Ludhiana Municipal Corporation
Works Management System

Works Grid   |   Login   



List of Work Orders

Status = ongoing, Department = br, Level = zone (B)

Excel Export
S No. Zone S Z W Status Head Cat Dep Work Name Work Type Work Location E Cost
(in lacs)
T Cost
(in lacs)
Agency Work Order Date T Limit
(in months)
Phys Prog
(in %)
Bill Prep
(in lacs)
Paid
(in lacs)
Liab
(in lacs)
1 B B1 17 ongoing mlaq nw br Laying BM PC on Kabir Road,Ludhiana BMPC Kabir Road 37.54 33.40 Kabir Const.Co. B/br/2011/21 03/06/2011 5 100.00 33.40 33.40 0
2 B B1 17 ongoing cq nw br Strengthening and Reconditioning of Various Streets adjoining Moti Nagar BMPC Adjoining Moti Nagar 51.39 43.63 Kabir Const.Co B/br/2011/22 03/06/2011 3 100.00 43.63 43.63 0
3 B B1 17 ongoing cq nw br Lying BM&PC in Transport Nagar,Ludhiana BMPC Transport Nagar 31.11 30.71 Dass builders B/br/2009/173 18/02/2009 2 100.00 30.50 30.50 0.21
4 B B1 17 ongoing cq nw br Laying PCC in streets Near York Hosiery Ind Area A extension PCC Near York Hosiery Ind Area A extension 42.02 30.60 T & G Const. Co. B/br/2011/196 12/12/2011 3 100.00 30.60 30.60 0
5 B B1 17 ongoing cq nw br Repair and Maintenace of Ambedkar Colony Ghora Road,Ludhiana. Others Ambedkar Colony Ghora Road 27.47 23.08 Asis Builders B/br/2011/80 12/07/2011 6 100.00 9.45 7.84 15.24
6 B B1 17 ongoing cq nw br Const. of RCC road with RMC M-30 from Ghora road to Transport nagar W-17 RMC6 Ghora road to Transport nagar 42.39 36.55 Ashok Kumar Sobti B/br/2014/31 28/01/2014 3 100.00 29.60 0.00 36.55
7 B B1 17 ongoing gq nw br P/F Sign Boards in Various Streets of Ward No.17. Others Various Streets of Ward No.17. 2.99 1.52 Aglow Builders B/br/2014/48 12/02/2014 2 100.00 1.40 0.00 1.52
8 B B1 17 ongoing cq nw br Const of streets with RMC M-30 on BM Kapoor Road RMC6 BM Kapoor Road 62.88 53.52 Rajesh Kumar Sood B/br/2013/12 04/12/2013 6 100.00 47.60 0.00 53.52
9 B B1 17 ongoing cq nw br Developement of park of Arun Gas park & Rita Sewing Machine Parks Near Cheema Chowk 16.37 13.10 Rajesh Kumar Sood B/br/2008/29 05/05/2008 4 100.00 0.00 0.00 13.1
10 B B1 17 ongoing cq nw br Laying RMC (M-20) Streets of Mohalla Ambedkar Colony W No.17 RMC4 Mohalla Ambedkar Colony 1.98 1.95 Rajjowal Co-Op L/C Society Ltd. B/br/2015/40 21/10/2015 1 100.00 1.96 0.00 1.95
11 B B1 17 ongoing cq nw br Laying 60mm thick Interlocking Tiles/paver blocks of M-35grade in street No.1 of Mohalla Dharampura near Ice Factory of W-40 ILT60 Mohalla Dharampura 3.86 3.13 The Samrala Co-Op L/C Society B/br/2016/64 02/06/2016 1 100.00 2.87 0.00 3.13
12 B B1 17 ongoing other nw br Const. of RCC Road by laying RMC (M-30) on main road of Janakpuri W No.17, 40 & 41 RMC6 Main road of Janakpuri 199.14 176.04 M/s Kabir Infra Pvt. Ltd. B/br/2016/81 04/05/2016 4 80.00 63.96 70.58 105.46
13 B B1 17 ongoing other nw br Construction of metalled roads in various streets of W No.17 (176.85 Lacs) Const. of Road by laying BM & SDBC on links between Gupta road & Janakpuri road W. No.17 (47.12) and Const. of Road by laying BM & SDBC from Dholewal flyover upto Textile colony on Kabir road W. No.17(49.96) and Const. of Road by laying BM & SDBC from Link road upto Zoom Hotel on Ghora road W. No.17 (79.77) SDBC W No.17 176.85 168.89 M/s Shiva Constructions B/br/2016/101 27/05/2016 5 90.00 0.00 0.00 168.89
14 B B1 17 ongoing other nw br Laying 60mm thick Interlocking Tiles/paver blocks of M-35grade in streets of Mohalla Vijay Nagar of W-17 ILT60 Vijay Nagar 46.14 40.33 M/s J.P Builders B/br/2016/102 27/05/2016 2 90.00 0.00 0.00 40.33
15 B B1 17 ongoing other nw br Laying RMC in different streets of W No.17 (177.82 Lacs) Const. of RCC Road by laying RMC (M-30) on Mariya Steel road in Industry area extension W No.17(93.91) and Const. of RCC Road by laying RMC (M-30) from Ghora road to Transport Nagar W No.17 (83.91) RMC4 W No.17 177.82 150.17 M/s Asis Builders B/br/2016/100 27/05/2016 5 85.00 9.97 128.94 21.23
16 B B1 17 ongoing gq nw br Const. of RCC Road by laying RMC (M-30) From Kabir road to Pearl Hosiery ( Textile Colony) W No.17 RMC6 W No.17 41.21 42.65 M/s Navyug co. B/br/2016/239 20/12/2016 2 100.00 30.88 0.00 42.65
17 B B1 18 ongoing cq mw br Laying PC 20mm Thick in Streets of Harchran Nagar, Ludhiana BMPC Streets of Harchran Nagar 6.15 5.74 Sunil Kumar B/br/2011/147 27/07/2011 1 100.00 5.74 5.74 0
18 B B1 18 ongoing mlaq nw br Reconstruction &Widining of pulley Near Shamshan Ghat (50%) Others Near Shamshan Ghat 61.40 55.88 Durga Const.Co. B/br/2010/24 22/02/2010 5 100.00 55.88 52.88 3
19 B B1 18 ongoing mlaq nw br Reconstruction&Widining of Pulley Near Shamshan Ghat(50%) Others Near Shamshan Ghat 61.40 55.58 Samridhi Const.Co. B/br/2010/25 22/02/2010 5 100.00 55.58 52.58 3
20 B B1 18 ongoing cq nw br Const of missing walls of nallah in Shiva ji Nagar Others Shiva ji Nagar 10.71 8.83 Durga Const. Co. B/br/2013/20 16/12/2013 6 100.00 5.63 0.00 8.83
21 B B1 18 ongoing cq nw br Laying 4" thick RMC M20 in street no. 1 to 4 & links of Moh Harcharan Nagar RMC4 HARCHARAN NAGAR 60.45 50.44 Manmohan Singh B/br/2014/27 28/01/2014 4 100.00 35.67 0.00 50.44
22 B B1 18 ongoing cq nw br Laying 80mm thick Interlocking tiles in Shiva ji Nagar ILT80 Shiva Ji Nagar 17.78 14.21 Durga Const. Co. B/br/2013/18 16/12/2013 6 100.00 8.00 0.00 14.21
23 B B1 18 ongoing cq nw br P/F Rubber Speed Breaker for W-18 Others W-18 4.57 3.11 Aglow Builders (50%) B/br/2014/2 29/05/2014 1 100.00 1.59 1.08 2.03
24 B B1 18 ongoing cq nw br P/F Rubber Speed Breaker for W-18 Others W-18 4.57 3.11 Ganesh Traders (50%) B/br/2014/3 29/06/2014 1 40.00 0.45 0.00 3.11
25 B B1 18 ongoing cq nw br Const. of streets with RMC M-20 in st no.5, Haracharan Nagar RMC4 Harcharan Nagar 35.21 29.98 Rajesh Kumar Sood B/br/2013/12 04/12/2013 6 100.00 24.28 0.00 29.98
26 B B1 18 ongoing cq nw br Const. of Toilet Block in Shigar Cinema Road Presher Park Others Shingar Cinema Road 1.86 1.48 Durga Const. Co. B/br/2013/18 16/12/2013 6 30.00 0.00 0.00 1.48
27 B B1 18 ongoing cq nw br Covering of side drain in Shiva Ji Nagar with P/F I/Tiles 80mm ILT80 Shiva Ji Nagar 33.54 28.36 Durga Const. Co. B/br/2013/20 16/12/2013 6 100.00 29.30 0.00 28.36
28 B B1 18 ongoing cq nw br P/F Direction Boards in various streets of W-18 Others Sub Zone B1 2.24 1.36 Aglow Builders B/br/2014/1 29/05/2014 1 100.00 0.00 0.00 1.36
29 B B1 18 ongoing cq nw br Repair & maintenance works of various areas of W No.18 in Sub Zone B1 Others W No.18 4.75 4.15 The Samral Co-Op L/C Society Ltd. B/br/2015/35 08/10/2015 1 100.00 4.14 3.60 0.55
