36. (PIDB work Phase-II North) ILT60 Gwalla Mohalla in ward no.36 6.63 5.96 Singh Infracon A/br/2016/53 18/07/2016 1 90.00 0.00 0.00 5.96
120 A A2 36 ongoing other nw br (i) Laying 30mm thick SDBC on Shaheed Bhagat Singh and Gurudwara Dukh Niwaran Sahib Road in ward no.36. (23.34) (ii) Laying 20mm thick premix surfacing on Kreempura Bazar and Lakkar Bazar Road in ward no.36. (10.83) (PIDB work Phase-II North) SDBC (i) Shaheed Bhagat Singh and Gurudwara Dukh Niwaran Sahib Road in ward no.36. (ii) Kreempura Bazar and Lakkar Bazar Road in ward no.36. 34.17 32.63 Dass Builders Pvt. Ltd. A/br/2016/38 24/06/2016 2 95.00 0.00 0.00 32.63
121 A A2 36 ongoing gq nw br Laying RMC M-20 in Thapar PCO Street Karimpura Bazar Ward No-36. RMC4 Thapar PCO Street Karimpura Bazar 4.98 4.43 The Sutlej Co-op Labour & Construction Society Ltd. LDH. A/br/2017/132/EEA 07/12/2017 3 0.00 0.00 0.00 4.43
122 A A2 36 ongoing gq nw br P/Laying RMC M 20 in the street of Kutcha Harnam Dass ward no.36 RMC4 Kutcha Harnam Dass 12.46 11.92 The Sutlej CO-OP Labour Construction Society Ltd. A/br/2017/137/EEA 07/12/2017 2 100.00 7.87 0.00 11.92
123 A A2 36 ongoing cq nw br Providing and fixing paver block I/tiles and RMC M-20 in area of Sub Zone-A2 in ward no.36. Others In area of Sub Zone-A2 in ward no.36. 72.22 67.84 S.K. Construction Co. A/br/2013/84 09/12/2013 3 100.00 23.24 46.14 21.7
124 A A2 36 ongoing cq nw br Laying RMC M-30 in Various Streets of Gulchaman Gali in Ward No-56, Laying RMC M-30 in Various Streets of Madhopuri Near Ghati Balmiki in ward No-56, Laying RMC M-30 in Various Streets of Madhopuri (Near Gaushalla) in Ward No-56 and Laying RMC M-30 on the berms of Gokul Road from Khawaja Chowk to Aggarsain Park to Rekhi Cinema Road in ward no.64 & 56. RMC6 Various Streets of Gulchaman Gali in Ward No-56, Various Streets of Madhopuri Near Ghati Balmiki in ward No-56 & Gokul Road from Khawaja Chowk to Aggarsain Park to Rekhi Cinema Road in ward no.64 & 56. 48.40 36.30 M/S Ashok Kumar Sobti A/br/2019/57 08/03/2019 3 35.00 3.73 0.00 36.3
125 A A2 36 ongoing other nw br Laying 20mm thick premix surfacing on Machine Bazar, Kareempura Chowk to Nanu Mal Halwai Chowk in ward no.36 & 37. Others Machine Bazar, Kareempura Chowk to Nanu Mal Halwai Chowk in ward no.36 & 37 28.37 27.23 Somaya Infrastructure A/br/2018/8 08/05/2018 3 40.00 6.79 0.00 27.23
126 A A2 37 ongoing cq nw br Laying 60mm & 80mm I/T flooring in Mothu Ram Dharmshala street & around H.No.402 ,409, 537,288,569 Naya Mohalla street & Nanti school, Nim wala Chowk & Raja Band stre Baba Rhan singh chowk in ward no.37 ILT60 Mothu Ram, Dhani Ram Street arround h. no. 407. 409, 537, 286, 589 Naya Mohalla street Nirankari Chowk and Raja Band Street Baba Than Singh Chowk 33.23 28.22 M/s Dass Builders Pvt.Ltd . A/br/2013/83/37/1 09/12/2013 3 100.00 36.41 0.00 28.22
127 A A2 37 ongoing cq mw br Rehmatula road and Chada road BMPC Rehmatula road and Chada road 17.02 14.42 M/s Shiva Constructions A/br/2014/102 27/01/2014 3 95.00 0.00 0.00 14.42
128 A A2 37 ongoing gq nw br Repair of fountain in Naulakha Garden Colony in ward no.37. Others Naulakha Garden Colony 0.98 0.74 The Rajowal Co-op Society Ltd. A/br/2016/199 20/01/2016 1 100.00 0.64 0.00 0.74
129 A A2 37 ongoing other nw br Providing/ laying 60mm thick interlocking Tiles in street Iqbal Ganj, Gopal Mandir, Hanuman Mandir Khud Mohalla W.no.37. (PIDB work Phase-I Central) Others (i) Iqbal Ganj, Gopal Mandir, Hanuman Mandir Khud Mohalla W.no.37. 35.18 33.77 The Dehlon Harijan Co-op L/C Society Ltd. A/br/2016/236 10/05/2016 2 90.00 5.17 14.36 19.41
130 A A2 37 ongoing other nw br (i) Laying RMC M-20 in Street of Naya Mohalla. (26.17) (ii) Laying RMC M-20 in St of Mochpura Bazar, Rari Mohalla. (34.22) PIDB work Phase-II Central) RMC4 (i) Naya Mohalla. (ii) Mochpura Bazar, Rari Mohalla. 60.39 51.26 PP Enterprises A/br/2016/239 27/05/2016 2 60.00 12.09 0.00 51.26
131 A A2 37 ongoing cq nw br Repair of foothpath & P/F I/tiles in Naulakha Garden Colony Park in w.no.37. Others Naulakha Garden Colony Park in w.no.37. 4.34 3.63 The Samrala Co-op L&C Society Ltd. A/br/2016/92 29/12/2016 2 100.00 3.79 0.00 3.63
132 A A2 37 ongoing other nw br Laying RMC M-20 in streets of opp. Ganesh Mandir Nim Chowk Mahanta Wali Gali in ward no.37. RMC4 Ganesh Mandir Nim Chowk Mahanta Wali Gali in ward no.37. 16.40 15.58 The Lubana Co-op L/C Society Ltd. A/br/2017/103 05/04/2017 2 80.00 8.32 5.00 10.58
133 A A2 37 ongoing gq nw br Laying RMC M20 in Rehmatulla Road Streets, Iqbal Ganj Streets & Sikandari Road Streets in Ward No-37 RMC4 Rehmatulla Road Streets, Iqbal Ganj Streets & Sikandari Road 25.75 22.65 The LUBANA CO-OP Labour Construction Society Ltd A/br/2017/134/EEA 07/12/2017 3 25.00 0.00 0.00 22.65
134 A A2 37 ongoing other nw br Laying 20mm thick premix surfacing on Gupta Road in ward no.37., Laying 20mm thick premix surfacing on Benjman Road in ward no.37. (New w.no.62) Others Gupta Road in ward no.37., Laying 20mm thick premix surfacing on Benjman Road in ward no.37. (New w.no.62) 20.95 18.43 NKC Constructions Private Limited A/br/2019/30 22/02/2019 2 0.00 0.00 0.00 18.43
135 A A2 37 ongoing cq nw br Laying RMC M-20 in streets of Khud Mohalla Near Masjid in ward no.62. RMC4 Streets of Khud Mohalla Near Masjid in ward no.62. 10.42 7.78 The Lubana Co-op L and C Society Ltd. A/br/2019/39 08/03/2019 1 0.00 0.00 0.00 7.78
136 A A2 38 ongoing cq nw br Laying I/T 60mm flooring in Mandir street & Kako Bhatia st.backside Sub Zone A-2 Taj Ganj ILT60 Mandir Street, Kako Bhatia Street B/s Subzone-A2 Taj Ganj 11.53 9.79 Dass Builders A/br/2013/83/38/2 09/12/2013 3 100.00 36.41 0.00 9.79
137 A A2 38 ongoing cq nw br Laying 6'' RMC from Gaushala Chowk to Shamshan Ghat Pulli ward no.38 RMC6 From Gaushala Chowk to Shamshan Ghat Pulley 39.50 33.97 M/s Dass Builders Pvt.Ltd . A/br/2013/81/38 05/12/2013 5 100.00 12.25 0.00 33.97
138 A A2 38 ongoing other nw br (i) Laying RMC M-20 in streets of Harbansh pura,Taj Ganj,Baba than singh nagar and Fateh ganj W-38.(37.99), (ii) Laying RMC M-20 in streets of Dokha Mohalla, Taj Ganj & Dharmpura w-38.(28.63).(PIDB Work Phase-I central) RMC4 (i) Harbansh pura,Taj Ganj,Baba than singh nagar and Fateh ganj (ii) Dokha Mohalla, Taj Ganj & Dharmpura 63.48 57.13 M/s Ashok Kumar Sobti A/br/2016/48 06/07/2016 3 90.00 0.00 0.00 57.13
139 A A2 38 ongoing other nw br Laying 60mm thick I/tiles in streets of Fateh Ganj in w.no.38. (PIDB work Phase-II Central) ILT60 Fateh Ganj in w.no.38. 29.76 27.23 Regis Contractor A/br/2016/56 18/07/2016 2 85.00 5.66 14.81 12.42
140 A A2 38 ongoing other mw br Repair & Maintenance work of ward no.38 of Sub Zone-A2. Others ward no.38 6.90 6.33 The Rajowal CO-OP Labour Construction Society Ltd. A/br/2017/135/EEA 07/12/2017 1 60.00 3.64 0.00 6.33
141 A A2 38 ongoing cq nw br Laying RMC M-20 in streets of Mohalla Harbanspura in ward no.38. (Est. Revised Amt.25%: 17.71) RMC4 Mohalla Harbanspura 70.86 65.27 Ashok Kumar Sobti A/br/2016/84/EEA 08/12/2016 2 110.00 9.63 62.16 3.11
142 A A2 39 ongoing cq nw br Providing and Fixing Interlocking tiles/paver block 80mm thick in area of sub zone A2 (With maintenance of 5 years) in Ward No.39 (a) Laying 80 & 60 mm I/T flooring in street in Ambedkar Nagar ILT60 Streets of Ambedkar Nagar 58.84 50.86 S.k.Const. Co, A/br/2013/ 86 09/12/2013 4 100.00 53.47 0.00 50.86
143 A A2 39 ongoing cq nw br Laying RMC M20 in Street of mohalla field Ganj, kucha No-13 to 16 and links between St No-8 to Mittar Sabha Jang Ghar ( ward No-39). R-RMC field Ganj, kucha No-13 to 16 and links between St No-8 to Mittar Sabha Jang Ghar 66.83 57.46 Neeraj Const.Co A/br/2015/178 24/09/2015 5 100.00 55.24 0.00 57.46
144 A A2 39 ongoing other nw br Laying 30mm Thick SDBC from Girja Ghar chowk to Issa Nagri Pulli And Sadhu Sundar Singh colony road W-39. (PIDB work Phase-I Central) SDBC from Girja Ghar chowk to Issa Nagri Pulli And Sadhu Sundar Singh colony road W-39 17.28 16.50 Sunil Kumar Contractor A/br/2016/216 03/05/2016 2 80.00 8.88 6.72 9.78
145 A A2 39 ongoing other nw br (i) Providing/ Laying 60mm thick interlocking Tiles in Street of Ahatta Mohammed Tair street. (26.54) (ii) Laying 60mm thick I/tiles in streets near C.M.C Gate no.3 & Issa Nagri Church in w.no.39. (35.26) (PIDB Work Phase-II Central) ILT60 (i) Ahatta Mohammed Tair street. (ii) near C.M.C Gate no.3 & Issa Nagri Church in w.no.39. 61.80 56.85 Apex Devlopers A/br/2016/30 03/06/2016 2 100.00 5.42 41.01 15.84
146 A A2 39 ongoing gq nw br Laying RMC M-20 in St No-1, Khud Mohalla in ward No-39. RMC4 St No-1, Khud Mohalla 2.30 1.97 The Suraj CO-OP Labour Construction Society Ltd. A/br/2017/136/EEA 07/12/2017 1 100.00 1.16 0.00 1.97
147 A A2 39 ongoing other nw br Laying RMC M20 in Street of Mohalla Issa Nagri St No-3 & links in Ward No-39 RMC4 Mohalla Issa Nagri St No-3 & links 20.79 18.27 The LUBANA CO-OP Labour Construction Society Ltd. A/br/2017/124/EEA 07/12/2017 2 85.00 13.73 0.00 18.27
148 A A2 39 ongoing gq nw br Special repair estimate for the work of Children Park on the site of Old Jail back side Civil Hospital in ward no.39. Parks Children Park on the site of Old Jail back side Civil Hospital 11.71 10.75 The Rajowal CO-OP Labour Construction Society Ltd. A/br/2017/126/EEA 07/12/2017 2 25.00 0.00 0.00 10.75
149 A A2 39 ongoing gq nw br Laying RMC M-20 in various streets of Mohalla Issa Nagri in ward no.39. RMC4 Mohalla Issa Nagri in ward no.39. 46.69 31.90 ASHOK KUMAR SOBTI A/br/2017/144/EEA 29/12/2017 4 100.00 3.04 29.51 2.39
150 A A2 39 ongoing cq mw br P/F speed Breaker in area of Ward No-39. Others P/F speed Breaker in area of Ward No-39. 4.52 3.16 The Rajowal Co-op Labour & Construction Society Ltd. A/br/2018/171 30/01/2018 2 0.00 0.00 0.00 3.16
151 A A2 39 ongoing other nw br Laying RMC M-20 in streets of Mohalla Ram Nagar in ward no.39. RMC4 Mohalla Ram Nagar in ward no.39. 52.77 38.49 Ashok Kumar Sobti A/br/2017/131 07/12/2017 3 95.00 23.13 32.63 5.86
152 A A2 39 ongoing cq nw br Laying 30mm thick SDBC on Hargobind Marg Road in ward no.54. SDBC Hargobind Marg Road in ward no.54. 63.73 55.54 Anil Kumar & Sons A/br/2019/38 08/03/2019 2 0.00 0.00 0.00 55.54
153 A A3 1 ongoing cq nw br Laying I/T in streets of Geeta Colony. ILT80 Streets of Geeta Colony 42.46 36.44 Apex Developers A/br/2013/89/1/1 09/12/2013 5 100.00 36.44 0.00 36.44
154 A A3 1 ongoing cq nw br Laying I/T in streets of Bazigarh Dera (R.H.S). ILT80 Streets of Bazigar Dera R.H.S 25.06 21.51 Apex Developers A/br/2013/89/1/2 09/12/2013 5 100.00 20.40 0.00 21.51
155 A A3 1 ongoing cq nw br Development of Streets in Bazigar Dera L.H.S RMC4 Sts. of Bazigar Dera LHS 44.98 38.93 M/s Kabir Infra Pvt.Ltd. A/br/2013/85 05/12/2013 4 100.00 34.60 0.00 38.93
156 A A3 1 ongoing mlaq nw br Construction of Mettaled Road in Streets of Mohalla Dhanraj Nagar BMPC Dhanraj Nagar 45.32 34.07 Dass Builders Pvt.Ltd. A/br/2014/125 04/03/2014 4 100.00 0.00 0.00 34.07
157 A A3 1 ongoing mplad nw br Shamshan Ghat Village Bhaura. Buildings 4.00 3.96 M/s Grover Enterprises A/br/2014/117 11/02/2014 3 0.00 0.00 0.00 3.96
158 A A3 1 ongoing cq nw br Dev. of Gurdwara Road in Aman Nagar BMPC Gurudwara road Aman Nagar 11.30 9.55 M/s Shiva Constructions A/br/2014/107 27/01/2014 6 100.00 9.10 0.00 9.55
159 A A3 1 ongoing mlaq nw br Providing & Fixing of 60mm thick Interlocking Tiles in Mohalla Golden Vihar.(25% Revised Work) ILT60 Mohalla Golden Vihar 51.40 43.62 M/S Gupta Contractors Pvt. Ltd. A/br/2015/194 01/12/2015 4 100.00 43.60 0.00 43.62
160 A A3 1 ongoing mlaq nw br Rejuvenation of Main Bahadurke Road. Others Main Bahadurke Road. 134.61 105.22 M/s J.K Infocon Pvt. Ltd. A/br/2015/175 24/09/2015 3 100.00 0.00 0.00 105.22
161 A A3 1 ongoing other nw br (i) Construction of Mettaled road in streets of Mohalla Beant Vihar.(12.16) (ii) Construction of Mettaled road in streets of Mohalla Jain Colony.(13.18) (iii) Construction of Mettaled road in streets of Mohalla Basant Vihar Ext.(Part-II) (19.48) (iv) Construction of Mettaled road in streets of Mohalla Anand Puri.(20.96) (PIDB Works of Phase-I East) BMPC (i) Mohalla Beant Vihar (ii) Mohalla Jain Colony (iii) Mohalla Basant Vihar Ext. Part-II (iv) Mohalla Anand Puri) 64.47 61.57 M/s Gupta Contractor Pvt. Ltd. A/br/2016/215 03/05/2016 3 90.00 8.60 21.58 39.99