30 B B1 18 ongoing cq nw br Construction of central verge from GT road upto Prashar Park on chimney road. Others GT road upto Prasher park 4.04 3.33 The Satluj Co-Op Labour & construction society Ltd. Ludhiana B/br/2015/46 29/12/2015 1 100.00 2.93 0.00 3.33
31 B B1 18 ongoing other nw br Laying 80mm thick Interlocking Tiles/paver blocks of M-40 grade in streets of Mohalla Shiva ji Nagar in W No.18 ILT80 Shiva ji Nagar 55.32 50.45 M/s Durga Const. Co. B/br/2016/27 22/04/2016 3 95.00 0.00 0.00 50.45
32 B B1 18 ongoing other nw br Laying RMC in streets of Mohalla Ranjit Singh Park in W No.18 RMC4 Ranjit Singh Park 44.66 40.19 M/s T&G Const. Co. B/br/2016/96 27/05/2016 3 95.00 0.00 0.00 40.19
33 B B1 18 ongoing other nw br Providing & Laying 60mm thick Interlocking Tiles/paver blocks of M-35 grade on both sides of Kashmir Nagar main road W-18 ILT60 Kashmir Nagar 46.37 39.94 M/s Apex Developers B/br/2016/28 22/04/2016 3 80.00 8.09 22.60 17.34
34 B B1 18 ongoing other nw br laying RMC( M-20) in streets of Mohalla Shiva Ji Nagar W No.18 (41.73) and Laying RMC in streets of Mohalla Narinder Nagar in W No.18 (18.30) RMC4 Shiva ji Nagar 60.03 51.93 M/s J.P Builders B/br/2016/162 02/06/2016 3 80.00 3.69 35.77 16.16
35 B B1 18 ongoing mlaq nw br Const of metaled road in various streets of ward no. 18 SDBC Const of metaled road in various streets of ward no. 18 182.66 174.44 M/s Kabir Infra Pvt. Ltd. B/br/2016/103/EEB 27/05/2016 5 77.00 17.86 114.27 60.17
36 B B1 18 ongoing gq nw br Const. of Senior citizen home & renovation of park adjoining Zone B Building W No.18 Buildings Zone B 20.73 18.66 Sh Varinder Singh B/br/2016/193 12/08/2016 4 40.00 7.41 0.00 18.66
37 B B1 40 ongoing cq nw br Laying 80mm thick Interlocking Tiles in street No. 11, New Shivaji Nagar & Hari Kartar Colony. ILT80 Street No. 11, New Shivaji Nagar & Hari Kartar Colony. 52.59 41.71 Durga Const. Co. B/br/2013/23 31/12/2013 4 100.00 50.81 44.37 -2.66
38 B B1 40 ongoing cq nw br P/F Direction Boards in Various Streets of Ward No.40. Others Various Streets of Ward No.40. 3.55 2.13 Aglow Builders B/br/2014/49 12/02/2014 2 100.00 1.82 0.00 2.13
39 B B1 40 ongoing cq nw br Const of Hanuman Mandir Road with RMC M-30 in W-40,41 RMC6 Hanuman Mandir Road in W-40,41 42.41 35.70 Inderjit Bjaj B/br/2014/47 12/02/2014 3 100.00 33.44 0.00 35.7
40 B B1 40 ongoing cq nw br Laying 80mm thick Interlocking Tiles in streets 15 & 16, Janakpuri ILT80 Streets 15 & 16, Janakpuri 37.65 31.85 Inderjit Bjaj B/br/2014/44 12/02/2014 44 100.00 25.90 0.00 31.85
41 B B1 40 ongoing cq nw br Providing & laying 60mm thick Interlocking Tiles/paver blocks of M-35 grade in street no.2 of Mohalla Dharampuram W. No.40. ILT60 Mohalla Dharampura 4.95 4.40 Rajjowal Co-Op L/C Society Ltd. B/br/2015/23 31/08/2015 1 100.00 3.84 0.00 4.4
42 B B1 40 ongoing cq nw br Laying 80-MM thick Interlocking Tiles Pavor Block M-35 Grade in street of Mohalla Harikartar Colony. ILT60 Ludhiana 2.94 2.39 The Samrala Co-Op L/C Ltd. B/br/2016/G33/2 08/04/2016 1 100.00 2.36 2.05 0.34
43 B B1 40 ongoing cq nw br Laying 60-MM Interlocking Tiles Pavor Block M-35 Grade in Streets Mohalla Dharampura Nr.ICE Factory. ILT60 Ludhiana 2.73 2.24 The Samrala Co-Op L/C Ltd. B/br/2016/G33/3 08/04/2016 1 100.00 2.24 1.94 0.3
44 B B1 40 ongoing cq nw br Const. of Walls of Nallah in New Shiva Ji Nagar W.No.40 Others Ludhiana 4.85 4.56 The Samrala Co-Op L & C Society Ltd. B/br/2015/47/EEB 27/12/2015 1 100.00 4.56 0.00 4.56
45 B B1 40 ongoing other nw br Laying 80mm thick Interlocking Tiles/paver blocks of M-40 grade in streets of Mohalla Harikartar Colony & Cheema Colony in W No.40 ILT80 Harikartar & Cheema Colony 46.90 43.15 M/s Durga Const. Co. B/br/2016/33 22/04/2016 3 90.00 6.86 29.65 13.5
46 B B1 40 ongoing other nw br Laying 4" thick RMC( M-20) in street No.4,6,9 & 13 of New Shivaji Nagar W No.40 RMC4 New Shivaji Nagar 50.06 45.05 M/s S.K Const. Co. B/br/2016/97 27/05/2016 3 60.00 0.00 0.00 45.05
47 B B1 40 ongoing other nw br Laying RMC in different streets of W No.40 (91.98 Lacs) Laying RMC( M-20) in streets of Mohalla New Shiva Ji Nagar in W No.40 (38.54) and Laying RMC( M-20) in various streets of Hargobind Nagar W No.40(53.44) RMC4 W No.40 91.98 82.78 M/s S.K Const. Co. B/br/2016/142 30/05/2016 3 40.00 0.00 0.00 82.78
48 B B1 40 ongoing gq nw br Providing & Fixing of Rubber Speed Breakers in various streets of W No.40 Others W No.40 4.42 3.76 The Gill Co-Op Labour & Construction Society B/br/2016/176 28/06/2016 2 100.00 2.93 0.00 3.76
49 B B1 41 ongoing cq nw br Laying RMC on Streets of New Kidwai Nagar RMC4 Streets of New Kidwai Nagar 6.15 5.78 Bhupinder singh B/br/2012/15 03/07/2012 2 100.00 5.78 5.78 0
50 B B1 41 ongoing cq mw br Repair & Laying BM &PC on Kidwai Nagar Road adjoining Begam Park, Ludhiana BMPC Kidwai Nagar Road adjoining Begam Park 4.57 4.30 Gupta Construction Pvt.Ltd. B/br/2011/159 27/07/2011 2 100.00 4.30 4.30 0
51 B B1 41 ongoing cq nw br Laying BM&PC on various road of Kidwai Nagar BMPC Kidwai Nagar 24.24 22.29 Dass Builders B/br/2011/224 14/12/2011 2 100.00 22.29 22.29 0
52 B B1 41 ongoing cq mw br Repair of various Streets with PCC in the Area of Hargobind Nagar&New Hargobind Nagar Janakpuri PCC Area of Hargobind Nagar&New Hargobind Nagar Janakpuri 9.09 7.12 Mittal & Co. B/br/2011/228 20/12/2011 4 100.00 7.12 7.12 0
53 B B1 41 ongoing cq nw br laying PCC in New Kidwai Nagar PCC New Kidwai Nagar 8.23 7.41 Kirpal Singh B/br/2011/58 27/06/2011 2 100.00 7.41 7.41 0
54 B B1 41 ongoing cq mw br Repair of Various Streets (PCC) in the Jankpuri,W.No.41,Ludhiana PCC Janakpuri 7.32 5.40 Surya Construction Co. B/br/2011/132 27/07/2011 3 100.00 5.40 5.40 0
55 B B1 41 ongoing cq nw br Providing and Fixing of Kerb Stone and Interlocking Tiles on side road Street No.0 Kidwai Nagar to Hargobind Marg, Ludhiana ILT60 Street No.0 Kidwai Nagar to Hargobind Marg 34.94 26.02 Baljit Singh Gill B/br/2011/216 14/12/2011 2 100.00 26.02 26.02 0
56 B B1 41 ongoing cq nw br P/F of Indication Board in ward no.41 Kidwai Nagar,Hargobind Nagar,Janakpuri,New Hargobind Nagar & New Kidwai Nagar,Ludhiana Others Kidwai Nagar,Hargobind Nagar,Janakpuri,New Hargobind Nagar & New Kidwai Nagar 7.53 5.04 Ram Parkash Kakkar B/br/2012/6 15/05/2012 1 100.00 5.04 5.04 0
57 B B1 41 ongoing cq nw br Const of Room & Bathroom at Senior Citizen Bhavan Kidwai Nagar. Others Senior Citizen Bhavan Kidwai Nagar. 3.02 2.99 Capital Const. Co. B/br/2014/41 12/02/2014 1 100.00 2.40 0.00 2.99
58 B B1 41 ongoing cq nw br Laying 80mm thick Interlocking tiles in St No.5, New Hargobind Nagar ILT80 New Hargobind Nagar 18.76 15.00 Durga Const. Co. B/br/2013/18 16/12/2013 6 100.00 13.50 0.00 15