162 A A3 1 ongoing other nw br (i) Construction of metalled road in streets of Mohalla Bharti Colony.(9.17) (ii) Construction of metalled road in streets of Mohalla Varinder Nagar Village Baura.(17.61) (PIDB Works of Phase-I North) BMPC (i) Mohalla Bharti Colony (ii) Mohalla Varinder Nagar Village Boura. 26.72 25.52 M/s Gupta Contractor Pvt. Ltd. A/br/2008/227 01/01/2008 2 90.00 2.72 12.25 13.27
163 A A3 1 ongoing other nw br Construction of metalled road from Bahadur ke road to Main GT road via Bharti Colony & Akash Nagar (PIDB Works of Phase-I North) BMPC Main GT road via Bharti Colony & Akash Nagar. 51.89 49.55 S.S Singla A/br/2016/228 03/05/2016 3 90.00 39.99 22.28 27.27
164 A A3 1 ongoing other nw br Earth filling in streets of Mohalla Sanyas Nagar, Harwinder Nagar, New Harwinder Nagar and Deep Nagar.(PIDB Work of Phase-II East) Others Mohalla Sanyas Nagar, Harwinder Nagar, New Harwinder Nagar and Deep Nagar. 66.03 57.07 Apex Developers A/br/2016/62 10/08/2016 3 70.00 19.77 17.40 39.67
165 A A3 1 ongoing other nw br P/Laying 60mm thick interlocking tiles in streets of Village Boura in w.no.1. (PIDB Work of Phase-II North) ILT60 Village Boura 22.58 20.57 The Sutlej Co-op L/C Society A/br/2016/47 06/07/2016 2 80.00 8.91 0.00 20.57
166 A A3 1 ongoing other nw br Construction of Mettaled Roads in Various streets of ward no.1 (Part-2). (i) Construction of Mettaled Road in Streets of Mohalla Sanyas Nagar (72.16) (ii) Construction of Mettaled Road in Streets of Mohalla Deep Vihar (85.21) (PIDB Work of Phase-II North) BMPC (i) Mohalla Sanyas Nagar (ii) Mohalla Deep Vihar 157.37 149.50 M/s J.K Infocon Pvt. Ltd. A/br/2018/162 10/01/2018 5 50.00 48.94 0.00 149.5
167 A A3 1 ongoing other nw br Providing & Fixing 60mm thick Interlocking Tiles in Streets of Mohalla Royal Estate (Part-II) (PIDB Work of Phse-III) ILT60 Mohalla Royal Estate (Part-II) 73.48 62.19 Sham Sunder Singla A/br/2016/74 24/09/2016 2 64.00 34.82 5.29 56.9
168 A A3 1 ongoing other nw br Construction of Mettaled Roads in Various streets of ward no.1 (Part-1). (i) Construction of Mettaled Road in Streets of Mohalla Harwinder Nagar (10.87) (ii) Construction of Mettaled Road in Streets of Mohalla New Harwinder Nagar (39.09) (iii) Construction of Mettaled Road in Streets of Mohalla Khazoor Colony (20.51) (iv) Construction of Mettaled Road in Streets of Mohalla Veer Nagar Manu Medical Store (12.07) (v) Construction of Mettaled road in streets of Mohalla Gurbaksh Nagar (15.27) (vi) Construction of Mettaled road in streets of Mohalla Chander Nagar Village Boura main road (15.27) (vii) Construction of Mettaled road in streets of Mohalla Royal City (30.56) (PIDB Work of Phase-II North) BMPC (i) Mohalla Harwinder Nagar (ii) Mohalla New Harwinder nagar (iii) Mohalla Khazoor Colony (iv) Veer Nagar Manu Medical Store (v) Mohalla Gurbaksh Nagar (vi) Chander Nagar Village Boura Main Road (vii) Mohalla Royal City. 152.62 145.75 M/s Gupta Contractor Pvt. Ltd. A/br/2016/11 27/05/2016 0 50.00 58.32 25.82 119.93
169 A A3 1 ongoing other nw br Providing & Fixing 60mm thick Interlocking Tiles in Streets of Mohalla New Nanda Colony (PIDB Work of Phase-III East) ILT60 Mohalla New Nanda Colony 65.00 55.17 Sham Sunder Singla A/br/2016/75 29/09/2016 2 70.00 16.89 22.17 33
170 A A3 1 ongoing other nw br (i) Providing & Fixing 80mm thick Interlocking tiles in Streets of Mohalla Harpreet Nagar in Ward No.2. (Est. cost:38.24) (ii) Providing & Fixing 60mm thick Interlocking Tiles in Mohalla Gagandeep Colony St. No.2 Near PSEB Office on Kakowal Road in Ward No.3. (5.99) (iii) Providing & Fixing 60mm thick Interlocking tiles in Mohalla Janta Colony (Part-III) (Est. cost:8.94 )PIDB Work of Phase-III East) ILT60 (i) Mohalla Harpreet Nagar (ii) Mohalla Gagandeep Colony St. No.2 Near PSEB Office on Kakowal Road (iii) Mohalla Janta Colony (Part-III) 53.16 43.48 M/s Gupta Engineers & Builders A/br/2016/76 07/10/2016 2 66.00 17.46 11.38 32.1
171 A A3 1 ongoing other nw br Laying RMC M-20 in streets of Mohalla Chander Nagar in ward no.1. RMC4 Mohalla Chander Nagar in ward no.1. 70.02 53.84 LRY Labour Contractor A/br/2017/98 03/04/2017 3 70.00 39.95 0.00 53.84
172 A A3 1 ongoing cq nw br P/F 60mm thick I/tiles in Mohalla Ekjot Nagar w.no.1 and P/F 60mm thick I/tiles in Mohalla Sartaj Nagar st.no.1 in w.no.4. ILT60 P/F 60mm thick I/tiles in Mohalla Ekjot Nagar w.no.1 and P/F 60mm thick I/tiles in Mohalla Sartaj Nagar st.no.1 in w.no.4. 64.00 53.27 Ashok Kumar Sobti A/br/2017/118 08/08/2017 2 100.00 8.60 37.56 15.71
173 A A3 1 ongoing cq nw br P/F 60mm thick interlocking tiles in streets of Mahalla Banda Bahadur Nagar in w.no.1. ILT60 P/F 60mm thick interlocking tiles in streets of Mahalla Banda Bahadur Nagar in w.no.1. 71.81 59.91 Apex Developer A/br/2017/120 08/08/2017 3 90.00 78.90 24.92 34.99
174 A A3 1 ongoing cq nw br Laying RMC M-20 in streets of Mohalla Varinder Nagar Part-II P/fixing 60mm thick I/tiles in streets of Mohalla Bharti Colony st.no.1,5,6 & 7 & streets of New Veer Hosiery in ward no.1. Others Laying RMC M-20 in streets of Mohalla Varinder Nagar Part-II P/fixing 60mm thick I/tiles in streets of Mohalla Bharti Colony st.no.1,5,6 & 7 & streets of New Veer Hosiery in ward no.1. 69.40 55.45 "L RY Labour Contractor" A/br/2017/119 08/08/2017 3 90.00 64.02 27.92 27.53
175 A A3 1 ongoing other nw br P/fixing 80mm thick I/tiles in streets of Mohalla Village Bhaura Part-II in ward no.1. ILT80 Mohalla Village Bhaura Part-II in ward no.1. 70.15 52.17 Varinder Singh A/br/2018/186 24/04/2018 3 0.00 0.00 0.00 52.17
176 A A3 1 ongoing other nw br Laying RMC M-20 in streets of Mohalla Akash Nagar, Jalandhar Bye Pass in ward no.1 and Constructions of Park in Mohalla Basant Vihar in M Block, Panchsheel Colony in ward no.2. RMC4 Mohalla Akash Nagar, Jalandhar Bye Pass in ward no.1 and Park in Mohalla Basant Vihar in M Block, Panchsheel Colony in ward no.2 53.56 39.07 Ashok Kumar Sobti A/br/2018/182 24/04/2018 3 0.00 0.00 0.00 39.07
177 A A3 1 ongoing other nw br P/fixing 80mm thick I/tiles in streets of Mohalla Veer Nagar in ward no.1. ILT80 Mohalla Veer Nagar in ward no.1. 52.05 35.91 Swardha Builders A/br/2018/181 24/04/2018 3 0.00 0.00 0.00 35.91
178 A A3 1 ongoing other nw br Providing and fixing 80mm thick Itiles in streets of Mohalla Sanyas Nagar (Part-II) in ward no.1. ILT80 Mohalla Sanyas Nagar (Part-II) in ward no.1. 93.64 66.39 NKC Constructions Private Limited A/br/2018/178 24/04/2018 3 100.00 48.86 0.00 66.39
179 A A3 1 ongoing other nw br Construction of BMPC Road from Phambran Road to Noorwala Road in ward no.1 & 2. BMPC Phambran Road to Noorwala Road in ward no.1 & 2. 25.87 25.21 Apex Builders A/br/2018/5 03/05/2018 3 0.00 0.00 0.00 25.21
180 A A3 1 ongoing other nw br P/fixing 80mm thick I/tiles in streets of Mohalla Khazoor Colony & P/fixing 80mm thick I/tiles in streets of Mohalla New Veer Nagar in ward no.1. ILT80 Mohalla Khazoor Colony & Mohalla New Veer Nagar in ward no.1. 82.92 59.27 M/s Apex Developers A/br/2018/18 25/07/2018 3 0.00 0.00 0.00 59.27
181 A A3 1 ongoing other nw br Construction of BM/PC Road at Metro Road in ward no.1. BMPC Metro Road 25.11 23.85 Shiva Construction A/br/2019/27 20/02/2019 3 0.00 0.00 0.00 23.85
182 A A3 1 ongoing cq nw br P/fixing 80mm thick I/tiles in Mohalla Aman Nagar in ward no.1. ILT80 Mohalla Aman Nagar in ward no.1. 49.37 33.80 Teg Builders (Govt. Contractor) A/br/2019/51/EEA 08/03/2019 3 100.00 10.16 17.40 16.4
183 A A3 2 ongoing cq mw br Conts of streets in Anand Puri by laying I/T w.no.2 (E/cost Rs.of 5.95 lacs). ILT60 Anand Puri 5.95 5.16 M/s Kabir Infra Pvt.Ltd. A/br/2013/85 09/12/2013 1 100.00 5.20 0.00 5.16
184 A A3 2 ongoing cq nw br Providing & Laying RMC in remaining Streets of Mohalla Basant Vihar 'S' Block RMC4 Mohalla Basant Vihar 'S' Block 20.00 17.77 M/S Jagdambey Coop L/C Society A/br/2014/123 04/03/2014 2 100.00 18.50 0.00 17.77
185 A A3 2 ongoing mlaq nw br Construction of Mettaled Road In Mohalla Prem Vihar BMPC Prem Vihar 82.30 64.83 Dass Builders Private Limited A/br/2014/124 04/03/2014 6 100.00 0.00 0.00 64.83
186 A A3 2 ongoing cq nw br Const. of Roads in Streets of Mohalla Inder Vihar (Ward no.2) Undeclare Area BMPC Mohalla Inder Vihar 49.03 41.57 M/s Shiva Constructions A/br/2014/110 10/02/2014 3 100.00 34.45 0.00 41.57
187 A A3 2 ongoing cq nw br Const. of Roads In Streets of Mohalla Bank Colony Ward No.2. BMPC Mohalla Bank Colony 75.34 63.67 M/s Shiva Constructions A/br/2014/120 18/02/2014 4 100.00 9.30 44.14 19.53
188 A A3 2 ongoing cq mw br Laying BM&PC in Mohalla Sartaj Nagar BMPC Sartaj Nagar 16.59 14.02 M/s Shiva Constructions A/br/2014/107 27/01/2014 6 100.00 15.60 0.00 14.02
189 A A3 2 ongoing gq nw br Rejuvenation of Main Kakowal Road SDBC Main Kakowal Road 217.27 168.93 M/s S S Singla A/br/2015/170 21/09/2015 4 100.00 76.78 76.99 91.94
190 A A3 2 ongoing gq nw br Rejuvenation of Main Noorwala Road. SDBC Main Noorwala Road. 159.90 119.76 M/s J.K Infocon Pvt. Ltd. A/br/2015/173 23/09/2015 3 100.00 0.00 0.00 119.76
191 A A3 2 ongoing mlaq nw br Rejuvenation of Road From Phamran Road upto Bapu Inder Road (Grewal Road.) Others Phamran Road upto Bapu Inder Road (Grewal Road.) 46.46 37.31 M/s J.K Infocon A/br/2015/171 23/09/2015 3 100.00 0.00 0.00 37.31
192 A A3 2 ongoing mlaq nw br Construction of Phamran road from Grewal kothi to Noorwala Road via. Govt. High School in Ward No.1 & 2. BMPC Phamran road from Grewal kothi to Noorwala Road via. Govt. High School in Ward No.1 & 2. 51.90 40.57 M/s J.K Infocon Pvt. Ltd. A/br/2015/175 24/09/2015 3 100.00 0.00 0.00 40.57
193 A A3 2 ongoing other nw br (i) Construction of Mettaled Road in Streets of Mohalla Lajpat Nagar.(30.09), (ii) Construction of Mettaled Road in Streets of Mohalla Sain Bhagat Colony.(6.71), (iii) Construction of Mettaled Road in Streets of Mohalla Azad Nagar to Anand Vihar (Kali Road).(41.18) (PIDB Works of Phase-I East) BMPC (i) Mohalla Lajpat Nagar, (ii) Mohalla Sain Bhagat Colony, (iii) Azad Nagar to Anand Vihar (Kali Road). 77.98 74.47 Kabir Infra Pvt. Ltd. A/br/2016/211 03/05/2016 3 43.00 13.67 18.32 56.15
194 A A3 2 ongoing other nw br Providing & Laying 60mm Thick Interlocking Tiles in Mohalla Guru Gobind Singh nagar. (PIDB Works of Phase-I East) ILT60 Mohalla Guru Gobind Singh Nagar. 36.00 34.56 The Khairay Co-op L&C Society Ltd. A/br/2016/233 10/05/2016 3 100.00 0.21 28.92 5.64
195 A A3 2 ongoing other nw br (i) Construction of Mettaled Road in Streets of Mohalla Grewal Colony & Links of Streets of Preet Vihar. (15.72), (ii) Construction of Mettaled Road in Streets of Mohalla Grewal Colony & Links of Streets of Preet Vihar. (15.72) (iii) Construction of Mettaled Road in Noorwala Road From Basant Vihar to Main kakowal Road.(9.00) (iv) Construction of Mettaled Road in Streets of Main kali Road.(15.80) (PIDB Works of Phase-I East) BMPC (i) Mohalla Grewal Colony & Links of Streets of Preet Vihar (ii) Mohalla Lajpat Nagar (Part-II) (iii) Noorwala Road from Basant Vihar to Main Kakowal Road (iv) Main kali Road) 51.39 49.08 Apex Builders A/br/2016/212 03/05/2016 3 90.00 11.40 26.88 22.2
196 A A3 2 ongoing other nw br (i)Construction of metalled road in streets of Mohalla New Anandpuri.(25.23) (ii)Construction of metalled road in streets of Mohalla Basant Vihar Extension.(24.08) (PIDB Works of Phase-I East) BMPC (i) Mohalla New Anand Puri (ii) Mohalla Basant Vihar Ext. 49.29 47.07 S.K Construction Co. A/br/2016/222 03/05/2016 3 95.00 0.00 0.00 47.07
197 A A3 2 ongoing other nw br Construction of metalled road in streets of Mohalla Anandpuri (Part - II) (PIDB Works of Phase-I East) BMPC Mohallla Anandpuri (Part - II) 38.16 36.44 M/s Gupta Contractor Pvt. Ltd. A/br/2016/214 03/05/2016 2 95.00 0.00 0.00 36.44
198 A A3 2 ongoing other nw br Construction of metalled road in streets of Mohalla New Basant Vihar. (PIDB Works of Phase-I East) BMPC Mohalla New Basant Vihar. 49.98 47.73 Kabir Infra Pvt. Ltd. A/br/2016/221 03/05/2016 3 75.00 0.00 0.00 47.73
199 A A3 2 ongoing other nw br Construction of metalled road in streets of Mohalla Grewal Estate. (PIDB Works of Phase-I East) BMPC Mohalla Grewal Estate. 45.04 43.01 Bansal Construction Co. A/br/2016/223 03/05/2016 3 82.00 11.40 18.88 24.13
200 A A3 2 ongoing other nw br (i)P/ Fixing 80mm thick interlocking tiles in Mohalla Partap Nagar.(21.30), (ii) P/l 60 mm thick i/tiles in mohalla new Heera Nagar.(33.00) (PIDB Works of Phase-I East) Others (i) Mohallla Partap Nagar (ii) Mohalla New Heera Nagar. 53.59 48.64 Friends & Co. A/br/2016/20 03/06/2016 3 55.00 0.00 0.00 48.64
201 A A3 2 ongoing other nw br (i) Const. of mettaled in sts of mohalla sant singh cheema nagar(26.68) (ii) Const. of mattaled road in sts of mohalla deep nagar.(9.84) (iii) Const. mettalled road in sts. of mohalla Anand Vihar.(41.67) (PIDB Works of Phase-I East) BMPC (i) Mohalla Sant Singh Cheema Nagar (ii) Mohalla Deep Nagar (iii) Mohalla Anand Vihar 78.00 74.49 Shiva Constructions. A/br/2016/224 03/05/2016 4 70.00 0.00 0.00 74.49
202 A A3 2 ongoing other nw br Construction of metalled road in various streets of ward no. 2 (Part - I) (i) Construction of Mettaled Road in Streets of Mohalla Basant Vihar Dairya in Ward No.2. (16.46.) (ii) Construction of Mettaled Road in Streets of Mohalla Basant Vihar L Block in Ward No.2. (7.18) (iii) Construction of Mettaled Road in Streets of Mohalla Basant Vihar M Block in Ward No.2. (18.92) (iv) Construction of Mettaled Road in Streets of Mohalla Basant Vihar S Block in Ward No.2. (23.02) Construction of Mettaled Road of Main Azad Nagar Road (10.77) (vi) Construction of Mettaled Road in Streets of Mohalla Heera Nagar in Ward No.2.(26.07) (vii) Construction of Mettaled Road in Streets of Mohalla Panchsheel Colony in Ward No.2. (15.65) (PIDB Works of Phase-II East) BMPC (i) Mohalla Basant Vihar Dairya (ii) Mohalla Basant Vihar 'L' Block (iii) Mohalla Basant Vihar 'M' Block (iv) Mohalla Basant Vihar 'S' Block (v) Main Azad Nagar Road (vi) Mohalla Heera Nagar (vii) Mohalla Panchsheel Colony. 118.07 112.75 Kabir Infra Pvt. Ltd. A/br/2016/09 27/05/2016 4 50.00 8.92 32.51 80.24
203 A A3 2 ongoing other nw br Construction of metalled road in various streets of ward no. 2 (Part - II) (i) Construction of Mettaled Road in Main Road of Raghunath Mandir & Parminder Chakki & Links of Mohalla Basant Vihar P Block in Ward No.2. (22.78) (ii) Construction of Mettaled Road of Main New Azad Nagar 30' Road. (49.68) (iii) Construction of Mettaled Road in Kakowal Road from Mohalla Sant Cheema Nagar to Noorwala Road. (7.83) (iv) Construction of BM/PC Road in Streets of Mohalla Sain Bhagat Colony (Part-II). (48.64) (PIDB Works of Phase-II East) BMPC (i) Main Road of Raghunath Mandir & Parminder Chakki & Links of Mohalla Basant Vihar P Block (ii) Main New Azad Nagar 30' Road. (iii) Kakowal Road from Mohalla Sant Cheema Nagar to Noorwala Road (iv) Mohalla Sain Bhagat Colony (Part-II). 128.93 123.10 Kabir Infra Pvt. Ltd. A/br/2016/08 27/05/2016 4 60.00 22.89 35.18 87.92
204 A A3 2 ongoing other nw br Providing & Fixing 60 & 80mm thick Interlocking tiles in Mohalla Azad Nagar & New Azad Nagar St. No. 9&10 & Links (PIDB Work of Phase-III East) ILT80 Mohalla Azad Nagar & New Azad Nagar St. No. 9&10 & Links 59.00 50.34 Friends & Co. A/br/2016/72 29/09/2016 2 42.00 20.78 0.00 50.34
205 A A3 2 ongoing other nw br P/F 80mm thick I/tiles in Mohalla Gurpreet Nagar in ward no.2. ILT80 Mohalla Gurpreet Nagar in ward no.2. 100.90 80.51 Gupta Contractor Pvt. Ltd. A/br/2017/100 03/04/2017 3 100.00 6.38 70.73 9.78
206 A A3 2 ongoing cq nw br P/F 80mm thick I/tiles in Mohalla New Azad Nagar in w.no.2. ILT80 P/F 80mm thick I/tiles in Mohalla New Azad Nagar in w.no.2. 78.85 62.91 Gupta Cont. Pvt. Ltd. A/br/2017/121 08/08/2017 3 0.00 0.00 0.00 62.91
207 A A3 2 ongoing other nw br P/F 80mm thick I/tiles in Mohalla Azad Nagar in w.no.2. ILT80 Mohalla Azad Nagar in w.no.2. 97.37 78.38 Kulbhushan Sharma A/br/2017/122 08/08/2017 3 100.00 26.68 42.02 36.36
208 A A3 2 ongoing other nw br P/fixing 60mm thick I/tiles in streets of Mohalla Dhanraj Nagar in ward no. 1, P/fixing 80mm thick I/tiles in Mohalla Basant Vihar M-Block in ward no. 2 and P/Fixing 60mm thick I/tiles in streets of Mohalla Nehru Vihar in ward no. 2. Others Mohalla Dhanraj Nagar in ward no.1,Mohalla Basant Vihar M-Block in ward no. 2 and Mohalla Nehru Vihar in ward no. 2. 63.62 52.09 M/s Navyug Company A/br/2017/156 29/12/2017 2 85.00 24.01 15.64 36.45
209 A A3 2 ongoing other nw br P/fixing 60mm thick I/tiles in Mohalla Harpreet Nagar Part-II in ward no.2. ILT60 Mohalla Harpreet Nagar Part-II in ward no.2 64.77 54.24 M/s N.K.C Pvt. Ltd. A/br/2008/160 01/01/2008 3 0.00 0.00 0.00 54.24
210 A A3 2 ongoing other nw br P/fixing 60mm thick interlocking tiles pending street of ward no.2. ILT60 Pending street of ward no.2. 50.10 35.84 Dynamic Tiles A/br/2017/159 29/12/2017 3 100.00 3.77 32.54 3.3
211 A A3 2 ongoing other nw br P/fixing 80mm thick I/tiles in streets of Mohalla Vardhman Nagar in w.no.4 & Maintenance of Park in Mohalla Basant Vihar Block (P,S,N) Mohalla Block S near S-33 (Mini), Shri Raghunath Mandir Panchsheel Colony, Mohalla Anandpuri, Mohalla Lajpat Nagar in ward no.2. Others Mohalla Vardhman Nagar in w.no.4 and Mohalla Basant Vihar Block (P,S,N) Mohalla Block S near S-33 (Mini), Shri Raghunath Mandir Panchsheel Colony, Mohalla Anandpuri, Mohalla Lajpat Nagar in ward no.2. 58.57 40.09 Sham Sunder Singla A/br/2018/180 24/04/2018 3 0.00 0.00 0.00 40.09
212 A A3 2 ongoing other nw br P/fixing 60mm thick I/tiles in streets of Mohalla Velly Colony & Ashok Nagar and Construction of Park in Mohalla Basant Vihar ‘M’ Block, Panchseel Colony. ILT60 Mohalla Basant Vihar ‘M’ Block, Panchseel Colony. 58.21 40.67 Regis Contractor A/br/2018/12 14/06/2018 3 75.00 17.75 8.03 32.64
213 A A3 2 ongoing other nw br Providing & fixing 80mm thick interlocking tiles in streets of Mohalla Partap Nagar Part-II in ward no.2. ILT80 Mohalla Partap Nagar Part-II in ward no.2. 83.93 59.85 M/s Sham Sunder Singla A/br/2017/147 29/12/2017 3 70.00 31.55 0.00 59.85
214 A A3 2 ongoing other nw br P/fixing 60mm thick interlocking tiles in streets of Mohalla New Harwinder Nagar in new ward no.2. ILT60 New Harwinder Nagar 50.40 35.28 Capital Construction Company A/br/2019/21 07/01/2019 6 100.00 9.38 24.18 11.1
215 A A3 2 ongoing other nw br P/fixing 60mm thick I/tiles in streets of Mohalla New Harwinder Nagar (Part-II) in new ward no.2. ILT60 New Harwinder Nagar (Part-II) 76.30 54.24 Regis Contractors A/br/2019/23 07/01/2019 3 0.00 0.00 0.00 54.24
216 A A3 26 ongoing cq nw br Construction of Roads in Streets of Mohalla Swati Nagar in ward no.26. BMPC Mohalla Swati Nagar. 37.76 32.67 M/s Shiva Constructions A/br/2014/109 10/02/2014 3 100.00 4.47 23.11 9.56
217 A A3 26 ongoing cq nw br Construction of Roads in Streets of Mohalla Prem Nagar in ward no.26. BMPC Prem Nagar. 42.39 36.61 M/s Shiva Constructions A/br/2014/111 10/02/2014 3 100.00 6.29 24.44 12.17
218 A A3 26 ongoing gq mw br Construction of Jassian Road from Bapu Jwala Singh Chowk to Bhagat Tarsem Lal Hospital (25% Revised Work) BMPC Jassian Road 42.97 29.99 Sunil Kumar Contractor A/br/2014/106 27/01/2014 3 100.00 41.60 0.00 29.99
219 A A3 26 ongoing gq nw br Laying 4" thick RMC M-20 in streets of Mohalla Manoj Colony in ward no.26 (With maintenance of five years). BMPC Mohalla Manoj Colony 39.36 30.07 M/s Subodh Battish A/br/2015/155 31/08/2015 4 95.00 7.66 24.14 5.93
220 A A3 26 ongoing other nw br i) Construction of mettaled road in street of mohalla karol bagh (ii) Construction of BM & PC road in street of mohalla Gurnam nagar & Friends Colony. (PIDB Works of Phase-I North) BMPC (i) Mohalla Karol Bagh (ii) Mohalla Gurnam Nagar & Friends Colony. 63.68 60.81 Apex Builders A/br/2016/229 03/05/2016 3 95.00 58.01 44.60 16.21
221 A A3 26 ongoing other nw br Construction of Mettaled Road in Streets of Mohalla Jagat Nagar (PIDB Works of Phase-I North) BMPC Mohalla Jagat Nagar. 13.97 13.34 Shiva Constructions. A/br/2016/232 03/05/2016 2 0.00 0.00 0.00 13.34
222 A A3 26 ongoing other nw br Const. of road from Jassian Road to Mohalla Kehar Singh Nagar near Tarsem Hospital (PIDB Works of Phase-I North) BMPC Jassian Road to Mohalla Kehar Singh Nagar near Tarsem Hospital. 66.34 63.35 C.H Builders Pvt. Ltd. A/br/2016/231 03/05/2016 3 55.00 24.88 0.00 63.35
223 A A3 26 ongoing other nw br Construction of metalled road from Railway Line Jassian Road Upto Tarsem Hospital. (PIDB Works of Phase-I North) BMPC Railway Line Jassian Road Upto Tarsem Hospital. 69.35 66.23 Dass Builders Pvt. Ltd. A/br/2016/230 03/05/2016 3 90.00 0.00 0.00 66.23
224 A A3 26 ongoing other nw br Laying RMC in different streets of ward no. 26 (i) Laying RMC in Streets of Mohalla Manoj Colony & Swati Nagar. (33.53) (ii) Laying RMC M-20 in streets of Mohalla Ashok Nagar 'B'. (34.83) (iii) Laying RMC M-20 in streets of Mohalla Bapu Jawala Singh Nagar (50.09) (PIDB Work of Phase-II North) RMC4 (i) Mohalla Manoj Colony & Swati Nagar (ii) Mohalla Ashok Nagar 'B' (iii) Mohalla Bapu Jwala Singh Nagar. 127.45 114.70 S.K Construction Co. A/br/2016/25 03/06/2016 4 95.00 11.95 68.32 46.38
225 A A3 26 ongoing other nw br P/Laying 60mm thick I/tiles in street of Mohalla New Gurnam Nagar in ward no.26. ILT60 Mohalla New Gurnam Nagar. 66.73 58.34 M/s Gupta Contractor Pvt. Ltd. A/br/2016/70 08/09/2016 2 95.00 13.75 31.35 26.99
226 A A3 26 ongoing other nw br Construction of Roads by Laying BM/PC in area of Sub Zone-A3 ward no.26. BMPC In area of Sub Zone-A3 ward no.26. 38.28 32.36 M/s Shiva Construction A/br/2014/103 27/01/2014 4 100.00 4.85 22.34 10.02
227 A A3 26 ongoing other nw br P/fixing 60mm thick I/tiles in streets of Mohalla Tarsem Colony in ward no.26. ILT60 Mohalla Tarsem Colony 38.31 30.99 The Dhorour Co-op L&C Society Ltd. A/br/2017/139 07/12/2017 3 100.00 5.40 23.40 7.59
228 A A3 26 ongoing other nw br Construction of metalled road in various streets of Ward 26 BMPC Seeta Nagar, Ashok Nagar, Varyam Nagar and Karol Bagh 119.35 113.98 Apex Builders A/br/2016/242/EEA 27/05/2016 4 100.00 106.50 7.29 106.69
229 A A3 26 ongoing other nw br Construction of Room and Varandah of Shiv Dham Shamshan Ghat in ward no.26. Others Shiv Dham Shamshan Ghat in ward no.26. 5.00 4.84 Kohinoor Builders A/br/2017/142 22/12/2017 2 100.00 4.36 0.00 4.84
230 A A3 26 ongoing other nw br P/fixing 60mm thick I/tiles in streets of Mohalla Rajori Garden Part-I in ward no.26. (Name of Work Site Change: P/fixing 60mm thick I/tiles in street of Mohalla Kehar Singh Nagar w.no.26.) (New w.no.94) ILT60 Mohalla Rajori Garden Part-I in ward no.26. (Name of Work Site Change: Mohalla Kehar Singh Nagar w.no.26.) (New w.no.94) 48.32 32.74 M/s Apex Developers A/br/2017/149 29/12/2017 3 90.00 26.49 0.00 32.74
231 A A3 26 ongoing other nw br Const. of BM/PC road Jwala Singh Chowk to Lakshmi Nagar in ward no.26 and Const. of BM/PC Road Sharma Sweet Shop to Dosanjh Nagar in ward no.26. BMPC Jwala Singh Chowk to Lakshmi Nagar in ward no.26 and Sharma Sweet Shop to Dosanjh Nagar in ward no.26. 78.65 74.71 Dass Builders Pvt. Ltd. A/br/2017/152 29/12/2017 3 0.00 0.00 0.00 74.71
232 A A3 26 ongoing other nw br P/fixing 80mm thick I/tiles in streets of Mohalla Kehar Singh Nagar Part-I in ward no. 26 and P/fixing 80mm thick I/tiles in streets of Mohalla Kehar Singh Nagar (Part-II) in ward no.26. (New w.no.94) ILT80 Mohalla Kehar Singh Nagar Part-I in ward no. 26 and Mohalla Kehar Singh Nagar (Part-II) in ward no.26. (New w.no.94) 71.25 48.94 M/s Apex Developers A/br/2017/158 29/12/2017 3 100.00 9.93 32.57 16.37
233 A A3 26 ongoing other nw br P/fixing 60mm thick interlocking tiles in streets of Mohalla New Silver City st.no.1,2,3 in ward no.26. ILT60 Mohalla New Silver City st.no.1,2,3 in ward no.26. 41.33 28.29 M/s Capital Construction Company A/br/2018/161 10/01/2018 3 100.00 4.97 19.78 8.51
234 A A3 26 ongoing other nw br P/fixing 60mm thick I/tiles in Mohalla Kunjh Vihar & Fanta Colony Part-V in ward no.26 & P/fixing 60mm thick I/tiles in Mohalla New Gurnam Nagar & Karol Bagh in ward no.26. (New w.no.95) ILT60 Mohalla Kunjh Vihar & Fanta Colony Part-V in ward no.26 & Mohalla New Gurnam Nagar & Karol Bagh in ward no.26. (New w.no.95) 72.84 50.34 Capital Construction Company A/br/2018/14 25/07/2018 3 50.00 23.28 0.00 50.34
235 A A3 26 ongoing other nw br Providing & Fixing 60mm thick Interlocking Tiles in Streets of Mohalla Ashok Nagar A (Part-I) in Ward No. 26 new w.no.95 and P/fixing 60mm thick I/tiles paver block in Service lane road, Peeru Banda road & links streets in ward no.25 new w.no.89. ILT60 Mohalla Ashok Nagar A (Part-I) in Ward No. 26 new w.no.95 & Service lane road, Peeru Banda road & links streets in ward no.25 new w.no.89. 48.08 33.51 M/s Garg Constructions A/br/2018/20 03/10/2018 3 0.00 0.00 0.00 33.51