59 B B1 41 ongoing cq nw br Repair of various parks in W-41 Parks Sub Zone B1 8.76 7.00 Durga Const. Co. B/br/2013/18 16/12/2013 6 100.00 5.60 0.00 7
60 B B1 41 ongoing cq nw br Various Developement works falling under Sub Zone B1 W No.18, 41 & 43 Others Janakpuri 93.63 74.85 Durga Const. Co. B/br/2013/18 16/12/2013 6 100.00 73.26 56.47 18.38
61 B B1 41 ongoing other nw br Const. of main road of Hargobind Marg from Chadda pulley to Ex Councillor's house W. No.40 & 41 SDBC Hargobind marg 30.05 28.70 M/s S.K Const. Co. B/br/2016/79 04/05/2016 2 100.00 0.00 0.00 28.7
62 B B1 41 ongoing other nw br Laying RMC in different streets of W No.41 (139.39 Lacs) Laying RMC( M-20) in streets of Hargobind Nagar (Part-I) of W. No.41(47.21) and Laying RMC( M-20) in streets of Hargobind Nagar (Part-II )of W. No.41(43.57) and Const. of Road by laying RMC( M-20) in streetno.10-1/2 & Links of Hargobind Nagar W No.41 (48.61) RMC4 W No.41 139.39 125.45 M/s T&G Const. Co. B/br/2016/145 30/05/2016 4 75.00 17.32 76.11 49.34
63 B B1 42 ongoing cq mw br Laying PCC in Streets Gurudwara Sohan Sahib Ucha Tibba Islam Ganj PCC Streets Gurudwara Sohan Sahib Ucha Tibba Islam Ganj 14.62 9.62 Satwinder Singh Bajwa B/br/2011/117 27/07/2011 3 100.00 9.62 9.62 0
64 B B1 42 ongoing cq mw br Clossing Drian & Laying PCC in Streets of Kot Alamgir PCC Streets of Kot Alamgir 16.53 13.41 Baljit Singh Gill B/br/2011/122 27/07/2011 3 100.00 13.41 13.41 0
65 B B1 42 ongoing cq nw br Laying 80mm thick Interlocking tiles in area of sub zone B1 ILT80 sub zone b1 94.81 93.86 Durga Const. Co. B/br/2013/19 16/12/2013 6 100.00 75.45 60.23 33.63
66 B B1 42 ongoing cq nw br Laying RMC M-20, 4" thick in sts of Amarpura & Ajit Nagar W-42, Ludhiana RMC4 Streets of Amarpura & Ajit Nagar 53.90 44.09 Ashok Kumar Sobti B/br/2014/5 11/09/2014 5 100.00 45.23 0.00 44.09
67 B B1 42 ongoing cq nw br Laying 60mm thick Interlocking tiles M-30 in sts of Habib Ganj in W-42, Ludhiana ILT60 Moh. Habib Ganj 37.11 29.55 Ashok Kumar Sobti B/br/2014/6 11/09/2014 4 100.00 32.49 0.00 29.55
68 B B1 42 ongoing cq mw br Repair & Maintenance work of various areas of Ward No.42 Others Ward No.42 4.87 3.97 The Samrala Co-Op L & C Society Ltd. B/br/2015/G33/48 27/12/2015 1 100.00 3.97 3.45 0.52
69 B B1 42 ongoing other nw br Laying 25mm thick PC in streets of Kidwai Nagar W. No.42 PC Kidwai Nagar 19.34 18.47 M/s Kabir Infra Pvt. Ltd. B/br/2016/80 04/05/2016 2 68.00 12.65 0.00 18.47
70 B B1 42 ongoing other nw br Laying PCC in various streets of Mohalla Mustaq Ganj W No.42 PCC Mustaq Ganj 35.29 31.76 M/s S.K Const. Co. B/br/2016/99 27/05/2016 2 60.00 0.00 0.00 31.76
71 B B1 42 ongoing other nw br Laying RMC( M-20) on main Post Office road & adjoining streets in Amarpura W. No.42 RMC4 Amarpura 71.70 62.69 Sh Varinder Singh B/br/2016/31 22/04/2016 3 90.00 17.37 43.19 19.5
72 B B1 43 ongoing cq nw br Laying 25 mm Thick pc & interlocking Tiles,kerb stone on side road of Kushat Ashram Main Road,Ludhiana BMPC Kushat Ashram Main Road 16.47 14.32 Dass Builders B/br/2012/7 15/05/2012 2 100.00 14.32 14.32 0
73 B B1 43 ongoing cq nw br P/F Direction Boards in various streets of W-43 Others Sub Zone B1 3.43 2.74 Durga Const. Co. B/br/2013/18 16/12/2013 6 100.00 2.24 0.00 2.74
74 B B1 43 ongoing gq nw br P/F 60mm thick Interlocking tiles/Paver blocks M-35 grade in streets of Mohalla Hargobindpura W No.43 ILT60 Hargobindpura Mohalla 5.76 4.77 M/s Landa Co-OP L/c Society B/br/2015/38 20/10/2015 1 100.00 4.62 0.00 4.77
75 B B1 43 ongoing other nw br Laying 60mm thick Interlocking Tiles/paver blocks of M-35grade in streets of Mohalla Islam Ganj of W-43 ILT60 Islam Ganj 40.15 34.71 Sh Varinder Singh B/br/2016/32 22/04/2016 2 65.00 0.00 0.00 34.71
76 B B1 43 ongoing other nw br Laying 60mm thick Interlocking Tiles/paver blocks of M-35grade in streets of Mohalla Prem Nagar of W-43 (27.66) and Laying 80mm thick Interlocking Tiles in Mohalla Mustaq Ganj W No.43 (23.40) ILT60 Prem Nagar & Mustaq Ganj 51.06 46.69 Sh Varinder Singh B/br/2016/163 02/06/2016 3 85.00 40.23 0.00 46.69
77 B B1 43 ongoing other nw br Providing & laying 80mm thick Interlocking tiles in various streets of W No.43 (100.20 Lacs) roviding & laying 80/60mm thick Interlocking Tiles/paver blocks of M-40/M-35 grade in Prem Nagar (Part-I) W. No.43.(46.44) and Providing & laying 60mm thick Interlocking Tiles/paver blocks of M-35 grade in Islam Ganj W. No.43.(14.06) andLaying 60mm thick Interlocking Tiles/paver blocks of M-35grade in streets of Mohalla Prem Nagar near Islam Ganj of W-43 (39.70) ILT80 W No.43 100.20 91.28 M/s Durga Const. Co. B/br/2016/107 27/05/2016 4 60.00 17.55 37.93 53.35
78 B B2 10 ongoing cq mw br Laying BM & PC from Tikona Park to Sector 32 via sukhdev nagar BMPC Tikona Park to Sector 32 22.67 22.32 A-One Builders B/br/2011/6 05/05/2011 3 100.00 22.32 22.32 0
79 B B2 10 ongoing cq nw br Construction of footpath on both side of road from Chandigarh Road to Puda Road Others Chandigarh Road to Puda Road 20.15 15.87 C.J Builders B/br/2010/50 18/08/2010 3 100.00 12.89 12.89 2.98
80 B B2 10 ongoing cq nw br Laying 60mm thick interlocking tiles paver M-35 Grade in the area of sub zone B2 (with maintenance of 5 years) ILT60 Sub Zone B2 79.29 73.82 Rai Const. Co. B/br/2013/17 16/12/2013 4 100.00 73.82 0.00 73.82
81 B B2 10 ongoing cq nw br Const. of road(Revenue Rasta) by laying BM & PC from Guru Nanak Nagar to Central Jail Tajpur road W-10 BMPC Adjoining Guru Nanak Nagar 88.42 68.89 Sunil Kumar B/br/2014/34 28/01/2014 5 100.00 54.20 0.00 68.89
82 B B2 10 ongoing cq nw br Reconditioning of Road from Puda Road to Sector 32 adjoining Baba jaswant Singh College BMPC Puda Road to Sec-32 adjoining Baba Jaswant Singh College 7.15 5.68 Sunil Kumar B/br/2014/35 28/01/2014 4 100.00 5.90 5.90 -0.22
83 B B2 10 ongoing cq nw br Const of Road from Sukhdev Nagar Poltary Farm to Sector 32 BMPC Sukhdev Nagar Poltary Farm to Sector 32 27.08 21.50 Sunil Kumar B/br/2014/35 28/01/2014 4 100.00 26.70 20.99 0.51
84 B B2 10 ongoing cq nw br Laying 60mm thick interlocking tiles paver M-35 Grade in Green Belt Park at MIG Colony (Part II) ILT60 MIG Colony 31.00 28.86 Rai Const. Co. B/br/2013/17 16/12/2013 4 100.00 14.26 0.00 28.86
85 B B2 10 ongoing cq nw br Laying 60mm thick interlocking tile on side berms from Tikona Park to Sukhdev Nagar Poultary Farm ILT60 Tikona Park to Sukhdev Nagar Poultary Farm 21.80 20.30 Rai Const. Co. B/br/2013/17 16/12/2013 4 100.00 15.40 0.00 20.3