236 A A3 26 ongoing other nw br Providing & Fixing 60mm thick Interlocking Tiles in Streets of Mohalla Seeta Nagar ,King Park & Pehalwan Colony Ward No: 94. Others Providing & Fixing 60mm thick Interlocking Tiles in Streets of Mohalla Seeta Nagar ,King Park & Pehalwan Colony Ward No: 94. 79.69 54.06 M/s Dynamic tiles A/br/2017/148 29/12/2017 3 65.00 7.30 20.57 33.49
237 A A3 26 ongoing other nw br Construction of BM/PC Road in Mohalla Ashok Nagar C (Part-II) St.No.1 to 5 and Links and Laying SDBC in Streets of Mohalla Ashok Nagar A (Part-II) in w.no.95. BMPC Mohalla Ashok Nagar A (Part-II) 67.07 57.00 NKC Constructions Private Limited A/br/2019/32 22/02/2019 3 0.00 0.00 0.00 57
238 A A3 26 ongoing cq nw br Laying RMC M-30 in Mohalla Bhagat Singh Nagar Part-II in ward no.95. R-RMC Mohalla Bhagat Singh Nagar Part-II 49.44 34.55 NKC Constructions Private Limited A/br/2019/43/EEA 08/03/2019 3 10.00 0.00 0.00 34.55
239 A A3 26 ongoing cq nw br Construction of BM/PC Main Road Bhagat Singh Nagar Part-3 in Ward No.95. BMPC Main Road Bhagat Singh Nagar Part-3 in Ward No.95. 29.73 21.40 Rajesh Kumar Sood A/br/2019/46/EEA 08/03/2019 3 10.00 0.00 0.00 21.4
240 A A3 26 ongoing cq nw br "Laying BM/PC in streets of Mohalla Laxmi Colony in Ward No.94. BMPC Mohalla Laxmi Colony in Ward No.94. 47.58 34.60 Rajesh Kumar Sood A/br/2019/47/EEA 08/03/2019 3 0.00 0.00 0.00 34.6
241 A A3 26 ongoing cq nw br P/fixing 60mm thick I/tiles in Mohalla Razori Garden Part-II in w.no.26 (New ward no.94).(side Change 60mm thick I/tiles to Kehar Singh Nagar RMC M-30) ILT60 Mohalla Razori Garden Part-II 44.96 31.73 Navyug Company A/br/2019/56/EEA 08/03/2019 3 0.00 0.00 0.00 31.73
242 A A3 26 ongoing cq nw br P/fixing 60mm thick I/tiles in Mohalla Sunil Nagar Part no. II in (new w.no.94). (side Change 60mm thick I/tiles to RMC M-30 ) Others Mohalla Sunil Nagar Part no. II 49.80 32.27 Capital Construction Co. A/br/2019/55/EEA 08/03/2019 3 10.00 0.00 0.00 32.27
243 A A3 26 ongoing cq nw br P/fixing 60mm thick I/tiles in Mohalla Sunil Nagar Part No.-3 in ward no.94 & P/fixing 60mm thick I/tiles in Mohalla New Gurnam Nagar Part -2 in ward no.-94 . ( Side change 60mm thick I/tiles to RMC M-30 ) ILT60 Mohalla Sunil Nagar Part No.-3,Mohalla New Gurnam Nagar Part -2 69.52 45.04 Capital Construction Co. A/br/2019/54/EEA 08/03/2019 3 10.00 0.00 0.00 45.04
244 A A3 26 ongoing cq nw br P/fixing 60mm thick I/tiles in Mohalla Sunil Nagar Part no. I in (new no.94) (side change 60mm thick I/tiles to RMC M-30) Others Mohalla Sunil Nagar Part no. I 48.11 31.17 Capital Construction Co. A/br/2019/53/EEA 08/03/2019 3 10.00 0.00 0.00 31.17
245 A A3 26 ongoing cq nw br P/F 60mm thick I/tiles in Mohalla New Partap Nagar in w.no.94 (side change 60mm thick I/tiles to RMC M-30) Others Mohalla New Partap Nagar 59.30 38.40 Capital Construction Co. A/br/2019/52/EEA 08/03/2019 3 10.00 0.00 0.00 38.4
246 A A3 3 ongoing cq nw br Const. of Mettaled Road in Royal Estate in ward no.3. BMPC Royal Estate 19.76 16.40 M/s Sunil Kumar A/br/2014/108 10/02/2014 2 100.00 18.40 0.00 16.4
247 A A3 3 ongoing cq nw br Laying BM & PC in st.no.16 & 17 of Mohalla New Gagandeep Colony (Undeclare Area) BMPC New Gagandeep Colony. 16.24 13.63 M/s Sunil Kumar A/br/2014/122 18/02/2014 2 100.00 13.40 0.00 13.63
248 A A3 3 ongoing cq nw br P/Laying RMC in Mohalla Gagandeep Colony in st.no.3 & 4. RMC4 Mohalla Gagandeep Colony. 25.50 15.48 M/s The Jagdambay Co-op L/C Society Ltd.Pvt. A/br/2015/144 22/04/2015 2 100.00 13.20 10.46 5.02
249 A A3 3 ongoing gq nw br Rejuvenation of Main Kailash Nagar Road in Ward No.3 & 4. SDBC Main Kailash Nagar Road 157.23 122.98 M/s S S Singla A/br/2015/169 21/09/2015 3 100.00 90.62 0.00 122.98
250 A A3 3 ongoing cq nw br Rejuvenation of Main Kakowal Road Ward No. 3 Others Rejuvenation of Main Kakowal Road Ward No. 3 217.27 168.93 SS Singla Govt. Cont. A/br/2015/170/EEA 21/10/2015 4 100.00 158.86 82.08 86.85
251 A A3 3 ongoing other nw br Construction of metalled road in street no. 6 of Mohalla Shimla Colony. (PIDB works of Phase-I East) BMPC Mohalla Shimla Colony St. No.6 21.25 20.29 M/s Gupta Contractor Pvt. Ltd. A/br/2016/213 03/05/2016 2 95.00 0.00 0.00 20.29
252 A A3 3 ongoing other nw br Const. of Kakowal road and Vishal Colony to main Kailash Nagar Road (PIDB Works of Phase-I East) BMPC Kakowal road and Vishal Colony to main Kailash Nagar Road. 73.11 69.82 M/s J.K Infocon Pvt. Ltd. A/br/2016/220 03/05/2016 3 75.00 26.80 7.90 61.92
253 A A3 3 ongoing other nw br Construction of metalled road in various streets of ward no. 3 (Part - I) (i) Construction of Mettaled Road in Streets of Mohalla Gagandeep Colony St. No.6 to 11. (37.71) (ii) Construction of Mettaled Road in Streets of Mohalla Gagandeep Colony St. No.1 to 5. (33.52) (iii) Construction of Mettaled Road in Streets of Mohalla New Gagandeep Colony. (35.61) (PIDB Work of Phase-II East) BMPC (i) Mohalla Gagandeep Colony St. No.6 to 11. (ii) Mohalla Gagandeep Colony St. No.1 to 5. (iii) Mohalla New Gagandeep Colony. 106.84 102.00 M/s Gupta Contractor Pvt. Ltd. A/br/2016/04 27/05/2016 4 62.00 60.34 32.00 70
254 A A3 3 ongoing other nw br Construction of metalled road in various streets of ward no. 3 (Part - II). (i) Construction of Mettaled Road in Streets of Mohalla New Shimla Colony. (16.04) (ii) Construction of Mettaled Road in Streets of Mohalla Shimla Colony. (34.09) (iii) Construction of Mettaled Road in Streets of Mohalla Luxmi Colony. (21.76) (iv) Laying BM/PC in Balance Streets of Mohalla Kailash Nagar in front of Bedi Sweets. (27.61) (PIDB Works of Phase-II East) BMPC (i) Mohalla New Shimla Colony (ii) Mohalla Shimla Colony (iii) Mohalla Luxmi Colony (iv) Mohallla Kailash Nagar in front of Bedi Sweets. 99.50 95.00 Shiva Constructions. A/br/2016/03 27/05/2016 3 95.00 62.46 18.94 76.06
255 A A3 3 ongoing other nw br Providing & Fixing 80mm thick Interlocking Tiles in Streets of Mohalla Royal Estate (Part- I) (PIDB Work of Phase-III East) ILT80 Mohalla Royal Estate (Part- I) 46.47 39.15 Apex Developers A/br/2016/77 07/10/2016 2 90.00 22.36 9.74 29.41
256 A A3 3 ongoing other nw br P/F 80mm thick I/tiles in streets of Mohalla Shimla Colony near streets of Fauji Property Dealer in ward no.3 and P/F 80mm thick I/tiles in Mohalla New Shimla Colony (Part-II) in ward no.3. ILT80 Mohalla Shimla Colony near streets of Fauji Property Dealer in ward no.3 and P/F 80mm thick I/tiles in Mohalla New Shimla Colony (Part-II) in ward no.3. 67.00 54.12 K.C Builders A/br/2017/97 03/04/2017 3 100.00 53.94 0.00 54.12
257 A A3 3 ongoing other mw br Maintenance work of streets of Mohalla Shimla Colony in ward no.3. Others Mohalla Shimla Colony in ward no.3. 4.96 4.51 The Lubana Co-op L&C Society Ltd A/br/2017/141 22/12/2017 1 100.00 3.73 0.00 4.51
258 A A3 3 ongoing other nw br P/fixing 80mm thick I/tiles in streets of Mohalla Vishal Colony Part-II in ward no.3. ILT80 Mohalla Vishal Colony Part-II in ward no.3 61.12 42.77 M/s Gagandeep Arora Govt. Contractor A/br/2017/151 29/12/2017 3 100.00 22.19 19.98 22.79
259 A A3 3 ongoing other nw br P/fixing 80mm thick I/tiles in streets of Mohalla Vishal Colony Part-I in ward no.3. ILT80 Mohalla Vishal Colony Part-I in ward no.3. 80.54 56.94 M/s R.K. Const. Company A/br/2017/153 29/12/2017 3 100.00 11.17 51.68 5.26
260 A A3 3 ongoing other nw br P/fixing Sign Board in area of ward no.3. Others area of ward no.3. 6.19 4.89 The Lubana Co-op L&C Const.Society Ltd. A/br/2017/155 29/12/2017 1 0.00 0.00 0.00 4.89
261 A A3 3 ongoing other nw br P/fixing 60mm thick I/tiles in Pending streets of ward no. 3. ILT60 Pending streets of ward no. 3. 50.10 35.84 M/s Dynamic tiles A/br/2017/159 29/12/2017 3 0.00 0.00 0.00 35.84
262 A A3 3 ongoing other nw br Providing & Fixing 80mm thick I/tiles in streets of Mohalla New Shimla Colony and Golden Enclave in ward no.3. ILT80 Mohalla New Shimla Colony and Golden Enclave in ward no.3. 54.29 37.55 T&G Const. Co. A/br/2018/185 24/04/2018 3 90.00 22.37 26.32 11.23
263 A A3 3 ongoing other nw br P/fixing 60mm thick I-tiles in pending streets of ward no.3. ILT60 In pending streets of ward no.3 80.35 56.97 NKC Constructions Private Limited A/br/2018/177 24/04/2018 3 100.00 3.85 50.50 6.47
264 A A3 3 ongoing cq nw br P/fixing 60mm thick I/tiles in Mohalla Basant Vihar Pink City and P/fixing 60mm thick I/tiles in Mohalla Inder Vihar Part-I in new w.no.4. ILT60 Mohalla Basant Vihar Pink City & Mohalla Inder Vihar Part-I in new w.no.4.. 56.00 39.50 Swardha Builders A/br/2019/42/EEA 08/03/2019 3 75.00 26.10 0.00 39.5
265 A A3 3 ongoing cq nw br P/fixing 60mm thick I/tiles in Mohalla Prem Vihar Part-II in ward no.4. ILT60 Mohalla Prem Vihar Part-II in new w.no.4. 43.16 30.38 Gagan Deep Arora A/br/2019/44/EEA 08/03/2019 3 5.00 0.00 0.00 30.38
266 A A3 4 ongoing cq nw br Construction of Streets by laying RMC flooring in Mohalla Naginder Nagar St. no.6 RMC4 St. No. 6 Naginder Nagar 10.00 8.68 Kabir Infra Pvt. Ltd. A/br/2013/85 05/12/2013 4 100.00 8.00 0.00 8.68
267 A A3 4 ongoing cq nw br Dev. of Streets in Mohalla Kailash nagar BMPC Kailash Nagar 15.72 13.28 M/s Shiva Constructions A/br/2014/107 27/01/2014 6 100.00 0.00 0.00 13.28
268 A A3 4 ongoing cq nw br Construction of Streets by laying BM & PC in Mohalla Guru Vihar Part - 'C' BMPC Mohalla Guru Vihar Part (C) 17.03 14.15 M/s Sunil Kumar Contractor A/br/2014/104 27/01/2014 2 100.00 13.50 0.00 14.15
269 A A3 4 ongoing cq nw br Dev. of Streets in Janta Colony BMPC Janta colony near Gurudwara Baga Singh 11.06 9.35 M/s Shiva Constructions A/br/2014/107 27/01/2014 6 100.00 9.00 0.00 9.35
270 A A3 4 ongoing cq nw br Dev. of Streets in Mohalla Ram Vihar BMPC Ram Vihar 18.23 15.41 M/s Shiva Constructions A/br/2014/107 27/01/2014 6 100.00 14.40 0.00 15.41
271 A A3 4 ongoing cq nw br Dev. of Streets in Mohalla New Kuldeep Nagar St. no.4 & Links BMPC New Kuldeep Nagar st.no.4 & links 12.29 10.38 M/s Shiva Constructions A/br/2014/107 27/01/2014 6 100.00 11.90 0.00 10.38
272 A A3 4 ongoing cq nw br Laying BM & PC in Remaining Streets of Kailash Nagar. BMPC Kailash Nagar (balance) 17.70 14.91 M/s Shiva Constructions A/br/2014/105 27/01/2014 2 100.00 0.00 0.00 14.91
273 A A3 4 ongoing cq nw br Dev. of Streets in Mohalla Guru Vihar St. no.2 BMPC Mohalla Guru Vihar st.no.2 16.44 13.89 M/s Shiva Constructions A/br/2014/107 27/01/2014 6 100.00 0.00 0.00 13.89
274 A A3 4 ongoing gq nw br Laying RMC on Gehlewal Road from Rahon Road to Village Gehlewal. RMC4 Village Gahlewal road 42.97 36.52 M/s K.C Builders A/br/2013/99 30/12/2013 3 100.00 38.50 0.00 36.52
275 A A3 4 ongoing cq nw br Construction of Mettaled Road in Streets of Mohalla New Baldev Nagar. BMPC Mohalla New Baldev Nagar 61.28 51.76 M/s Shiva Constructions A/br/2014/121 18/02/2014 4 100.00 0.00 0.00 51.76
276 A A3 4 ongoing mlaq nw br Laying RMC M-20 in Streets of Krishna Colony (with Maintenance of Five Years) RMC4 Mohalla Krishna Colony 61.18 47.96 M/s J.B & Co. A/br/2015/156 31/08/2015 4 100.00 0.00 0.00 47.96
277 A A3 4 ongoing mplad nw br Renovation of Guru Ravi Dass Dharmshalla Mohalla Baldev Nagar Rahon Road. Buildings Mohalla Baldev Nagar 4.00 3.82 M/S Ashok Kumar Sobti A/br/2015/197 15/12/2015 1 100.00 3.26 0.00 3.82
278 A A3 4 ongoing other nw br Construction of Road From Gehlewal Gurdwara to Main Kailash Nagar Road. (PIDB Works of Phase-I East) BMPC From Gehlewal Gurdwara to Main Kailash Nagar Road. 40.53 38.71 S.S Singla A/br/2016/219 03/05/2016 2 95.00 0.00 0.00 38.71
279 A A3 4 ongoing other nw br P/fixing 80mm thick interlocking tiles in streets of Mohalla Baldev Nagar.(PIDB Works of Phase-I East) ILT80 Mohalla Baldev Nagar. 96.35 88.64 M/s Inderjit Singh A/br/2016/209 22/04/2016 4 100.00 9.99 78.07 10.57
280 A A3 4 ongoing other nw br (i) Laying 80mm thick Interlocking Tiles in Balance Streets of Mohalla Vardhman Nagar.(43.77) (ii) Providing & Laying 80mm Thick Interlocking Tiles in Mohalla Naginder Nagar.(44.41) (PIDB Works of Phase-I East) ILT80 (i) Mohalla Vardhman Nagar (ii) Mohalla Naginder Nagar. 84.88 78.09 Friends & Co. A/br/2016/208 22/04/2016 4 80.00 0.00 0.00 78.09
281 A A3 4 ongoing other nw br (i) Construction of Mettaled Road in Streets of Mohalla Guru Vihar St. No.4.(27.87) (ii) Construction of Mettaled Road in Streets of Mohalla Janta Colony (Part-I).(14.68) (iii) Laying BM/PC in Balance streets of Main Kailash Nagar near Bedi sweets.(22.07) (PIDB Works of Phase-I East) BMPC (i) Mohalla Guru Vihar St. No.4 (ii) Mohalla Janta Colony Part-I (iii) Main Kailash NagarRoad Near Bedi Sweets. 64.10 61.22 S.S Singla A/br/2016/218 03/05/2016 4 70.00 6.03 22.30 38.92