86 B B2 10 ongoing cq nw br Construction of road by laying DBM & SDBC from Chandigarh road to Tajpur road on Puda road. DBM Puda Road 259.46 194.26 J.K Infocon B/br/2015/24 15/09/2015 4 100.00 246.47 120.00 74.26
87 B B2 10 ongoing gq nw br Construction of main Bhamian road from Chd. road upto MC Limit. Others Bhamian Road 100.47 77.13 J.K Infocon B/br/2015/30 24/09/2015 3 100.00 72.34 55.00 22.13
88 B B2 10 ongoing cq nw br Laying RMC Gosian Colony & Iinks of Moh. Guru Nanak Nagar RMC6 Guru Nanak Nagar 65.41 51.82 Rajesh Kumar Sood B/br/2015/34 24/09/2015 4 100.00 51.03 10.00 41.82
89 B B2 10 ongoing other nw br Construction of Road by laying BM & PC in New Onkar Vihar W No.10 BMPC New Onkar Vihar 22.40 21.95 M/s Apex Builders B/br/2016/213 03/10/2016 2 30.00 5.85 0.00 21.95
90 B B2 10 ongoing gq nw br Const of room at Govt. Animal Hospital Jamalpur Awana Buildings W No.10 3.00 2.78 M/s Apex Developers B/br/2016/1 08/04/2016 1 100.00 2.78 0.00 2.78
91 B B2 11 ongoing cq mw br Laying BM PC on road of Kuliewal Phirni BMPC Kuliewal Phirni 10.15 9.23 Dass Builders B/br/2011/140 21/01/2011 2 100.00 9.23 9.23 0
92 B B2 11 ongoing cq nw br Development of park along with repair of room and painting Jamalpur Disposal Parks Jamalpur Disposal 20.95 19.90 Mandeep Singh B/br/2011/66 04/07/2011 3 100.00 12.41 12.41 7.49
93 B B2 11 ongoing cq nw br Reconditioning of Bhamian road (Damaged protion) by laying BM PC BMPC Bhamian road 29.97 25.43 Kabir Const. Co. B/br/2011/67 04/07/2011 2 100.00 28.64 28.64 -3.21
94 B B2 11 ongoing cq nw br Const of Boundary Wall At Village Kuilewal Near T/Well on Chandigarh Road Others Chandigarh Road 3.89 3.46 Puran Chand Mahajan B/br/2009/233 23/02/2009 2 100.00 2.08 2.08 1.38
95 B B2 11 ongoing cq nw br Laying DBOE paving in Links of Bhamian Road Others Bhamian Road 2.57 2.29 Bhupinder Singh Co. B/br/2011/162 12/09/2011 2 100.00 2.27 2.27 0.02
96 B B2 11 ongoing cq mw br Laying BM & PC from Tikona Park Bhamian road to Ch. Road Ldh. BMPC Bhamian Road 41.55 31.88 Sunil Kumar B/br/2011/189 07/12/2011 4 100.00 30.80 30.80 1.08
97 B B2 11 ongoing cq nw br Repiar Painting and fixing of children playig equipment at L.I.G., M.I.G & H.I.G. Park in w.no.11 Parks L.I.G., M.I.G & H.I.G FLATS , JAMALPUR 7.13 5.13 Ram Parkash Kakkar B/br/2011/142 27/08/2011 3 100.00 4.22 4.22 0.91
98 B B2 11 ongoing cq nw br Const of streets with RMC (M-20 Grade) in area of Sub Zone B2 Ward No.11 RMC4 Kuliewal Road Master Colony to Sarpanch Colony 31.98 26.17 Kohinoor Builders B/br/2013/11 04/12/2013 3 100.00 21.19 0.00 26.17
99 B B2 11 ongoing cq nw br Const of B/wall at Village Kuliewal Sports Ground Others Village Kuliewal Sports Ground 3.60 3.37 Manohar Singh B/br/2014/42 12/02/2014 2 100.00 3.46 2.89 0.48
100 B B2 11 ongoing cq nw br Laying 60mm thick interlocking tiles paver M-35 Grade adjoining Kuliewal Phirni Mohindra Public School ILT60 Adjoining Kuliewal Phirni Mohindra Public School 14.50 11.86 Kohinoor Builders B/br/2013/22 16/12/2013 3 100.00 8.95 0.00 11.86
101 B B2 11 ongoing cq nw br Laying BM & PC from Village Kuliwal to Master Colony BMPC Village Kuliewal to Master Colony 20.58 16.20 Sunil Kumar B/br/2014/35 28/01/2014 4 100.00 14.65 14.65 1.55
102 B B2 11 ongoing cq nw br Const of B/wall at Village Kuliewal Sports Ground Others Village Kuliewal Sports Ground 1.00 0.99 Capital Const. Co. B/br/2014/54 18/02/2014 1 100.00 1.01 0.99 0
103 B B2 11 ongoing gq nw br Strengthening and laying BM & PC in various sts of Kuliewal Village BMPC KULIEWAL VILLAGE 53.29 44.28 Sunil Kumar B/br/2011/209 13/11/2011 3 100.00 44.28 44.28 0
104 B B2 11 ongoing cq nw br Laying 60mm thick interlocking tiles paver M-35 Grade adjoining Kuliewal Phirni Mohindra Public Schoolin Links of Kuliewal Village ILT60 Links of Kuliewal Village 17.28 14.14 Kohinoor Builders B/br/2013/22 16/12/2013 3 100.00 10.69 0.00 14.14
105 B B2 11 ongoing other nw br Providing & laying 80mm thick Interlocking Tiles/paver blocks of M-40 grade in streets of mohalla Sawan Vihar W. No.11. ILT80 W No.11 165.54 137.23 Sh Rajesh KUmar Sood B/br/2016/15 18/04/2016 5 90.00 2.66 109.33 27.9
106 B B2 11 ongoing other nw br Const. of Road by laying RMC( M-20) in streets of mohalla Beant Colony W No.11 RMC4 W No.11 59.54 53.59 M/s Ludhiana Const Co. B/br/2016/43 22/04/2016 3 30.00 15.36 0.00 53.59
107 B B2 11 ongoing other nw br Const. of Road by laying RMC( M-20) in streets of mohalla Ganpati Vihar W No.11 RMC4 W No.11 42.28 38.05 M/s Kabir Infra Pvt. Ltd. B/br/2016/45 22/04/2016 3 95.00 6.57 28.37 9.68
108 B B2 11 ongoing other nw br Providing & laying 80mm thick Interlocking Tiles/paver blocks of M-40 grade in streets of mohalla Jappan Colony W. No.11. ILT80 W No.11 34.30 32.93 M/s The Dharour Co-Op L & C Society B/br/2016/148 01/06/2016 2 80.00 23.05 0.00 32.93
109 B B2 11 ongoing other nw br Const. of Road by laying RMC in different streets of W No.11 (117.54 Lacs) Laying 4" thick RMC( M-20) in streets of Bank Colony W No.11 (38.09) and Const. of Road by laying RMC( M-20) in streets of Mohalla Bachittar Nagar W No.11 (79.45) RMC4 W No.11 117.54 98.67 Sh Ashok Kumar Sobti B/br/2016/129 30/05/2016 4 95.00 10.42 78.93 19.74
110 B B2 11 ongoing other nw br P/F 60mm thick Interlocking Tiles/paver blocks of M-35 grade in streets of Mohalla Aman Nagar of W-11 ILT60 W No.11 16.97 15.61 M/s Sunet Co-Op L & C Society B/br/2016/158 02/06/2016 5 0.00 0.00 0.00 15.61
111 B B2 11 ongoing other nw br Providing & Fixing 60/80mm thick Interloicking tiles in Panditan Wali Gali Mundian Kalan & in streets of Gobind Colony on 33' road Wali Gali W No.12 (29.91) and P/F 80mm thick Interlocking tiles paver block M-40 grade in Raja Garden on Bhamian Road W No.11(22.17) ILT80 Panditan Wali Gali & Raja Garden 52.08 42.21 M/s Aglow Builders B/br/2016/216 21/11/2016 2 45.00 19.25 0.00 42.21
112 B B2 11 ongoing other nw br Laying 60mm thick Interlocking Tiles on side berms of LIG & MIG Flats Jamalpur W No.11 ILT80 W No.11 70.12 58.14 M/s Aglow Builders B/br/2016/219 07/12/2016 2 45.00 24.37 5.22 52.92
113 B B2 12 ongoing mlaq mw br Laying BM &PC from Ram Nagar to Gobind Nagar 33' road LDH. BMPC Ram Nagar to Gobind Nagar 33' road 99.95 77.39 S.K. Const. Co. B/br/2011/186 16/11/2011 4 100.00 91.23 91.23 -13.84
114 B B2 12 ongoing cq mw br Laying DBOE paving in Sarpanch Colony Others Sarpanch Colony 22.55 21.13 Soham Construction Co. B/br/2012/2 20/04/2012 4 100.00 18.88 18.88 2.25
115 B B2 12 ongoing cq mw br Laying BM & PC from Sarpanch Wali Moter to 33' road,Mundian Kalan,Ludhiana. BMPC Mundian Kalan near 33' Road 16.36 15.20 Apex Builder B/br/2010/74 29/10/2010 2 100.00 13.53 13.53 1.67