282 A A3 4 ongoing other nw br (i) Providing & Fixing 80mm Thick Interlocking Tiles in Remaining Streets of Mohalla Kailash Nagar.(39.63) (ii) Providing & Laying 80mm thick Interlocking Tiles in Mohalla Kiran Vihar.(28.11) (PIDB Works of Phase-I East) ILT80 (i) Mohalla Kailash Nagar (ii) Mohalla Kiran Vihar. 65.25 60.03 K.C Builders A/br/2016/12 03/06/2016 3 100.00 9.24 48.02 12.01
283 A A3 4 ongoing other nw br (i) Construction of Mettaled Road in Streets of Mohalla Mangat Colony.(18.53) (ii) Construction of Mettaled Road in Streets of Mohalla Guru Vihar Part-C(20.37) (PIDB Works of Phase-I East) BMPC (i) Mohalla Mangat Colony (ii) Mohalla Guru Vihar Part-C 38.77 37.03 S.S Singla A/br/2016/217 03/05/2016 2 65.00 4.77 9.44 27.59
284 A A3 4 ongoing other nw br i) Providing & Fixing 80mm Thick Interlocking Tiles in Mohalla Sant Vihar.(37.94) (ii) Providing & Fixing 80mm Thick Interlocking Tiles in Streets of Mohalla Kuldeep Nagar.(23.68) (PIDB Works of Phase-I East) ILT80 (i) Mohalla Sant Vihar (ii) Mohalla Kuldeep Nagar. 59.34 54.89 M/s Inderjit Singh A/br/2016/13 03/06/2016 3 100.00 9.38 43.67 11.22
285 A A3 4 ongoing other nw br Construction of metalled road in various streets of ward no. 4 (i) Construction of Mettaled Road & Laying RMC in Streets of Mohalla Janta Colony. (15.60) (ii) Construction of Mettaled Road in Streets of Mohalla Mangat Colony. (25.55) (iii) Construction of Mettaled Road in Streets of Mohalla New Kailash Nagar. (18.15) (PIDB Works of Phase-II East) BMPC (i) Mohalla Janta Colony (ii) Mohalla Mangat Colony (iii) Mohalla New Kailash Nagar. 59.30 56.63 S.S Singla A/br/2016/40 24/06/2016 3 70.00 0.00 0.00 56.63
286 A A3 4 ongoing other nw br Laying RMC in different streets of ward no. 4. (i) Laying RMC in Mohalla Guru Vihar street no. 4 (Part C) (8.65) (PIDB Works of Phase-II East) RMC4 Mohalla Guru Vihar street no. 4 (Part C). 8.65 8.16 The Khairay Co-op L&C Society Ltd. A/br/2016/58 22/07/2016 1 95.00 6.21 0.00 8.16
287 A A3 4 ongoing other nw br P/Laying 80mm thick interlocking tiles in various streets of ward no. 4 (i) Providing & Laying 80mm Thick Interlocking Tiles in Mohalla Krishna Colony. St. no. 7,8,9&10. (29.56) (ii) Providing & Fixing 80mm thick Interlocking Tiles in Mohalla Kailash Nagar St. No.2 & New Kuldeep Nagar St. No.6. (42.66) (iii) Providing & Fixing 80mm thick Interlocking Tiles in Mohalla New Kuldeep Nagar St. No.1, 2, 3 & Links. (71.26) (PIDB Works of Phase-II East) ILT80 (i) Mohalla Krishna Colony St. No.7,8,9&10 (ii) Mohalla Kailash Nagar St. No.2 & New Kuldeep Nagar St. No.6 (iii) Mohalla New Kuldeep Nagar St. No.1,2,3 & links. 143.48 132.00 M/s Inderjit Singh A/br/2016/28 03/06/2016 4 100.00 21.77 107.69 24.31
288 A A3 4 ongoing other nw br P/fixing 80mm thick I/tiles in Mohalla Krishna Colony in street no.5 and links in ward no.4. & P/fixing 80mm thick I/tiles in Mohalla Kuldeep Nagar st.no.4 and 5 and links in ward no.4. ILT80 Mohalla Krishna Colony in street no.5 and links & Mohalla Kuldeep Nagar st.no.4 and 5 and links 84.30 74.92 S.K Construction Co. A/br/2016/82 07/12/2016 4 100.00 73.32 0.00 74.92
289 A A3 4 ongoing other nw br P/fixing 80mm thick I/tiles in streets of Mohalla Jujhar Nagar in ward no.4 and P/fixing 80mm thick I/tiles in streets of Mohalla Janta Colony near Nav Durga Mandir in ward no.4. ILT80 Mohalla Jujhar Nagar & Mohalla Janta Colony near Nav Durga Mandir 36.14 34.13 The Khairay Co-op L/C Society Ltd. A/br/2016/83 07/12/2016 3 100.00 33.49 0.00 34.13
290 A A3 4 ongoing other nw br P/F 80mm thick I/tiles in Main Kuldeep Nagar Road To Janta Colony Rahon Road links in ward no.4. ILT60 Main Kuldeep Nagar Road To Janta Colony Rahon Road links in ward no.4 57.89 46.76 M/s Inderjit Singh A/br/2017/99 03/04/2017 2 100.00 51.42 0.00 46.76
291 A A3 4 ongoing other nw br Laying RMC M-20 in streets of Mohalla New Kuldeep Nagar branch of street no.4. RMC4 Mohalla New Kuldeep Nagar branch of street no.4. 43.37 36.43 Rajesh Kumar Sood A/br/2017/110 15/06/2017 2 100.00 31.77 0.00 36.43
292 A A3 4 ongoing other nw br P/fixing 80mm thick I/tiles in Mohalla Naginder Nagar st.no.1,2,3 & 4 in ward no.4 and P/fixing 80mm thick I/tiles in streets of Village Gehlewal in ward no.4. ILT80 Mohalla Naginder Nagar st.no.1,2,3 & 4 in ward no.4 and Village Gehlewal in ward no.4. 54.25 38.02 M/s Jaikar INC A/br/2017/150 29/12/2017 2 100.00 6.40 27.20 10.82
293 A A3 4 ongoing other nw br P/fixing 60mm thick I/tiles in Mohalla Vardhman Nagar Part-II in ward no.4 and Laying RMC M-20 in streets of Mohalla Guru Vihar in ward no.4. Others Mohalla Vardhman Nagar Part-II in ward no.4 and Mohalla Guru Vihar in ward no.4. 78.68 55.08 M/s Ashok Kumar Sobti A/br/2017/154 29/12/2017 3 0.00 0.00 0.00 55.08
294 A A3 4 ongoing other mw br Maintenance of Park in Krishan Colony in ward no. 4. Parks Krishan Colony in ward no. 4. 2.91 2.32 Maa Chintapurni Construction A/br/2017/157 29/12/2017 1 100.00 1.88 0.00 2.32
295 A A3 4 ongoing other nw br Laying RMC M-20 in Streets of Mohalla Guru Vihar in W.No.4. BMPC Mohalla Guru Vihar 78.68 55.08 M/S Ashok Kumar Sobti A/br/2017/154 29/12/2017 3 70.00 29.66 0.00 55.08
296 A A3 4 ongoing other nw br Providing & fixing 80mm thick I/tiles in streets of Mohalla Krishna Colony in st.no.1,2,7,9 and 10 in ward no.4. ILT80 Mohalla Krishna Colony in st.no.1,2,7,9 and 10 in ward no.4. 88.17 61.69 Inderjit Singh A/br/2018/184 24/04/2018 4 100.00 51.57 0.00 61.69
297 A A3 4 ongoing other nw br P/fixing 80mm thick I/tiles in streets of Mohalla Jujhar Nagar in ward no.4. ILT80 Mohalla Jujhar Nagar in ward no.4. 98.85 69.63 Sham Sunder Singla A/br/2018/179 24/04/2018 4 50.00 24.59 0.00 69.63
298 A A3 4 ongoing other nw br P/fixing 60mm thick I/tiles in streets of Mohalla Vivek Dham (Part-II) ILT60 Mohalla Vivek Dham 65.65 46.87 Vishal Kumar Bhatia A/br/2018/09 14/06/2018 3 0.00 0.00 0.00 46.87
299 A A3 4 ongoing other nw br P/fixing 60mm thick I/tiles in streets of Mohalla Vivek Dham (Part-I) ILT60 Mohalla Vivek Dham 56.06 39.91 R.K Construction A/br/2016/10 14/06/2016 3 100.00 33.68 0.00 39.91
300 A A3 4 ongoing other nw br P/fixing 60mm thick I/tiles in streets of Mohalla Pink City ILT60 Mohalla Pink City 57.50 41.50 Vishal Kumar Bhatia A/br/2018/11 16/06/2018 3 100.00 20.24 14.65 26.85
301 A A3 4 ongoing cq nw br Construction of BM/SDBC in streets of Mohalla Aamantran Colony in ward no.5. BMPC Mohalla Aamantran Colony 78.36 74.44 Apex Builders A/br/2018/13 14/06/2018 3 50.00 35.80 28.90 45.54
302 A A3 4 ongoing other nw br Laying RMC M-20 in streets of Mohalla Guru Vihar Shankar Road and P/fixing 60mm thick I/tiles in Mohalla Janta Colony (old ward no.4.) Others Mohalla Guru Vihar Shankar Road & Mohalla Janta Colony 47.03 32.11 Ahuja Builders and Constructions Company A/br/2018/16 25/07/2018 3 100.00 14.78 13.45 18.66
303 A A3 4 ongoing other nw br Providing & fixing 60mm thick interlocking tiles in streets of Mohalla New Laxmi Colony in ward no.4. ILT60 Mohalla New Laxmi Colony in ward no.4. 32.34 24.82 The Dharour Co-op L/C Society Ltd. A/br/2018/170 30/01/2018 3 100.00 20.11 0.00 24.82
304 A A3 4 ongoing other nw br Construction of BM/PC Road in streets of Village Gehlewal (Industrial Area) and Construction of BM/PC Road in streets of Mohalla Janta Colony in new ward no.6. BMPC Mohalla Janta Colony 74.76 61.90 Apex Devlopers A/br/2019/22 07/01/2019 3 0.00 0.00 0.00 61.9
305 A A3 4 ongoing other nw br Laying RMC M-20 in streets of Mohalla Guru Vihar Main Road & P/fixing 60mm thick I/tiles in side of Mohalla Guru Vihar Main Road in new ward no.6. RMC4 Mohalla Guru Vihar Main Road 63.37 45.54 NKC Constructions Private Limited A/br/2019/24 07/01/2019 3 55.00 24.54 0.00 45.54
306 A A3 4 ongoing other nw br P/fixing 60mm thick I/tiles in Mohalla Prem Vihar Part-I in ward no.4. ILT60 Mohalla Prem Vihar Part-I in new w.no.4. 44.75 31.32 Gagan Deep Arora Govt. Contractor A/br/2019/45/EEA 08/03/2019 3 100.00 24.64 0.00 31.32
307 A A3 4 ongoing cq nw br P/fixing 60mm thick I/tiles in Mohalla Basant Vihar Pink City and P/fixing 60mm thick I/tiles in Mohalla Inder Vihar Part-I in w.no.4. ILT60 Mohalla Basant Vihar Pink City and in Mohalla Inder Vihar Part-I in w.no.4. 56.00 39.50 Swardha Builders A/br/2019/42 08/03/2019 3 100.00 11.13 26.09 13.41
308 A A4 24 ongoing cq nw br Laying 80mm I/T in street of Vijay Nagar. ILT80 Streets of Vijay Nagar 33.56 29.16 Inderjit Singh A/br/2013/91/24/2 09/12/2013 6 100.00 28.80 0.00 29.16
309 A A4 24 ongoing cq nw br Laying BM/PC in Nanak Nagar near Baba Balak Nath Mandir. BMPC Nanak Nagar near Baba Balak Nath Mandir. 11.94 10.11 Shiva Constructions A/br/2014/102 27/01/2014 3 100.00 10.02 0.00 10.11
310 A A4 24 ongoing cq nw br Laying 60mm I/T in street of Mohalla Karabara. ILT60 Sts. of Mohalla Karabara 6.84 5.95 Inderjit Singh A/br/2013/91 09/12/2013 6 100.00 5.80 0.00 5.95
311 A A4 24 ongoing cq nw br Laying RMC M-20 in streets of Bindra Colony in w.no.24. RMC4 Bindra Colony 19.56 17.11 M/s H.K Constructions A/br/2014/130 04/03/2014 2 100.00 2.27 0.00 17.11
312 A A4 24 ongoing cq nw br Laying RMC M-20 in Vijay Nagar streets in ward no.24. RMC4 Vijay Nagar streets. 16.49 15.29 M/s Jagdambay Co-op Society A/br/2015/179 24/09/2015 2 100.00 15.67 0.00 15.29
313 A A4 24 ongoing gq mw br Maintenance work in Park near Dr. Ambedkar chowk Old G.T road in ward no.24. Others Near Dr. Ambedkar chowk Old G.T road in ward no.24. 2.17 1.89 M/s The Samrala Co-op L&C Society Pvt. Ltd. A/br/2015/192 23/10/2015 1 5.00 0.00 0.00 1.89
314 A A4 24 ongoing other nw br (i) Laying RMC M-20 flooring in New Vishnu Puri in ward no.24. (PIDB works of Phase I-North) RMC4 New Vishnu Puri in ward no.24. 31.32 30.07 Jagdambay Co-op L/C Society Ltd. A/br/2016/235 10/05/2016 2 80.00 19.97 0.00 30.07
315 A A4 24 ongoing other nw br P/ Laying 60mm thick interlocking tiles in Karabara Mohalla. (PIDB works of Phase I-North) ILT60 Karabara Mohalla 19.34 18.57 The Dehlon Harjan L/C Society Lts A/br/2016/237 10/05/2016 2 90.00 9.95 5.27 13.3
316 A A4 24 ongoing other nw br Laying RMC in different streets of ward no. 24, (I) Laying PCC M-20 in street & links Mohalla Nanak Nagar. (PIDB works of Phase I-North) RMC4 Street & links Mohalla Nanak Nagar. 44.44 40.00 Gagandeep Arora A/br/2016/24 03/06/2016 2 85.00 3.69 19.56 20.44
317 A A4 24 ongoing cq nw br Recarpeting of road with 30mm thick SDBC Bahadurke Road Old G.T Road near Petrol Pump to Jalandhar Bye Pass Road in ward no.24. SDBC Bahadurke Road Old G.T Road near Petrol Pump to Jalandhar Bye Pass Road 19.93 19.03 S.K. Const. Co. A/br/2017/102 05/04/2017 1 0.00 0.00 0.00 19.03
318 A A4 24 ongoing cq nw br Laying RMC M-20 in streets of Madho Puri ward no.20 and Laying RMC M-20 in street near Kochar Bakery and Vipan Karyana Store Vishnu Puri. RMC4 Madho Puri w.no.20, Vishnu Puri w.no.24. 52.05 42.89 Navyug Company A/br/2017/106 10/04/2017 2 24.00 9.79 0.00 42.89
319 A A4 24 ongoing cq nw br Re-carpeting of road with 30mm thick SDBC on Bindra Colony main road and Salem Tabri School road in ward no.24. SDBC Bindra Colony main road and Salem Tabri School road 23.37 22.20 Dass Builders Pvt. Ltd. A/br/2016/65 23/08/2016 1 0.00 0.00 0.00 22.2
320 A A4 24 ongoing cq nw br Re-carpeting of road with 30mm thick SDBC on Guru Nanak Nagar in ward no.24. SDBC Guru Nanak Nagar in ward no.24. 14.47 13.74 M/s Dass Builders A/br/2016/67 05/09/2016 1 0.00 0.00 0.00 13.74
321 A A4 24 ongoing cq nw br Laying RMC M-20 in Bindra Colony Arjun Nagar in ward no.24. RMC4 Bindra Colony Arjun Nagar in ward no.24. 9.63 8.84 Kohinoor Builders A/br/2017/111 03/07/2017 1 100.00 8.83 0.00 8.84
322 A A4 24 ongoing cq nw br (I) P/F speed breaker & sign boards in area of w. no. 20, (II) Renovation of park on old G.T. Road near Chaman Devi School in w. no. 24 (III) Maintenance of Park in New Vishnupuri in w. no. 24 Others Area of w. no. 20, Old G.T. Road near Chaman Devi School, New Vishnupuri 35.70 33.34 S.K. Construction Co. A/br/2017/114 28/07/2017 2 25.00 6.84 0.00 33.34
323 A A4 24 ongoing other nw br Laying RMC M-20 in st. no.1 to 3 and links of New Vishnu Puri in ward no.24 RMC4 New Vishnu Puri in ward no.24 56.66 43.34 M/s Ashok Kumar Sobti A/br/2017/128 07/12/2017 3 45.00 12.94 0.00 43.34
324 A A4 24 ongoing cq nw br Construction of roads of Baikunth Nagar & Arjun Nagar of Ward No. 24 RMC4 Baikunth Nagar & Arjun Nagar 38.01 28.88 The Sutlej co-op Labour & Construction Society A/br/2017/145 29/12/2017 4 100.00 30.71 1.06 27.82
325 A A4 24 ongoing cq nw br (I) Construction of RMC M-20 in Road in Vaishnu Devi Colony in ward no.24. (II) Raising level of road in front of Shiv Shakti Karyana Store in Nanak Nagar Main Road & Street No 9 in Ward No.24. (III) P/Laying I/tiles in various streets of Mohalla Karabara Ward No.24. Others Different area of Ward No. 24 53.27 45.10 NKC Constructions Pvt.ltd. A/br/2017/146 29/12/2017 3 50.00 9.91 14.57 30.53
326 A A4 24 ongoing cq nw br Rejuvenation of Service Lane/ Road from Ambedkar Chowk to Petrol Pump on Old G.T Road in ward no.24. BMPC Service Lane/ Road from Ambedkar Chowk to Petrol Pump 67.43 64.06 M/s C.H. Builders Pvt. Ltd. A/br/2008/163 16/01/2008 5 50.00 36.50 0.00 64.06
327 A A4 25 ongoing cq nw br Laying 80mm I/T in street of New Model Colony near Chawla Kids. ILT80 Model Colony near Chwala Kids 16.76 13.72 M/s Singla and Co. A/br/2013/98/1 17/12/2013 5 100.00 13.72 0.00 13.72
328 A A4 25 ongoing cq nw br Laying 80mm I/T in street of New Kartar Nagar near Park. ILT80 New Kartar Nagar near Park 11.24 9.20 M/s Singla & Co. A/br/2013/98 17/12/2013 5 100.00 9.20 0.00 9.2
329 A A4 25 ongoing cq nw br Laying 80mm I/T in street of Bhora Colony. ILT80 Bhaura Colony 20.82 17.05 M/s Singla & Co. A/br/2013/98/2 17/12/2013 5 100.00 17.05 0.00 17.05
330 A A4 25 ongoing cq nw br Laying 80mm I/T in street of New Aman Nagar near Kanchan Hospital. ILT80 New Aman Nagar near Kanchan Hospital 22.86 18.72 M/s Singla & Co. A/br/2013/98 17/12/2013 5 100.00 17.62 0.00 18.72
331 A A4 25 ongoing cq nw br Laying RMC in Sanju Chicken wali gali RMC4 Sanju Chicken wali gali. 2.18 1.68 M/s Gurmaij singh A/br/2014/118 11/02/2014 1 100.00 1.68 0.00 1.68
332 A A4 25 ongoing cq nw br Laying RMC in Neta ji Nagar. RMC4 Neta ji Nagar 8.51 7.91 M/s Jagdambay Co-op Labour Society A/br/2014/127 04/03/2014 3 100.00 7.89 0.00 7.91
333 A A4 25 ongoing cq nw br Laying RMC M-20 in Dhal sweet shop Salem Tabri. RMC4 Dhal sweet shop Salem Tabri. 16.94 15.51 M/s Jagdambay Co-op Labour Society A/br/2014/128 04/03/2014 3 100.00 15.50 0.00 15.51
334 A A4 25 ongoing cq nw br Laying RMC M-20 in Dasmash Cold store. RMC4 Dasmash Cold store. 16.78 15.63 M/s Jagdambay Co-op Labour Society A/br/2014/129 04/03/2014 3 100.00 12.31 0.00 15.63
335 A A4 25 ongoing gq nw br Patch work of PCC streets in area of ward no.25. Others In area of ward no.25. 4.87 4.29 M/s The Samrala Co-op L/C society Ltd. A/br/2015/188 23/10/2015 1 100.00 4.29 3.73 0.56
336 A A4 25 ongoing gq nw br Laying 20mm thick Mix seal Surface on Main Salem Tabri Road,Main Road Gursagar Vihar and 30' Church road. BMPC Main Salem Tabri road & Main Road Gursagar Vihar and 30' Church road. 33.79 32.42 M/s Dass Builders A/br/2011/229EEA 16/12/2011 3 100.00 36.96 0.00 32.42
337 A A4 25 ongoing cq nw br P/fixing sign board in area of ward no.25. Others Area of ward no.25. 2.17 1.66 M/s The Dehlon Harijan Co-op L/C Society Pvt. Ltd. A/br/2015/185 16/10/2015 1 5.00 0.00 0.00 1.66
338 A A4 25 ongoing other nw br Repair and Replacement of MS Grills and Boundary wall of Park on Old G.T Road in w.no.25. Others Park on Old G.T Road in w.no.25. 29.60 27.04 M/s Durga Const. Co. A/br/2016/34 21/06/2016 2 95.00 18.14 10.62 16.42
339 A A4 25 ongoing other nw br Laying RMC in different streets of ward no. 25. (I) Laying RMC M20 in Church Opp. Sadhu Ashram. (31.34) (II) Laying RMC M-20 in streets of Guru Sagar Vihar near Gurudwara Guru Sagar Vihar in ward no. 25 (27.29) (PIDB works of Phase II North) RMC4 (I) Church Opp. Sadhu Ashram , (II) Guru Sagar Vihar near Gurudwara Guru Sagar Vihar in ward no. 25 58.63 51.21 Neeraj A/br/2016/36 23/06/2016 2 95.00 4.36 40.77 10.44
340 A A4 25 ongoing other nw br (I) Laying RMC M20 in Simran Painting and Sadhu Ashram Bhoura Colony. (II) Laying RMC M20 in streets of Guru Sagar Vihar & links near Sikh Missonery School (PIDB works of Phase I-North) RMC4 Simran Painting and Sadhu Ashram Bhoura Colony 61.19 55.07 P P Enterprises A/br/2016/17 03/06/2016 3 90.00 10.52 17.87 37.2
341 A A4 25 ongoing other nw br P/F of I/tiles in Service lane Salem Tabri in Peeru Banda Road upto Petrol Pump & P/F 60/80mm thick I/tiles paver block in Guru Sagar Vihar New Kartar Nagar link street in w.no.25. BMPC Service lane Salem Tabri in Peeru Banda Road upto Petrol Pump & Guru Sagar Vihar New Kartar Nagar link street in w.no.25. 99.47 81.96 M/s Durga Const. Co. A/br/2016/93 29/12/2016 4 90.00 26.53 45.88 36.08
342 A A4 25 ongoing other nw br P/F 80mm thick I/tiles paver block in Peeru Banda, New Kartar Nagar and Punjabi Bagh Colony and link streets in w.no.25. & P/F 60mm thick I/tiles paver block in Service Lane Peeru Banda Road & link streets in ward no.25. ILT60 Peeru Banda, New Kartar Nagar and Punjabi Bagh Colony and link streets in w.no.25. & Service Lane Peeru Banda Road & link streets in ward no.25. 81.19 60.05 M/s Durga Const. Company A/br/2016/94 29/12/2016 3 40.00 43.57 17.34 42.71
343 A A4 25 ongoing cq nw br (I) Renovation of Shri Guru Amar Dass Ji Dispensary in ward no.25 (II) Const. of Room/Check Post/Toilet & renovation of Park and Const. of New Fountain / open Gym in front of Amar Sweet Shop Salem Tabri in ward no.25. Others Salem Tabri 40.08 36.66 M/s Durga Const. Co. A/br/2017/104 05/04/2017 2 0.00 0.00 0.00 36.66
344 A A4 25 ongoing other nw br Renovation of Senior Citizen Home Salem Tabri in ward no.25. Others Salem Tabri in ward no.25. 3.22 3.05 Kohinoor Builders A/br/2018/175 12/04/2018 2 100.00 3.21 0.00 3.05
345 A A4 25 ongoing cq nw br P/fixing of speed bumps "2" dark eye make complete as per M.O.S.T specification in ward no.25. Others ward no.25. 2.77 2.10 M/s The Dehlon Harijan Co-op L&C Society Pvt. Ltd. A/br/2015/193 23/10/2015 1 100.00 2.76 0.00 2.1
346 A A4 25 ongoing cq nw br Repair & Renovation of Park in Punjab Bagh Ward no.25. New Ward No. 89. Parks Park in Punjab Bagh Ward no.25. New Ward No. 89. 1.90 1.86 M/s R.K. Sood A/br/2018/19 25/07/2018 1 0.00 0.00 0.00 1.86
347 A A4 25 ongoing cq nw br Repair & Renovation of 3 Parks in Salem Tabri Ward no.25. (New w.no.89) Parks 3 Parks in Salem Tabri Ward no.25. (New w.no.89) 1.95 1.91 M/s Rajesh K. Sood A/br/2018/15 25/07/2018 2 0.00 0.00 0.00 1.91
348 A A4 25 ongoing other nw br (I) P/Laying 60mm thick interlocking tiles in streets near Central Bank of India & streets near Khera Cement in Lakshmi Puri, Salem Tabri in ward no.89, (II) Construction of Brick Masonary Wall in Maintenance Store of Sub Zone-A4 (III) Repair & Renovation of Office Building Sub Zone-A3 (B&R) New Sabji Mandi. New Ward No. 89 Others Salem Tabri in ward no.89, Maintenance Store of Sub Zone-A4, Office Building Sub Zone-A3 42.66 32.48 Durga Construction Co. A/br/2019/37 08/03/2019 3 70.00 18.53 0.00 32.48
349 A A4 32 ongoing cq nw br Laying RMC in Dera Tahal Singh Peeru banda road RMC4 Dera Tahal Singh Peeru Banda. 12.22 11.62 Gill Co-op L/C Society Diploma Holder Ltd. A/br/2014/101 27/01/2014 2 100.00 9.47 9.47 2.15
350 A A4 32 ongoing cq nw br Building works in Civil Dispensary Chawni Mohalla Buildings Civil Dispensary Chawni Mohalla. 4.95 4.43 M/s Om Traders A/br/2014/119 18/02/2014 2 100.00 4.43 0.00 4.43
351 A A4 32 ongoing gq nw br Earth filling in Peeru Banda Mohalla & Links. Others Peeru Banda Mohalla & Links. 2.67 1.59 M/s Maa Chint Purni Const. A/br/2014/133 12/09/2014 1 100.00 1.31 0.00 1.59
352 A A4 32 ongoing other nw br P/Fixing sign boards and speed bumps in ward no.32. Others Ward no.32 4.84 4.06 The National Co-op L&C Society Ltd. A/br/2015/148 12/06/2015 1 95.00 3.50 0.00 4.06
353 A A4 32 ongoing gq nw br P/fixing interlocking tiles/paver blocks 60&80mm thick in the area of sub zone-A4 in ward no.32 (With Mtc.of 5 years). ILT60 Ward no.32 Sub Zone-A4. 67.07 54.79 M/s Dass Builder Pvt. Ltd. A/br/2013/90 09/12/2013 5 100.00 52.04 0.00 54.79
354 A A4 32 ongoing gq nw br Const. of New Boundary wall around the Child Grave Yard in Peeru Banda in ward no. 32 Buildings Peerubanda Mohalla. 10.20 9.46 The Saharan Majra Co-op L&C Society Ltd. A/br/2015/147 12/07/2015 2 100.00 6.75 0.00 9.46
355 A A4 32 ongoing gq nw br Laying RMC in Pink Vihar. RMC4 Pink Vihar. 10.09 9.56 M/s The Ghangas Co-op L/C Society Ltd. A/br/2015/168 31/08/2015 2 100.00 8.11 0.00 9.56
356 A A4 32 ongoing cq nw br Patch work of PCC in Chawni Mohallaof ward no.32 Others Chawni Mohalla. 4.37 3.59 M/s The Samrala Co-op L&C Society Pvt.Ltd. A/br/2015/195 15/12/2015 1 100.00 3.58 3.12 0.47
357 A A4 32 ongoing cq nw br Patch work of PCC in Mohalla Peeru Banda in area of ward no.32 Others Mohalla Peeru Banda. 4.37 3.60 M/s The Samrala Co-op L&C Society Pvt.Ltd. A/br/2015/196 15/12/2015 1 100.00 3.60 0.00 3.6
358 A A4 32 ongoing other nw br Laying RMC in different streets of ward no. 32. (I) P/Laying RMC M-20 in streets of Chawni Mohalla in ward no.32 (II) Const. CC M-20 roads in Sargodha School wali gali & links in Chawni Mohalla & streets in Manna Singh Nagar in ward no.32 (III) Laying RMC M-20 near Ravi Iron store Ashok Sidhu near Shamshan Ghat (IV) Laying RMC M-20 on main road of Chawni Mohalla in ward no.32 (PIDB works of Phase II-North) RMC4 (I) Streets of Chawni Mohalla, (II) Sargodha School wali gali & links in Chawni Mohalla & streets in Manna Singh Nagar, (III) Near Ravi Iron store Ashok Sidhu near Shamshan Ghat (IV) Main road of Chawni Mohalla in ward no.32 173.84 147.24 P P Enterprises A/br/2016/5 27/05/2016 5 85.00 17.23 100.68 46.56
359 A A4 32 ongoing other nw br P/F sign boards area of ward no.32. Others Area of ward no.32. 4.95 3.84 The Dehlon Harijan Co-op L&C Society Ltd. A/br/2016/90 29/12/2016 1 0.00 0.00 0.00 3.84
360 A A4 32 ongoing cq nw br (I) Laying RMC M-20, PCC flooring & 60mm thick I/tiles near Baba Bohar wala Gurudwara Chawni Mohalla ward no.32. (II) Laying PCC flooring arround Sawa Gurudwara & RMC M-20 in Manna Singh Nagar near Channi Chowk in ward no.32. PCC Baba Bohar wala Gurudwara, Chawni Mohalla, Manna Singh Nagar near Channi Chowk 58.78 48.04 Gupta Engineers & Builders A/br/2017/101 05/04/2017 3 100.00 47.12 0.00 48.04
361 A A4 32 ongoing other nw br Laying PCC flooring near Kharbanda Chowk and Kastori lal House and RMC M-20 near Pipple Chowk Chawni Mohalla in w. no. 32 PCC Chawni Mohalla in w. no. 32 45.77 42.75 S.K. Construction Co. A/br/2017/115 28/07/2017 2 80.00 29.20 0.00 42.75
362 A A4 32 ongoing cq nw br (I) Laying RMC M-20 in Pipple Chowk to link street, Kaneya wali gali & link street in ward no.32 (II) Laying PCC in streets of Balmiki Mohalla & from Beli Ram Chowk to Domoria Bridge links (III) 60mm thick interlocking tiles from Ashok Kumar House towards Domoria Bridge in ward no.32. Others Pipple Chowk to link street, Kaneya wali gali & link street, Balmiki Mohalla & from Beli Ram Chowk to Domoria Bridge links, Ashok Kumar House towards Domoria Bridge 52.17 43.03 Gupta Constructions Pvt. Ltd. A/br/2017/116 28/07/2017 3 100.00 32.95 0.00 43.03
363 A A4 32 ongoing cq nw br (I) Maintenance work in park G.T road near Sant Ravi Dass park ward no.32 (II) Laying RMC M-20/60mm thick I/tiles in Mohalla Peeru Banda Salem Tabri in w. no. 32 (III) Maintenance of park in of Green Belt on G.T road Ram Dhan Park. RMC4 Ravi Dass park, Mohalla Peeru Banda Salem Tabri, Green Belt on G.T road Ram Dhan Park 98.57 79.89 Gupta Engineers and Builders A/br/2017/117 28/07/2017 2 33.00 31.14 0.00 79.89
364 A A4 32 ongoing other nw br Construction of road from Domoria Bridge to Kapoor Chowk via Arya School. New Ward No. 84 Others Domoria Bridge to Kapoor Chowk 21.78 20.79 IHR Associates A/br/2019/36 22/02/2019 1 0.00 0.00 0.00 20.79
365 A A4 33 ongoing cq mw br Laying RMC in Mohalla Fateh Garh. RMC4 Mohalla fategarh st.no.2 37.92 31.61 M/s Apex Developer A/br/2014/113 11/02/2014 3 100.00 30.63 3.58 28.03
366 A A4 33 ongoing cq nw br Laying RMC in Mohalla fathegarh Mata Sheran wali gali RMC4 Mohalla fathegarh Mata Sheran wali gali. 11.51 10.57 M/s Jagdambay Co-op Labour Society A/br/2014/126 04/03/2014 3 100.00 10.57 10.00 0.57
367 A A4 33 ongoing gq nw br Construction of Toilets in Park (Green Belt) on G.T road Opp Chand Cinema. Others G.T road Opp Chand Cinema. 2.69 2.47 The Rajowal Co-op. L/C Society Ltd. A/br/2016/203 11/03/2016 1 0.00 0.00 0.00 2.47