116 B B2 12 ongoing mlaq nw br Laying BM & PC on 33' Road from Radha Swami Road to Gobind Nagar BMPC Main 33' Road 93.38 72.78 Dass Builders B/br/2011/137 27/07/2011 4 100.00 82.27 82.27 -9.49
117 B B2 12 ongoing cq nw br Laying 80mm thick interlocking tiles paver M-40 Grade in Gobind Colony ILT80 Gobind Colony 121.27 97.83 Rajesh Kumar Sood B/br/2013/16 16/12/2013 6 100.00 95.89 0.00 97.83
118 B B2 12 ongoing cq nw br Strengthing & Cost. Of Road by Laying BM & PC from Govt. Flat & Ram Nagar 33' Road BMPC Ram Nagar 33' Road 43.59 34.76 Sunil Kumar B/br/2014/25 28/01/2014 3 100.00 33.99 27.51 7.25
119 B B2 12 ongoing cq nw br Laying 60mm thick interlocking tiles paver M-35 Grade in Mundian Kalan Panditan Wali Gali ILT60 Mundian Kalan Panditan Wali Gali 2.95 2.38 Rajesh Kumar Sood B/br/2013/16 16/12/2013 6 100.00 0.00 0.00 2.38
120 B B2 12 ongoing other nw br Construction of road by laying BM & PC on road from Chandigarh road to Gurudwara Sahib Vill Mundian Kalan (28.14) and Const. of Road by laying BM & SDBC from 33’ Road to Bhamian Khurd W. No.12 (35.98) SDBC W No.12 64.12 61.23 M/s Ceigall India Ltd. B/br/2016/65 04/05/2016 3 90.00 26.90 27.10 34.13
121 B B2 12 ongoing other nw br Construction of road by laying BM & PC on road from Chandigarh road to 33' road Mundian Kalan BMPC W No.12 81.50 77.83 M/s Ceigall India Ltd. B/br/2016/66 04/05/2016 4 90.00 0.00 0.00 77.83
122 B B2 12 ongoing other nw br Const. of Road by laying BM & SDBC from Chd. Road near Sarab Hospital to Bhamian Kalan via Poltary farm Mundian Kalan W. No.12 SDBC W No.12 91.88 87.75 Sh S S Singla B/br/2016/67 04/05/2016 4 50.00 42.20 0.00 87.75
123 B B2 12 ongoing other nw br Providing & laying 80mm thick Interlocking Tiles/paver blocks of M-40 grade on 33' road in New Guru Teg Bhadur Nagar, Near Councillor Office W. No.12. ILT80 W No.12 110.71 91.90 Sh Rajesh KUmar Sood B/br/2016/18 18/04/2016 5 95.00 3.52 74.87 17.03
124 B B2 12 ongoing other nw br Providing & laying 80mm thick Interlocking Tiles/paver blocks of M-40 grade on 33' road in New Guru Teg Bhadur Nagar, Mundian Road W. No.12. ILT80 W No.12 118.03 101.25 M/s PP Enterprises B/br/2016/48 22/04/2016 5 75.00 55.69 0.00 101.25
125 B B2 12 ongoing other nw br Laying RMC( M-20) in streets of Jawala Singh Nagar of W. No.12 RMC4 W No.12 46.09 39.70 M/s Apex Developers B/br/2016/49 22/04/2016 3 90.00 35.75 0.00 39.7
126 B B2 12 ongoing other nw br Providing & laying 80mm thick Interlocking Tiles/paver blocks of M-40 grade on 33' road in New Guru Nanak Nagar W. No.12. ILT80 W No.12 134.24 123.50 M/s Ludhiana Const Co. B/br/2016/50 22/04/2016 5 80.00 98.66 0.00 123.5
127 B B2 12 ongoing other nw br Providing & laying 80mm thick Interlocking Tiles/paver blocks of M-40 grade on 33' road in Partap Colony W. No.12. ILT80 W No.12 163.54 137.39 Sh Rajesh KUmar Sood B/br/2016/19 18/04/2016 5 90.00 15.17 101.48 35.91
128 B B2 12 ongoing other nw br Providing & laying 80mm thick Interlocking Tiles/paver blocks of M-40 grade on 33' road in Harjap Colony W. No.12. ILT80 W No.12 135.46 112.57 Sh Rajesh KUmar Sood B/br/2016/20 18/04/2016 5 95.00 10.50 85.56 27.01
129 B B2 12 ongoing other nw br Const. of Mettalled roads in various streets of W No.12 Const. of various roads in GK Estate W No.12 SDBC W No.12 256.17 243.26 M/s Ceigall India Ltd. B/br/2016/179 04/07/2016 4 90.00 4.67 102.14 141.12
130 B B2 12 ongoing other nw br Const of road by laying BM & PC on Mundian Phirni & approach road to GK Estate Colony W No.12 BMPC Mundian Phirni 21.79 21.35 M/s Dass Builders Pvt. Ltd. B/br/2016/212 03/11/2016 1 50.00 10.91 0.00 21.35
131 B B2 12 ongoing other nw br Reconditioning of road by laying PC from Chandigarh road upto St No.8, Ram Nagar on main 33' road W No.12 PC W No.12 103.96 101.88 M/s J.K infocon Pvt. Ltd. B/br/2016/217 17/12/2016 3 70.00 73.58 0.00 101.88
132 B B2 12 ongoing other nw br Providing & laying 80mm thick Interlocking Tiles/paver blocks of M-40 grade on 33’ road in New Guru Teg Bhadur Nagar ILT80 W No.12 76.58 69.80 Sh Tarvinderpal Singh B/br/2016/47 22/04/2016 4 80.00 49.11 0.00 69.8
133 B B2 9 ongoing cq mw br Re-conditioning of laying PCC in various sts of Adarsh Nagar PCC Adarsh Nagar 45.53 31.84 3-C Construction B/br/2011/205 12/12/2011 3 100.00 22.03 22.03 9.81
134 B B2 9 ongoing cq nw br Re laying PCC in various streets of Indrapuri PCC Inderapuri 26.64 18.60 Satinder Singh Bajwa B/br/2011/206 13/12/2011 2 100.00 17.70 17.70 0.9
135 B B2 9 ongoing cq nw br P/F Interlocking Tiles/Paver Block 80mm thick in area of Sub Zone B2 Part A (with Maintenance of 5 years ) in Ward No-9 ILT80 Area of Sub Zone B2 Part A 63.99 51.35 Apex Developers B/br/2013/14 04/12/2013 4 100.00 51.05 18.80 32.55
136 B B2 9 ongoing cq nw br Laying 80m thick Interlocking tiles paver block M-40 grade in streets of Baba Deep singh Nagar and streets of Arjun Dhaba road part B( with maintenance of five year) in ward no.9 ILT80 BABA DEEP SINGH NAGAR, ARJUN DHABA ROAD 72.93 65.34 Narinder Kumar & Co. B/br/2013/21 16/12/2013 5 100.00 63.39 27.79 37.55
137 B B2 9 ongoing cq nw br P/F direction boards in various sts of W-9, Ludhiana Others Sub Zone B2 5.99 5.68 The Saharan Majra Co-Op L&T Society Ltd. B/br/2014/7 22/09/2014 1 100.00 4.70 0.00 5.68
138 B B2 9 ongoing gq nw br Supply of crushers 3/8" & coarse sand for hot mix plant of Municipal corporation Ludhiana Others Hot mix plant 124.48 90.72 Sh. Gagandeep Arora Govt. Contractor B/br/2016/170/EEB/G33 23/06/2016 6 100.00 19.17 69.77 20.95
139 B B2 9 ongoing other nw br Name of Work :-Laying 4" thick RMC( M-20) in streets of 4-1/2 no.,5no. & 6-1/2 no. & links of Guru Arjun Dev Nagar W No.9(30.03) and Laying RMC (M-20) from Tajpur road to Gurudwara Sahib W No.9.(33.20) RMC4 GAD Nagar & Tajpur road 63.23 55.51 M/s Apex Developers B/br/2016/180 04/07/2016 4 95.00 33.68 44.58 10.93
140 B B2 9 ongoing other nw br Laying RMC( M-20) in streets of Mohalla Aadarsh Nagar of W-9 (35.05) and Const. of Road by laying RMC( M-20) in various streets of mohalla Kishore Nagar, Aadarsh Nagar & Indra Colony W No.9 (33.61) RMC4 W. No.9 68.66 61.79 M/s Asis Builders B/br/2016/156 02/06/2016 4 85.00 2.45 49.43 12.36
141 B B2 9 ongoing other nw br Laying RMC( M-20) in streets around Dashmesh Dairy W No.09 (23.17) and Laying 4" thick RMC( M-20) in streets of Karam Colony W No.9 (47.58) RMC4 W. No.9 70.75 63.68 Sh Varinder Singh B/br/2016/155 02/06/2016 4 85.00 10.37 43.76 19.92