368 A A4 33 ongoing other nw br (I) Laying PCC M-20 in st.no.4,5,6 & links & links Mohalla Basant Nagar in w.no.33. (II) Laying PCC M-20 in street no.1,2,3 & links street Mohalla Jain Nagar. (PIDB works of Phase I-North) RMC4 (I) St.no.4,5,6 & links & links Mohalla Basant Nagar in w.no.33 (II) street no.1,2,3 & links street Mohalla Jain Nagar. 78.41 70.57 Friends & Co. A/br/2016/19 03/06/2016 3 40.00 7.53 16.09 54.48
369 A A4 33 ongoing other nw br Laying RMC in different streets of ward no. 33 (I) Laying PCC M-20 in street no.1,2 & links street Mohalla Basant Nagar in w.no.33. (II) Road in Fateh Garh Mohalla in ward no.33 (III) P/Laying RMC M-20 in Gandhi Nagar in ward no.33. (IV) Construction of RMC roads in Fatehgarh Mohalla (Part - II), (PIDB works of Phase II-North) RMC4 (I) Street no.1,2 & links street Mohalla Basant Nagar, (II) Road in Fateh Garh Mohalla in ward no.33, (III) Gandhi Nagar in ward no.33, (IV) Roads in Fatehgarh Mohalla (Part - II) 158.79 133.92 P P Enterprises A/br/2016/6 27/05/2016 4 85.00 28.94 80.11 53.81
370 A A4 33 ongoing other nw br Construction of RMC main streets & link streets in Sohan Singh Nagar in w.no.33 & Construction of RMC streets in Swami wali gali, Krishan gali, Tarsem Deput wali gali & opp. Baba Ghori in w.no.33. RMC4 Main streets & link streets in Sohan Singh Nagar in w.no.33 & Swami wali gali, Krishan gali, Tarsem Deput wali gali & opp. Baba Ghori in w.no.33. 54.31 44.00 Maa Chintpurni Construction A/br/2017/105 05/04/2017 3 15.00 5.67 0.00 44
371 A A4 33 ongoing cq nw br (I) Const. of RMC main streets & link streets in Sohan Singh Nagar in ward no.33. (II) Const. of RMC streets in Swami wali gali, Krishan Gali, Tarsem Deput wali gali & opp. Baba Ghori in ward no.33. RMC4 Sohan Singh Nagar, Swami wali gali, Krishan Gali, Tarsem Deput wali gali, Baba Ghori 54.31 44.00 Maa Chintapurni Construction A/br/2017/105 05/04/2017 3 0.00 0.00 0.00 44
372 A A4 33 ongoing cq nw br Laying RMC M-20 on various streets of Surinder Nagar in Ward No. 33. RMC4 Surinder Nagar in Ward No. 33. 61.54 41.26 Rajeh Kumar Sood A/br/2018/04 03/05/2018 4 100.00 29.50 0.00 41.26
373 A A4 34 ongoing cq nw br Laying 60mm I/T in street of Quilla Mohalla. RMC4 Streets of Qilla Mohalla 13.42 11.66 Inderjit Singh A/br/2013/91 09/12/2013 6 100.00 11.66 0.00 11.66
374 A A4 34 ongoing cq nw br Laying 80mm I/T in street of Dhai Marla Colony & S.D.P College Road. ILT80 Streets of Dhai Marla Colony SDP College Road 37.36 32.45 Inderjit Singh A/br/2013/91 09/12/2013 6 100.00 32.45 0.00 32.45
375 A A4 34 ongoing cq nw br Laying RMC backside Ved Bharati Ashram in Lakshmi Gali & Shankerpuri. RMC4 Ved Bharati Ashram in Lakshmi Gali & Shankerpuri. 29.75 24.26 M/s Tarwinder Pal Singh A/br/2015/166 31/08/2015 3 100.00 23.00 0.00 24.26
376 A A4 34 ongoing gq nw br P/L 60mm thick I/tiles in street of Subhash Nagar. ILT60 Subhash Nagar. 14.65 13.87 M/sThe Ghangas Co-op L/C Society Pvt . Ltd. A/br/2015/167 31/08/2015 2 100.00 0.00 0.00 13.87
377 A A4 34 ongoing other nw br P/Laying interlocking tiles in street in Ghati Gujran on Circular road in w.no.34. ILT60 Ghati Gujran on Circular road. 5.46 3.38 The Samrala Co-op L&C Society Ltd. A/br/2016/198 22/01/2016 1 100.00 4.38 3.39 -0.01
378 A A4 34 ongoing cq nw br P/F 80mm thick I/tiles in main road & links streets of Subash Nagar in w.no.34. ILT80 Subash Nagar in w.no.34. 28.53 24.63 The Dharour Co-op L&C Society Ltd. A/br/2016/37 23/06/2016 2 50.00 6.79 0.00 24.63
379 A A4 34 ongoing other nw br P/L dense bitumenous macadam 50mm to 75 mm and bitumenous concrete 30m to 45 mm from in streets of Ved Bharti Mandir to Shamshan Ghat Bhuda Nallah. (PIDB works of Phase II-Central) BMPC Streets of Ved Bharti Mandir to Shamshan Ghat Bhuda Nallah. 20.44 19.52 Dass Builders Pvt. Ltd. A/br/2016/39 24/06/2016 1 0.00 0.00 0.00 19.52
380 A A4 34 ongoing other nw br Laying RMC M-20 in Quilla Mohalla and Masjid Wallian Gallian in ward no.34 RMC4 Quilla Mohalla and Masjid Wallian Gallian in ward no.34 36.13 34.32 The Saharan Majra Co-op L/C Society Ltd. A/br/2016/80 01/11/2016 1 41.00 5.16 8.99 25.33
381 A A4 34 ongoing other nw br P/F sign board and speed bumps in w.no.34. Others Area of ward no.34. 7.00 6.38 The Samrala Co-op L&C Society Ltd. A/br/2016/91 29/12/2016 2 0.00 0.00 0.00 6.38
382 A A4 34 ongoing cq nw br Laying BM/PC on Old Shiv Puri Road from Ved Mandir Chowk upto Shiv Puri Bridge in Zone-A BMPC Ved Mandir Chowk upto Shiv Puri Bridge in Zone-A 61.94 59.47 NKC Constructions Private Limited A/br/2018/01 03/05/2018 3 50.00 24.30 0.00 59.47
383 A AG A_General ongoing gq nw br Closing of cuts in central verge on Old Rahon road,Jail road (ward no.22,36 & 39) PCC Old Rahon road,Jail road 3.36 3.33 M/s Teg Builders A/br/2014/100 06/01/2014 2 100.00 2.65 0.00 3.33
384 A AG A_General ongoing gq nw br Road marking with thermo plastic in Chaura Bazaar,Town Hall & other road near by clock tower (ward no.35). Others Near MC main office Zone-A 4.99 3.44 M/s Ravinder Takker A/br/2014/112 11/02/2014 1 100.00 2.92 0.00 3.44
385 A AG A_General ongoing gq nw br Repair of toilet sets in area of sub zone A2 Buildings Area of Sub zone A2 3.90 3.86 M/s Grover Enterprices A/br/2014/116 11/02/2014 2 100.00 3.75 3.75 0.11
386 A AG A_General ongoing gq nw br Near Chand Cinema bridge (ward no.24 & 33) BMPC Chand Cinema bridge 77.21 62.34 M/s Narinder Kumar & Co. A/br/2012/9 15/05/2012 4 100.00 62.34 0.00 62.34
387 A AG A_General ongoing gq mw br Maintenance Work Sub Zone A-3. Ward no.2,3&4 Others Ward No.2,3&4 18.36 15.65 M/S Samridi Constructions A/br/2014/115 11/02/2014 6 100.00 16.00 10.90 4.75
388 A AG A_General ongoing cq nw br Laying BM & PC in Daulat Colony (ward-19) BMPC Daulat Colony (ward-19) 6.00 5.88 M/s Ganesh Construction A/br/2013/74 13/03/2013 2 100.00 6.09 0.00 5.88
389 A AG A_General ongoing gq nw br Const. of Suvidha Centre & Sub Zonal Office in Zone-A. Buildings Daresi Ground & Chand Cinema Disposal site. 78.32 76.25 M/s Asis Builders A/br/2013/78 18/09/2013 3 100.00 70.72 32.56 43.69
390 A AG A_General ongoing cq nw br Restoration of sewer trenches and const. of main Quilla Mohalla road by Laying RMC M-20 in W-34 RMC4 Main Quilla Mohalla Road 32.75 26.09 Ashok Kumar Sobti A/br/2013/77 14/08/2013 3 100.00 27.78 27.78 -1.69
391 A AG A_General ongoing gq nw br Remodeling of storm water channel starting from Gurudwara Dukhniwarn to Dhokan Mohalla junction with open nallah coming from Shingaar Cinema disposal side. Others Gurudwara Dukhniwarn to Dhokan Mohalla 2132.00 2177.00 M/s Kabir Infra Pvt. Ltd. A/br/2011/221 04/02/2011 18 99.00 55.43 2174.00 3
392 A AG A_General ongoing gq nw br P/F cautionary, mandatory & Informatory sign boards on roads in Zone-A (Short Term Traffic Measure). Others Elevated road 4.48 4.25 M/s Doraha Co-op L&C A/br/2014/132 01/09/2014 2 100.00 4.67 4.67 -0.42
393 A AG A_General ongoing gq nw br P/F M.S blinds on Elevated road (Damaged portion). Others Elevated road 0.96 1.06 M/s Gurvinder Singh A/br/2014/137 03/12/2014 1 100.00 1.06 0.00 1.06
394 A AG A_General ongoing cq mw br Repair and maintenance of work of various wards of Zone-A. Others All Sub Zones of Zone-A 47.97 59.96 M/s Rai Constuction A/br/2013/75/EE/A 06/06/2013 6 100.00 60.20 52.60 7.36
395 A AG A_General ongoing gq mw br Maintenance work in Different Areas falling in ward No.25&34. Others - 12.41 12.24 The Rania Co.op L/C Society A/br/2015/145/G-33 30/04/2015 6 100.00 9.65 11.78 0.46
396 A AG A_General ongoing gq nw br Const. of unified citizen service delivery centre SEW Kendra Type-II at various place in the M.C>, Ludhiana Buildings Zone-A 42.57 41.71 Asis Builders A/br/2015/138 27/01/2015 2 35.00 6.16 0.00 41.71
397 A AG A_General ongoing gq nw br Const. of Bridge on Rahon Road (Sunder Nagar) Others Zone-A 147.54 146.96 Asis Builders A/br/2010/18 06/12/2010 12 100.00 37.66 76.00 70.96
398 A AG A_General ongoing cq mw br Maintenance work in different area falling in ward no.38 & 39 of Sub Zone-A2. Others Ward no.38 & 39 11.57 11.37 M/sThe Rajowal Co-op L/C Society Ltd. A/br/2015/146 30/04/2015 6 100.00 11.37 0.00 11.37
399 A AG A_General ongoing other nw br Internal furnishing ofCitizen Service Centre Others (i) near bsup Flats dhandari (II) Gyaspura 10.34 10.13 The Rajowal co-op L/C Society LTD A/br/2015/133/G-33 09/06/2015 1 70.00 5.30 0.00 10.13
400 A AG A_General ongoing other nw br Internal furnishing of existed construction Unified Citizen Service Delivery Centre (Sewa Kendra Type-II). Others Dholewal Chowk 5.17 4.98 The Rajowal Co-op L&C Society Ltd. A/br/2015/130 08/05/2015 1 75.00 3.09 2.45 2.53
401 A AG A_General ongoing cq nw br Internal furnishing of existed construction Unified Citizen Service Delivery Centre (Sewa Kendra Type-II) Others Zone-B back side of Shinghar Cinema. 5.17 5.06 The Rajowal Co-op L&C Society Ltd. A/br/2015/15 08/05/2015 1 100.00 1.67 1.67 3.39
402 A AG A_General ongoing cq nw br Internal furnishing of Citizen Service Centre Others Zone-A 10.34 9.68 M/s The Samrala Co-op L/C Society Ltd. A/br/2015/149 12/06/2015 1 100.00 9.49 3.82 5.86
403 A AG A_General ongoing other mw br Execution of maintenance work in different area falling in ward no.22,23 & 35. Others Ward no.22,23 & 35. 18.15 15.30 M/s Asis Builders A/br/2015/141 05/03/2015 6 100.00 15.29 0.00 15.3
404 A AG A_General ongoing cq mw br Execution of maintenance works in different areas falling in ward no.24,32 & 33. Others Ward no.24,32 & 33. 17.26 14.99 M/s Inderjit Singh A/br/2015/143 18/03/2015 6 100.00 16.48 0.00 14.99
405 A AG A_General ongoing cq mw br Execution of Maintenance work in different area falling w.no.19 & 21. (Revised ) Vide CC order dt.02-11-2017 ) Others Ward no.19 & 21. 14.97 14.68 The Raina Co-op L&C Society Ltd. A/br/2015/142 05/03/2015 6 100.00 1.44 10.61 4.07
406 A AG A_General ongoing gq nw br Laying 30mm thick SDBC on Jail road and old Hospital road w.no.36,39 SDBC Jail road and old Hospital road w.no.36,39 81.64 62.01 C.H Builder PVT.LTD A/br/2015/157 31/08/2015 6 100.00 25.15 43.08 18.93
407 A AG A_General ongoing gq nw br Laying 30mm thick SDBC on Baba Than Singh chowk to Kalgidhar road in Brown road in ward no.38 & 39. SDBC Baba Than Singh chowk to Kalgidhar road in Brown road in ward no.38 & 39. 71.85 54.78 M/s C.H Builders Pvt.Ltd. A/br/2015/177 24/09/2015 5 0.00 0.00 0.00 54.78
408 A AG A_General ongoing gq nw br P/F PVC coated chain link wire mesh fencing along Budha Nallah. Others Along Budha Nallah. 15.22 14.60 M/s Teg Builders A/br/2015/150 07/08/2015 2 100.00 15.20 11.50 3.1
409 A AG A_General ongoing gq mw br Maintenance work of Circular area/roads around Multi storeyed Parking Complex. Others Circular area/roads. 2.94 2.61 M/s The Rajowal Co-op L/C Society Ltd. Pvt. A/br/2015/152 07/08/2015 1 100.00 2.61 0.00 2.61
410 A AG A_General ongoing gq nw br Shifting & Change of Direction of Statue of Bharat Ratan Sahib Dr. B.R.Amedkar Creater of Indian. Others Near Jalandhar Bye Pass. 2.75 2.91 M/s Rai Constructions A/br/2015/153 07/08/2015 2 100.00 2.84 0.00 2.91
411 A AG A_General ongoing gq nw br P/L road marking with therma plastic paint & painting of crash barrier at jagraon bridge on Budha Nallah. Others Jagraon Bridge on Budha Nallah. 22.50 21.19 M/s The National Co-op L/C society Ltd. Pvt. A/br/2015/163 31/08/2015 2 100.00 3.55 16.54 4.65
412 A AG A_General ongoing gq nw br Special repair & renovation of fountain falling in w. no. 24,25,32,33&34 Others Area of Sub Zone-A4. 21.24 19.21 M/s doraha Co-op L/C Society Ltd. Pvt. A/br/2015/165 31/08/2015 3 0.00 0.00 0.00 19.21
413 A AG A_General ongoing gq nw br Rejuvenation of Old Rahon road from Budha Nallah to G.T road Bye Pass (Basti chowk to Balmik Ghati) Est.cost: Rs.129.73 lacs & Rejuvenation of road from Phamran road up to Bapu Inder Singh road Grewal road in ward no.2 Est. cost:Rs.46.46 lacs. Others Old Rahon road from Budha Nallah to G.T road Bye Pass (Basti chowk to Balmik Ghati & Phamran road up to Bapu Inder Singh road Grewal road in ward no.2. 176.19 141.48 M/s J.K. Infocon A/br/2015/171 23/09/2015 3 100.00 0.00 0.00 141.48
414 A AG A_General ongoing gq nw br Rejuvenation of Master Tara Singh chowk to Jalandhar Bye Pass via Shiv Puri road. Est. cost: Rs.104.36 lacs & Rejuvenation of Chaura Bazar road. Est. cost:Rs.65.02 lacs. Others Master Tara Singh chowk to Jalandhar Bye Pass via Shiv Puri road & Chaura Bazar . 169.38 142.26 M/s J.K. Infocon A/br/2015/172 23/09/2015 3 100.00 11.53 95.71 46.55
415 A AG A_General ongoing gq nw br Rejuvenation of road from Railway line to Old G.T road. Est. cost Rs.:29.65 lacs & Rejuvenation of road from Old G.T road to Shiv Puri road adjoining Budha Nallah.Est. cost: Rs.97.60 lacs. Others From Railway line to Old G.T road & Old G.T road to Shiv Puri road adjoining Budha Nallah. 127.25 107.52 M/s I.H.R. Associates, A/br/2015/174 24/09/2015 3 100.00 45.09 65.44 42.08
416 A AG A_General ongoing gq nw br Rejuvenation of Old G.T road (Jagroan Bridge to Ambedkar chowk). Others Old G.T road (Jagroan Bridge to Ambedkar chowk). 426.42 336.78 M/s Narinder Kumar and Company A/br/2015/176 24/09/2015 5 95.00 41.70 237.50 99.28
417 A AG A_General ongoing gq mw br Maintenance work of green belt/park on G.T Road in ward no.32. Others G.T Road in ward no.32. 4.82 4.28 M/s The Rajowal Co-op L/C Society Ltd. Pvt. A/br/2015/182 16/10/2015 2 100.00 4.81 0.00 4.28
418 A AG A_General ongoing gq mw br Maintenance of Area of Ward No.1&26 in Sub Zone - A3 Others In the Area of Ward No.1&26 12.08 10.35 M/S Maa Chintpurni Construction A/br/2015/183 16/10/2015 6 100.00 10.28 3.76 6.59
419 A AG A_General ongoing gq nw br Laying RMC M-20 in street of Mohalla Field Ganj Kutcha no.8 to 12 (With maintenance of 5 years) R-RMC Field Ganj Kutcha no.8 to 12 69.25 66.08 M/s Gupta Contractor Pvt. Ltd. A/br/2015/184 16/10/2015 5 100.00 26.18 55.92 10.16
420 A AG A_General ongoing gq mw br Maintenance work sub zone A-2 W.no. 36, 37 & 20. Others A-2 W.no. 36, 37 & 20. 16.51 16.01 Rajowal Cooperative L&C Society LTD A/br/2015/154 21/08/2015 6 100.00 16.01 4.36 11.65
421 A AG A_General ongoing cq nw br Laying RMC M10 ion street of Mohalla Field Ganj KutchaNo. 13 to 16 and linksB/S street No. 8 to Mittar Sabha Janj Ghar. RMC4 zone -A 66.82 57.46 M/s. Neeraj A/br/2015/178 24/09/2015 5 40.00 28.91 0.00 57.46
422 A AG A_General ongoing gq nw br Construction of Bridge on Budha Nallah Near Chand Cinema at Ludhiana. Others Near Chand Cinema Road. 150.00 136.20 IMS Engineers & Builders A/br/2010/178 03/12/2010 6 100.00 132.01 132.01 4.19
423 A AG A_General ongoing cq nw br Maintenance work of Green Belt/park on GT Road ward 32 Parks GT Road 4.82 4.28 The Rajowal Co-op L/C Society Ltd A/br/2015/182/G-33 16/10/2015 2 100.00 4.81 3.73 0.55
424 A AG A_General ongoing gq nw br Renovation of Room no.66 in Zone-A Mata Rani Chowk. Others Room no.66 in Zone-A Mata Rani Chowk. 1.98 1.66 The Saharan Majra Co-op L/C Society Ltd. A/br/2016/204 22/03/2016 2 100.00 1.44 0.00 1.66
425 A AG A_General ongoing mlaq nw br Rejuvenation of Main Bahadurke Road & Construction of Phamran road from Grewal Kothi to Noorwala Road Via. Govt. High School in Ward No. 1&2. Others Bhadurke Road & Phamran Road. 186.51 145.79 M/s J.K Infocon Pvt. Ltd. A/br/2015/175 24/09/2015 3 100.00 134.12 0.00 145.79
426 A AG A_General ongoing cq nw br Laying 30mm (av) thick SDBC on Brown Road from Kalghidhar Road to Fire Brigade Old G.T Road ward no.36,37 & 39. SDBC Brown Road from Kalghidhar Road to Fire Brigade Old G.T Road ward no.36,37 & 39. 33.18 26.08 M/s Dass Builders Pvt. Ltd. A/br/2015/180 16/10/2015 3 100.00 27.46 0.00 26.08
427 A AG A_General ongoing cq nw br Const. of RMC Road in Kirpal Nagar st.no.7 and link street in ward no.19. RMC4 Kirpal Nagar st.no.7 and link street in ward no.19. 20.37 18.33 M/s Ashok Kumar Sobti A/br/2016/64 23/08/2016 2 100.00 18.33 0.00 18.33
428 A AG A_General ongoing cq nw br Const. of RMC Road in New Madho Puri st.no.9 and link streets of Prem Nagar main road in ward no.19. RMC4 New Madho Puri st.no.9 and link streets of Prem Nagar main road in ward no.19. 30.40 28.88 M/s Ashok Kumar Sobti A/br/2016/63 23/08/2016 2 75.00 18.76 0.00 28.88
429 A AG A_General ongoing gq nw br Arrangement for toilets near Railway Station and Lakkar Bridge and Construction of Urinal set on G.T Road near Railway Station. Others Near Railway Station and Lakkar Bridge & G.T Road near Railway Station. 9.05 8.14 Singh Infracon A/br/2016/49 14/07/2016 1 100.00 1.70 0.00 8.14
430 A AG A_General ongoing gq nw br Renovation of foundation and Water Body in Multi StoryCar Parking in Zone-A near Mata Rani Chowk. Others Multi Story Car Parking in Zone-A near Mata Rani Chowk. 14.90 13.88 The National Co-op L&C Society Ltd. A/br/2016/31 09/06/2016 1 60.00 1.17 1.64 12.24
431 A AG A_General ongoing gq nw br Construction of Lavatory set opp. Railway Station behind Local Adda. Others Railway Station behind Local Adda. 22.01 20.13 Smridhi Construction A/br/2016/32 17/06/2016 2 90.00 14.45 0.00 20.13
432 A AG A_General ongoing gq nw br Repair & Renovation of Multi Level Parking Complex in Mata Rani Chowk. Buildings Near Mata Rani Chowk. 27.70 25.33 The Rania Co-op L&C Society Ltd. A/br/2016/33 17/06/2016 2 0.00 0.00 0.00 25.33
433 A AG A_General ongoing other nw br P/F RCC Grills Central verge from Ambedkar Chowk to Budha Nallah. Others From Ambedkar Chowk to Budha Nallah. 19.27 18.10 The Rajowal Co-op L&C Society Ltd. A/br/2016/35 21/06/2016 2 100.00 2.45 18.05 0.050000000000001
434 A AG A_General ongoing gq nw br Beautification of Entry Points (Jalandhar-By-Pass) to the city of Ludhiana. Others Near Jalandhar Bye Pass 103.51 101.85 Asis Builders A/br/2016/42 24/06/2016 3 95.00 0.00 0.00 101.85
435 A AG A_General ongoing gq nw br P/f road furniture on main road of Zone-A, C and D. (i. Painting of crash barrier, providing cats eye and other road furniture at Elevated Road), (ii. P/f Delinators on link road from Samrala Chowk to Bharat Nagar Chowk and Gill Road from Vishwakarma Chowk upto M.C. Limit) (iii. P/L road furniture and road marking lines from session chowk to Dandi Swami Chowk via Cemetery road) Others (i.At Elevated Road), (ii.Samrala Chowk to Bharat Nagar Chowk and Gill Road from Vishwakarma Chowk upto M.C. Limit) & (iii.session chowk to Dandi Swami Chowk via Cemetery road)) 65.11 43.40 M/s Dhingra Brothers India A/br/2016/78 07/10/2016 2 90.00 12.08 14.91 28.49
436 A AG A_General ongoing gq nw br Const. of Lavatory set near MCL Zone-A Others Const. of Lavatory set near MCL Zone-A 15.34 13.80 M/s Singh Infracon A/br/2016/52/EEA 14/07/2016 3 85.00 4.78 1.01 12.79
437 A AG A_General ongoing gq nw br Laying RMC & interlocking tiles on streets of main road and Faouji Mohalla, Abdullapur Basti & other streets (Ward No. 46) (PIDB-1) ILT60 Ward No. 46. 76.46 73.01 M/s S.K Construction Co. A/br/2016/19/EED 04/05/2016 4 80.00 20.72 22.80 50.21
438 A AG A_General ongoing other nw br Laying 30mm thick SDBC on road from C.M.C Chowk to Khud Mohalla (Sikandri Road ) From khud Mohalla Chowk to PNB Bank (Old Civil Hospital Road) W.no. 37 (PIDB work Phase-I Central) SDBC (i) from C.M.C Chowk to Khud Mohalla (Sikandri Road ) From khud Mohalla Chowk to PNB Bank (Old Civil Hospital Road) W.no. 37 40.21 38.40 C.H Builders Pvt. Ltd. A/br/2016/226 03/05/2016 3 29.00 10.96 0.00 38.4
439 A AG A_General ongoing other nw br (i) Laying 60mm thick interlocking tilels in street of Dharampura Mohalla in ward no.38.(14.13), (ii) Providing and Fixing 60mm thick Interlocking in streets of Kot Alamger Kucha Inayat W-39(39.23). (PIDB work Phase-I Central) ILT60 (i) Dharampura Mohalla in ward no.38. (ii) Kot Alamger Kucha Inayat W-39. 52.60 51.66 M/s Durga Construction Co. A/br/2016/54 18/07/2016 2 82.00 43.09 18.40 33.26
440 A AG A_General ongoing other nw br Construction of road by laying SDBC in MIG Colony W No.10 (28.43) and Construction of streets by laying SDBC in Sukhdev Nagar W No.10 (12.17 ) and Construction of streets by laying SDBC in New Sukhdev Nagar W No.10 (14.80) SDBC W No.10 55.40 52.91 M/s VKBS Const. Co. A/br/2016/63 04/05/2016 3 85.00 26.49 10.61 42.3
441 A AG A_General ongoing other nw br (I) Laying RMC in Mohalla Laxmi Puri and Aman Nagar, (II) Laying RMC M-20 in Baura Colony near Amar Nagar, Netaji Nagar and New Kartar Nagar. (PIDB works of Phase I-North) RMC4 (I) Mohalla Laxmi Puri and Aman Nagar, (II) Baura Colony near Amar Nagar, Netaji Nagar and New Kartar Nagar 76.60 68.94 S.K Const. Co. A/br/2016/18 03/06/2016 4 80.00 33.13 18.67 50.27
442 A AG A_General ongoing other nw br Laying PCC Flooring in streets of Quilla Mohalla, Veer Nagar and SDP College road W-34 (PIDB works of Phase I-Central) PCC Quilla Mohalla Veer nagar and SDP College road W-34. 48.20 48.17 M/s Ashok Kumar Sobti A/br/2016/61 10/08/2016 2 90.00 43.45 37.70 10.47
443 A AG A_General ongoing other nw br Providing & Laying 60mm thick Interlocking Tiles in Streets of Mohalla Shamsher Nagar. (PIDB Works of Phase-I North) ILT60 Mohalla Shamsher Nagar. 34.02 32.83 Jagdambay Co-op L/C Society Ltd. A/br/2016/234 10/05/2016 2 70.00 21.75 0.00 32.83
444 A AG A_General ongoing other nw br Providing & Fixing 80mm thick Interlocking Tiles in Streets of Mohalla Jaspal Colony (PIDB Work of Phase-III East) ILT80 Mohalla Jaspal Colony 85.00 72.16 Sham Sunder Singla A/br/2016/73 29/09/2016 3 85.00 41.95 9.60 62.56
445 A AG A_General ongoing other nw br Construction of Boundary wall along Railway limit near Lakkar Bridge M.C. Ludhiana. Others Railway limit near Lakkar Bridge M.C. Ludhiana. 13.26 13.25 The Samrala Co-op L&C Society Ltd. A/br/2016/86 08/12/2016 1 100.00 13.26 6.08 7.17
446 A AG A_General ongoing other nw br Repair of Existing Buildings, Improvements and development of Area behind Multi Storey Parking in Zone-A. Others Area behind Multi Storey Parking in Zone-A. 14.62 13.33 M/s Durga Construction Company A/br/2016/87 08/12/2016 1 100.00 3.11 11.78 1.55
447 A AG A_General ongoing gq nw br Laying RMC M-20 in streets of Mohalla Harbanspura in ward no.38. RMC4 Mohalla Harbanspura 70.86 65.27 Ashok Kumar Sobti A/br/2016/84 08/12/2016 3 95.00 67.49 37.82 27.45
448 A AG A_General ongoing other nw br Construction of filth depot near Old Jali Back side CMC Dental College Others near Old Jali Back side CMC Dental College 8.99 8.54 The Sutlej Co-op L&C Society Ltd. A/br/2016/84 08/12/2016 1 0.00 0.00 0.00 8.54
449 A AG A_General ongoing cq nw br Laying RMC in different streets of W.No. 27 (Bawa Colony)(PIDB) RMC4 Zone-A 46.62 39.35 Naresh Kumar A/br/2016/93 29/09/2016 2 28.00 3.36 7.25 32.1
450 A AG A_General ongoing cq nw br Provision of S/L arrangement in Gehlewal Main Road and Gehlewal Industries W.No.4 Others Zone-A 8.76 6.33 Manmohan Singh A/br/2016/26 20/10/2016 2 40.00 3.07 0.00 6.33
451 A AG A_General ongoing cq nw br Construction of RMC Road in Dhai Marla Colony & Shankar Puri in ward no.34. RMC4 Dhai Marla Colony & Shankar Puri 46.96 44.61 M/s Ashok Kumar Sobti A/br/2016/85 08/12/2016 3 100.00 44.61 0.00 44.61
452 A AG A_General ongoing other nw br Lowering Bed of Nallah Under G.T Road near Mata Rani Chowk. Others G.T Road near Mata Rani Chowk. 18.20 17.19 The Sutlej Co-op L&C Society Ltd. A/br/2017/109 13/06/2017 2 100.00 14.86 0.00 17.19
453 A AG A_General ongoing cq nw br Laying RMC-20 in streets of patiya vali gali katchi gali between chaura bazaar etc. Ward no-35 RMC4 Laying RMC-20 in streets of patiya vali gali katchi gali between chaura bazaar etc. Ward no-35 91.80 89.69 Navyug Company A/br/2017/107/EEA 10/04/2017 4 23.00 21.86 0.00 89.69
454 A AG A_General ongoing gq nw br Laying RMC M20 in Street of Mohalla Ram Nagar in Ward No-39. RMC4 Mohalla Ram Nagar 52.77 38.49 ASHOK KUMAR SOBTI A/br/2017/131/EEA 07/12/2017 5 55.00 27.29 0.00 38.49
455 A AG A_General ongoing other nw br Construction of mettaled road at B.S.U.P Flats of Mundian Kalan Site. Others Mundian Kalan Site. 40.57 38.54 M/s S.K. Construction Company A/br/2018/172 30/01/2018 2 0.00 0.00 0.00 38.54
456 A AG A_General ongoing other nw br P/fixing 60mm thick I/tiles at Passage Around Flats in Mundian Kalan under BSUP Project (JNNURM SCHEME). Others Mundian Kalan under BSUP Project (JNNURM SCHEME). 42.35 32.99 M/s Gupta Engineers & Builders A/br/2018/173 30/01/2018 2 0.00 0.00 0.00 32.99
457 A AG A_General ongoing other nw br Widening of 70 feet Central Road on Both sides in Sunder Nagar Road. Others On Both sides in Sunder Nagar Road. 16.92 13.50 Apex Developers A/br/2018/176 24/04/2018 2 100.00 3.95 9.23 4.27
458 A AG A_General ongoing other nw br Painting on Central Verge & Crash Barrier of Elevated Road. Others Elevated Road. 5.71 4.76 The Jagraon Co-op L&C Society Ltd. A/br/2018/3 03/05/2018 2 100.00 4.13 0.00 4.76
459 A AG A_General ongoing gq nw br Construction of Addl. M/Hole Chambers & Raising of RCC Slabs of M/Holes in Ward No. 02, 03, 04, 05, Ludhiana. Sewage Ward No. 02, 03, 04 & 05 19.30 16.58 The Mohi Co-op. L&C Society Ltd., Ludhiana. A/br/2019/70/G-33 18/01/2019 3 0.00 0.00 0.00 16.58