142 B B2 9 ongoing other nw br P/L 80/60mm thick Interlocking tiles in various streets of W No.9 Laying 60mm thick Interlocking Tiles/paver blocks of M-35 grade in streets of Mohalla Indrapuri of W-9 (13.18)and Laying 80mm thick Interlocking Tiles/paver blocks of M-40 grade in streets of Mohalla Indrapuri Street No.1 of W-9 (15.13)P/F 50mm & 60mm Interlocking tiles on side berms & Const. of Footpath on Guru Arjun Dev Nagar Main road W No.9 (119.66) ILT80 W. No.9 147.97 134.06 Sh Baljit Singh Gill B/br/2016/110 30/05/2016 4 66.00 89.30 0.00 134.06
143 B B2 9 ongoing other nw br Providing & laying 80mm thick Interlocking Tiles paver blocks of M-40 grade in streets of Mohalla Indrapuri & Indra Colony of W-9 ILT80 Indrapuri & Indra Colony 24.11 21.67 M/s The Satluj Co-Op Labour & const Society Ltd. B/br/2016/197 05/10/2016 1 60.00 13.23 0.00 21.67
144 B B2 9 ongoing gq nw br Const of Boundary wall at village Kuliewal near T/Well on Chandigarh road Others chandigarh Road 3.89 3.46 M/s Puran Chand Mhajan Contractor B/br/2009/233 26/02/2009 2 85.00 0.85 1.85 1.61
145 B B3 5 ongoing gq nw br Construction of RCC road near jain colony on rahon road RMC4 jain colony on rahon road 28.86 26.10 ESS ESS Builders B/br/2011/11 19/07/2011 3 100.00 26.10 26.10 0
146 B B3 5 ongoing gq mw br Strengthening of rahon road by laying 25mm thick PC from basti chowk to krishna colony. BMPC Basti chowk to Krishna colony. 23.08 21.02 sunil kumar B/br/2011/2 31/05/2011 2 100.00 21.02 21.02 0
147 B B3 5 ongoing mlaq nw br Construction of Room Shed Boundary Wall & Interlocking Tiles in Shamshan Ghat Chander Lok Colony ILT60 Shamshan Ghat Chander Lok Colony 27.15 24.45 Teg Builder B/br/2012/219 14/11/2012 2 100.00 24.45 24.45 0
148 B B3 5 ongoing cq nw br Laying BM & PC on Rahon Road From Jain Colony to Octorai Post BMPC Rahon Road From Jain Colony to Octorai Post 39.56 34.45 S.S Singla B/br/2011/11 15/05/2011 5 100.00 34.45 34.45 0
149 B B3 5 ongoing cq mw br Laying PCC flooring in Rahon Road,G.T Road to Baldev Nagar Rahon Road BMPC Rahon Road,G.T Road to Baldev Nagar Rahon Road 19.87 16.67 Mittal and Co. B/br/2011/131 27/07/2011 2 100.00 16.67 16.67 0
150 B B3 5 ongoing cq nw br Strengthing of Shamshanghat road from Tikona Park to Rahon road W-5 Others Tikona Park to Rahon road 37.66 29.58 Sunil Kumar B/br/2014/26 28/01/2014 3 100.00 34.16 0.00 29.58
151 B B3 5 ongoing cq nw br Const of street/roads of Gujjar ColonyRahon Raod W-5 Others Gujjar ColonyRahon Raod 44.09 34.39 Sunil Kumar B/br/2014/37 10/02/2014 3 100.00 31.00 0.00 34.39
152 B B3 5 ongoing cq nw br Const of street/roads of Jai Singh Nagar Rahon Raod W-5 Others Jai Singh Nagar Rahon Raod 55.86 42.44 Sunil Kumar B/br/2014/38 01/02/2014 4 100.00 36.11 0.00 42.44
153 B B3 5 ongoing cq nw br Const of Roads in Mohalla Golden Colony W-5 Others Mohalla Golden Colony 84.00 64.52 Sunil Kumar B/br/2014/39 10/02/2014 5 100.00 50.41 0.00 64.52
154 B B3 5 ongoing cq nw br Const of Streets in New Sarwan Park Rahon Road W-5 Parks New Sarwan Park Rahon Road 74.86 74.02 IHR ASSOCIATES B/br/2014/40 10/02/2014 4 100.00 19.86 0.00 74.02
155 B B3 5 ongoing cq nw br Const. of Public Toilet at Tikona Park W.No.5 Others Tikona Park 1.48 1.38 The Samrala Co-Op Society Ltd. B/br/2015/19 21/08/2015 2 35.00 55.55 0.00 1.38
156 B B3 5 ongoing gq nw br Construction of Road by laying BM & PC from Rahon road to Fish Chowk.(17.02), Construction of Roads in Mohalla Jain colony on Rahon Road by Laying BM & PC.(56.97) BMPC Rahon Road to Fish Chowk 73.99 70.66 M/s JK Infoconn B/br/2016/55 04/05/2016 3 75.00 30.21 13.92 56.74
157 B B3 5 ongoing gq nw br Construction of metalled roads in various streets of W No.5 (189.31 Lacs) Laying SDBC 30mm thick in the streets of mohalla New Subhash Nagar , W. No.5 (47.71) and Const. of Road by laying BM & PC in streets of Mohalla Sarwan Park on Rahon road W No.5 (17.82) and Laying BM & PC in streets of Mohalla Tilak Nagar on Rahon Road(49.93) and Laying BM & PC in streets of mohalla New Subhash Nagar near Karamsar Colony W No.05 (31.63) and Const.of Road by laying 30mm thick SDBC on Main Subhash Nagar Road W No.5 (42.22) SDBC W No.5 189.31 180.79 Sh S S Singla B/br/2016/94 27/05/2016 5 50.00 85.44 0.00 180.79
158 B B3 5 ongoing gq nw br Reconditioning of Road by laying 30mm thick SDBC in streets of Mohalla Ramesh Nagar W No.8 (31.16) and Reconditioning of Road by laying 30mm thick SDBC in streets of Mohalla Sahibzada Ajit Singh Nagar W No.8 (16.71) and Const. of Road by laying BM & PC in streets of New Juneja Colony W No.8(15.26) BMPC W No.8 63.13 59.97 M/s NKC Const. Pvt. Ltd. B/br/2018/94 01/03/2018 3 100.00 6.95 31.67 28.3
159 B B3 5 ongoing gq nw br Const. of Road by laying BM & SDBC on Main Bhagwan Nagar Road W No. 10 (47.44)--- (50%-50% work alloted to each Contractor) SDBC W No.10 23.72 18.18 M/s NKC Const. Pvt. Ltd. B/br/2019/47 07/03/2019 3 90.00 15.46 0.00 18.18
160 B B3 6 ongoing cq mw br Laying PCC flooring in sts of moh. Maya puri BMPC Mayapuri 50.26 41.83 Friends & Co. B/br/2011/201 12/12/2011 3 100.00 41.21 15.85 25.98
161 B B3 6 ongoing cq nw br Providing and Fixing of Retor Reflection board in w.no.6 Others W-6 3.45 2.30 Punit Kumar B/br/2011/156 27/07/2011 2 100.00 2.30 2.30 0
162 B B3 6 ongoing cq mw br Strengthening of main road subash nagar from bye pass to Towerline no. 5 by laying 30 mm thic SDBC & P/F of Hydrolic Tiles SDBC Subhash Nagar 27.88 24.07 Soham Const.Co B/br/2011/194 07/12/2011 4 100.00 24.07 24.07 0
163 B B3 6 ongoing cq nw br Const. of sts no. 1 new Shakti Nagar. BMPC Shakti Nagar 16.82 14.39 Apex Builders B/br/2011/203 12/12/2011 2 100.00 14.39 14.39 0
164 B B3 6 ongoing cq mw br Laying 25mm Thick PC & P/F Interlocking Tiles on Side Beems of Main Bhagwan Nagar Road from Tower Line No.2 to Tikona Park BMPC Main Bhagwan Nagar Road from Tower Line No.2 to Tikona Park 26.55 24.01 M/s S.K Construction Co. B/br/2013/30 01/01/2013 2 100.00 24.01 24.01 0
165 B B3 6 ongoing cq mw br Laying 25mm Thick PC & P/F Interlocking Tiles on Side Beems of Main Bhagwan Nagar Road from Bye-pass to Tower Line No.2 BMPC Main Bhagwan Nagar Road from Byepass to Tower Line No.2 24.84 20.73 S.K Construction Co. B/br/2013/31 01/01/2013 2 100.00 20.73 20.73 0
166 B B3 6 ongoing other nw br Devlopment & repair of green belt under tower line no. 5. (50%) Others Tower line no. 5 18.19 17.28 Swaran Singh & Avtar Singh Sekhon 50% B/br/2011/160 22/03/2011 2 100.00 17.28 17.28 0
167 B B3 6 ongoing cq nw br Strengthening of Subash Nagar Street by laying 25mm thick PC BMPC Subhash Nagar 34.58 31.16 S.S Singla B/br/2011/170 31/10/2011 5 100.00 31.16 31.16 0
168 B B3 6 ongoing cq nw br Laying BM & PC in Main Shastri Nagar road & Link of Ward no.6 BMPC Main Shastri Nagar 19.09 15.83 Sunil Kumar B/br/2012/17 04/07/2012 2 100.00 15.83 15.83 0
169 B B3 6 ongoing cq nw br Laying RMC (M-20) 4” thick in Subhash Nagar between Tower Line No. 2 to 5 RMC4 Subhash Nagar between Tower Line No. 2 to 5 44.28 35.95 ESS ESS BUILDERS B/br/2014/51 13/02/2014 3 100.00 18.17 0.00 35.95
170 B B3 6 ongoing cq nw br "Laying RMC M-20 in streets of Mohalla Sutantar Nagar & Shastri Nagar W-6 RMC4 SUTANTAR NAGAR & SHASTRI NAGAR 29.71 27.23 Samta Co-Op Labour & Const Society B/br/2014/57 28/02/2014 3 100.00 18.12 0.00 27.23
171 B B3 6 ongoing cq nw br Laying RMC (M-20) 4” thick in Nalwa Colony RMC4 NALWA COLONY 17.01 15.64 Samta Co-Op Labour & Const Society B/br/2014/55 26/02/2014 2 100.00 10.88 0.00 15.64
172 B B3 6 ongoing cq nw br Laying DBOE paving in streets Nalwa Colony Others Nalwa Colony 7.71 7.48 V.K. JAIN & COMPANY B/br/2009/255 26/02/2009 3 100.00 7.02 7.02 0.46
173 B B3 6 ongoing gq nw br Const of Dharamshalla near main towerline No.2 New Subhash Nagar W No.6 Others New Subhash Nagar 5.00 4.44 Capital Construction Co. B/br/2015/33 24/09/2015 2 50.00 0.00 0.00 4.44
174 B B3 6 ongoing gq nw br P/F 80mm thick Interlocking tiles in streets of Mohalla Subhash Nagar near Bhawani Model School BMPC P/F 80mm thick Interlocking tiles in streets of Mohalla Subhash Nagar near Bhawani Model School 63.75 55.49 M/s Apex Developers B/br/2016/34 22/04/2016 3 65.00 0.00 0.00 55.49
175 B B3 6 ongoing other nw br Const. of Mettaled Roads in various streets of W No.6 (109.84 Lacs) Const. of Road by laying 30mm thick SDBC on Main Bhagwan Nagar Road W No. 6 (32.80) and Const. of road by laying 30mm thick SDBC & RMC (M-20) on Main Towerline No.2 (44.88) and Const. of Road by laying SDBC on Main Shakti Nagar Road upto Mayapuri Chowk W No.6 & 8 (32.16) SDBC W No.6 109.84 104.90 Sh Sham Sunder Singla B/br/2016/95 27/05/2016 4 15.00 12.19 0.00 104.9
176 B B3 7 ongoing cq nw br Cosntruction of park on MC land near star city colony B/s Police Chowky Parks MC land near star city colony B/s Police Chowky 52.33 44.27 Baba Premix & Infra structure (P) Ltd. B/br/2011/74 12/07/2011 6 100.00 44.27 44.27 0
177 B B3 7 ongoing cq nw br Const. of PCC path at Garbage dump near STP on Tibba road Part - C PCC Garbage dump near STP on Tibba road 29.44 23.26 LRY Labour Contractor B/br/2012/232 26/03/2012 6 100.00 23.26 23.26 0
178 B B3 7 ongoing cq nw br Development of park in dairy complex part C on Tajpur road Parks Dairy complex on Tajpur road 9.91 6.95 Sona International B/br/2011/35 08/06/2011 4 100.00 6.95 6.95 0
179 B B3 7 ongoing other nw br Strenghning of Streets on road from dump road to Namdev colony BMPC From dump road to Namdev colony 26.65 18.77 Apex Builder B/br/2010/81 29/10/2010 4 100.00 18.77 18.77 0
180 B B3 7 ongoing cq nw br Laying BM PC for construction of drain and pulling in Preet nagar and Construction of parpet wall of Gopal nagar bridge at Budha Nallah BMPC Preet nagar and Gopal nagar bridge at Budha Nallah 9.46 6.18 Sunil Kumar B/br/2011/51 27/06/2011 2 100.00 6.18 6.18 0
181 B B3 7 ongoing cq mw br Strengthening of New Subash Nagar st.no10/1 to 10/4 & links by Laying 25 mm Thick Pc BMPC New Subhash Nagar 21.63 20.33 Sunil Kumar B/br/2010/32 08/06/2010 2 100.00 20.33 20.33 0
182 B B3 7 ongoing other nw br Laying 40 mm Thick BM & 20mm thick PC mix Seal from Grewal Colony to Raju Colony BMPC Grewal Colony to Raju Colony 14.00 13.44 A-One Builder B/br/2010/38 30/07/2010 4 100.00 13.44 13.44 0
183 B B3 7 ongoing gq nw br Strengthening of Kaka Dhola Road from Tajpur Road by Laying BM & PC BMPC Kaka Dhola Road from Tajpur Road 52.75 41.91 S.K Construction.Co B/br/2012/4 15/05/2012 3 100.00 41.91 41.91 0
184 B B3 7 ongoing gq nw br Strengthening of Main Tajpur road from Preet nagar to Octroi Limit BMPC Main Tajpur road from Preet nagar to Octroi Limit 83.31 73.08 J.K Infcon B/br/2012/26 21/07/2012 6 100.00 73.08 73.08 0
185 B B3 7 ongoing cq nw br Conctruction of PCC Path of Garbage Dump Near STP on Tibba Road Part A & B PCC Garbage Dump Near STP on Tibba Road 29.09 26.53 Satwinder Singh Bajwa B/br/2011/138 27/07/2011 3 100.00 26.53 26.53 0
186 B B3 7 ongoing gq nw br Construction of boundary wall, shed, room & Earth Filling in Christian Kabristan near Dump on Tibba road Others Christian Kabristan near Dump on Tibba road 30.58 25.39 Teg Builders B/br/2012/3 15/05/2012 2 100.00 5.73 4.65 20.74
187 B B3 7 ongoing cq nw br P/F Interlocking Tiles/Paver Block 80mm thick in area of Sub Zone B3 (with Maintenance of 5 years ) in Ward No-7 ILT80 Area of Sub Zone B3 99.42 78.65 Rajesh Kumar Sood B/br/2013/15 16/12/2013 6 100.00 84.09 7.45 71.2
188 B B3 7 ongoing cq nw br P/F Barbed wire on M.Corp. Land Opp. Police Chaunki, Tibba road W No.7 Others M.Corp. Land Opp. Police Chaunki, Tibba road W No.7 1.57 1.54 Manmohan Singh B/br/2015/14 05/05/2015 1 20.00 0.00 0.00 1.54
189 B B3 7 ongoing cq nw br Const. of road by laying DBOE paving from Kakka Dhaula road upto weighing bridge of Jamlapur dump, W.No.7 Others Kakka Dhaula road upto weighing bridge of Jamlapur dump 39.72 37.50 The Landa Co-Op Society Ltd. B/br/2015/36 08/10/2015 10 100.00 40.98 31.35 6.15
190 B B3 7 ongoing gq nw br Construction of Hanuman Mandir road of Sanjay Gandhi Colony by laying BM & PC .(19.58), Const. of road from Raju Colony to Sutantar Nagar by laying BM & PC on Mata Vaishnu Devi road Ludhiana.(27.17) BMPC Construction of Hanuman Mandir road of Sanjay Gandhi Colony by laying BM & PC .(19.58), Const. of road from Raju Colony to Sutantar Nagar by laying BM & PC on Mata Vaishnu Devi road Ludhiana.(27.17) 46.75 44.65 M/s Shiva Const. Co. B/br/2016/57 04/05/2016 3 95.00 0.00 0.00 44.65
191 B B3 7 ongoing gq nw br P/F 80mm thick Interlocking tiles in Streets of Charan Nagar, Tibba Road W No.07 ILT80 P/F 80mm thick Interlocking tiles in Streets of Charan Nagar, Tibba Road W No.07 132.15 109.55 Sh Rajesh Kumar Sood B/br/2016/5 18/04/2016 5 75.00 18.35 64.72 44.83
192 B B3 7 ongoing gq nw br Laying RMC M-20 in Mohalla LIG Colony.(24.69), Laying RMC M-20 4” thick in streets of Sanjay Gandhi Colony, Puda road.(44.39) RMC4 Laying RMC M-20 in Mohalla LIG Colony.(24.69), Laying RMC M-20 4” thick in streets of Sanjay Gandhi Colony, Puda road.(44.39) 69.08 55.68 Sh Rajesh Kumar Sood B/br/2016/151 02/06/2016 3 85.00 19.57 27.57 28.11
193 B B3 7 ongoing gq nw br P/F 80mm thick Interlocking tiles in streets of Bhola Colony Part B ILT80 P/F 80mm thick Interlocking tiles in streets of Bhola Colony Part B 44.20 39.55 M/s Friends & Co. B/br/2016/36 22/04/2016 3 50.00 0.00 0.00 39.55
194 B B3 7 ongoing gq nw br P/F 80mm thick Interlocking tiles in streets of Mohalla Heera Vihar Colony ILT80 P/F 80mm thick Interlocking tiles in streets of Mohalla Heera Vihar Colony 59.62 51.50 M/s T&G Const. Co. B/br/2016/38 22/04/2016 3 70.00 0.00 0.00 51.5
195 B B3 7 ongoing gq nw br Laying RMC M-20 in Streets of Sanjay Gandhi Colony on Puda Road RMC4 Laying RMC M-20 in Streets of Sanjay Gandhi Colony on Puda Road 84.12 67.80 Sh Rajesh Kumar Sood B/br/2016/7 18/04/2016 4 80.00 24.52 29.60 38.2
196 B B3 7 ongoing gq nw br Providing & laying 80/60mm thick Interlocking tiles in various streets of W No.7 (Part-1) Providing & laying 80mm thick Interlocking Tiles/paver block M-40 grade in streets of mohalla Sutantar Nagar W No.7(35.71) and Providing & laying 80mm thick Interlocking Tiles/paver block M-40 grade in streets of mohalla EWS Colony Pocket -V W No.7 (53.13) and P/F 60mm & 80mm thick Interlocking Tiles/paver blocks in streets of Preet Nagar W-7 (68.28) ILT80 W No.7 157.12 144.55 M/s SK Const. Co. B/br/2016/161 02/06/2016 5 50.00 15.35 51.34 93.21
197 B B3 7 ongoing other nw br Providing & laying 80mm thick Interlocking tiles in various streets of W No.7 (Part-3) (191.03 Lacs) Providing & laying 80mm thick Interlocking Tiles/paver block M-40 grade in streets of mohalla Vijay Nagar(Part-A) W No.7(53.17) and Providing & laying 80mm thick Interlocking Tiles/paver block M-40 grade in streets of mohalla Grewal Colony (Part C) W No.7(62.65) and Providing & laying 80mm thick Interlocking Tiles/paver block M-40 grade in streets of Baba Jiwan Singh Nagar (Part-B), Tajpur road(75.21) ILT80 W No.7 191.03 171.68 Sh Charanjit Singh B/br/2016/124 30/05/2016 5 70.00 107.07 65.21 106.47
198 B B3 7 ongoing other nw br Providing & laying 80mm thick Interlocking tiles in various streets of W No.7 (Part-5) (196.63Lacs) Providing & laying 80mm thick Interlocking Tiles/paver block M-40 grade in streets of Mohalla Baba Jiwan Singh Nagar (Part C), Tajpur road W. No.07.(74.15) and P/F 60mm & 80mm thick Interlocking Tiles/paver blocks in streets of Sukhdev Nagar W No.7(122.48) ILT80 W No.7 196.63 179.41 Sh Varinder Singh B/br/2016/120 30/05/2016 5 95.00 0.00 0.00 179.41
199 B B3 7 ongoing other nw br Providing & laying 80mm thick Interlocking tiles in various streets of W No.7 (Part-4) (195.51 Lacs) Providing & laying 80mm thick Interlocking Tiles/paver block M-40 grade in streets of mohalla Starcity (Part-C)on Tibba road W-7 (62.83) and Providing & laying 80mm thick Interlocking Tiles/paver block M-40 grade in streets of mohalla Puneet Nagar-Part A W No.7(64.79) and P/F 60mm & 80mm thick Interlocking Tiles/paver blocks in streets of Sutantar Nagar W-7 (67.89) ILT80 W No.7 195.51 167.88 Sh Satvinder Singh Bajwa B/br/2016/121 30/05/2016 5 80.00 0.00 0.00 167.88
200 B B3 7 ongoing other nw br Providing & laying 80mm thick Interlocking tiles in various streets of W No.7 (Part-1) (157.12Lacs) Providing & laying 80mm thick Interlocking Tiles/paver block M-40 grade in streets of mohalla Sutantar Nagar W No.7(35.71) and Providing & laying 80mm thick Interlocking Tiles/paver block M-40 grade in streets of mohalla EWS Colony Pocket -V W No.7 (53.13) and P/F 60mm & 80mm thick Interlocking Tiles/paver blocks in streets of Preet Nagar W-7 (68.28) ILT80 W No.7 157.12 144.55 M/s S.K Const. Co. B/br/2016/161 02/06/2016 5 90.00 0.00 0.00 144.55
201 B B3 7 ongoing cq nw br Providing & laying 60mm thick Interlocking Tiles/paver block M-35 grade in streets of Bhola Colony (Part-A), Tajpur road W. No.07. ILT60 Bhola Colony 60.73 51.13 M/s Aglow Builders B/br/2016/207 03/11/2016 2 0.00 0.00 0.00 51.13
202 B B3 7 ongoing gq nw br Providing & laying 80mm thick Interlocking Tiles/paver block M-40 grade in streets of mohalla New Subhash Nagar W. No.06(52.21) and P/F 80mm thick Interlocking Tiles in streets of mohalla Hira vihar Colony & Vijay Nagar W No.7 (29.92) ILT80 W No.7 82.13 71.73 Sh Ashok Kumar Sobti B/br/2016/230 07/12/2016 4 55.00 36.33 0.00 71.73
203 B B3 7 ongoing gq nw br Providing & laying 80mm thick Interlocking tiles/paver block M-40 grade in streets of Mohalla Starcity (Part-d) on Tibba road W No.7 ILT80 W No.7 78.87 52.72 M/s Anil Kumar & Sons B/br/2018/69 29/01/2018 3 50.00 26.19 22.78 29.94
204 B B3 7 ongoing gq nw br P/F 80mm thick Interlocking tiles in main streets of EWS Colony near Park W No.07(44.37) and P/F 60/80mm thick Interlocking tiles in Streets of Mata Karam Kaur Colony W No.7 (39.00) ILT80 W No.7 83.37 58.77 M/s Dynamic tiles B/br/2018/2 21/05/2018 4 50.00 17.10 14.87 43.9
205 B B3 8 ongoing cq nw br Providing and fixing of Indication board Others W-8 7.95 5.95 Punit Kumar B/br/2011/149 27/07/2011 3 100.00 5.95 5.95 0
206 B B3 8 ongoing cq nw br Laying BM & PC in Streets of New Shakti Nagar Part-II,Ludhiana. BMPC New Shakti Nagar 33.89 29.45 Apex Builder B/br/2010/66 27/10/2010 4 100.00 29.45 29.45 0
207 B B3 8 ongoing cq mw br Laying 25mm thick PC in sts of Punjabi Bag on Tibba road BMPC Punjabi Bag on Tibba road 15.29 12.86 Sunil Kumar B/br/2010/204 12/12/2010 2 100.00 12.86 12.86 0
208 B B3 8 ongoing cq mw br Laying PCC flooring in Streets of Guru Gobind Singh Nagar PCC Guru Gobind Singh Nagar 10.51 7.53 Teg Builder B/br/2011/220 14/12/2011 1 100.00 7.53 7.53 0
209 B B3 8 ongoing cq mw br Laying 25mm Thick PC in Mohalla Shakti Nagar BMPC shakti nagar 36.14 30.42 Sunil Kumar B/br/2013/2 12/05/2013 2 100.00 30.42 30.42 0
210 B B3 8 ongoing cq mw br Laying 25mm Thick PC in Mohalla Kabir Nagar BMPC Mohalla Kabir Nagar 28.83 23.82 Sunil Kumar B/br/2013/3 12/05/2013 2 100.00 23.82 23.82 0
211 B B3 8 ongoing cq nw br Const of main Guru Gobind Singh road with RMC M-30 Grade in area of Sub Zone B3 RMC6 Main Guru Gobind Singh road 22.76 18.51 Apex Developers B/br/2013/9 04/12/2013 3 100.00 13.07 0.00 18.51
212 B B3 8 ongoing cq nw br P/F 80mm thick Interlocking tiles in Mohalla Ram Nagar ILT80 Moh. Ram Nagar 15.98 12.74 Apex Developers B/br/2014/33 28/01/2014 3 100.00 9.85 0.00 12.74
213 B B3 8 ongoing cq nw br Laying PCC flooring in streets of Gulabhi bagah W-8 PCC GULABI BAGH 51.82 36.28 Varinder Singh (50%) B/br/2014/58 28/02/2014 4 100.00 17.87 0.00 36.28
214 B B3 8 ongoing cq nw br Laying PCC flooring in streets of Gulabhi Bagh PCC Gulabhi Bagh 51.82 36.28 Capital Const. Co. (50%) B/br/2014/59 28/02/2014 4 100.00 10.41 0.00 36.28
215 B B3 8 ongoing cq nw br P/F 80mm thick Interlocking tiles in Mohalla Shakti Nagar (Part A) ILT80 Moh. Shakti Nagar 19.00 15.14 Apex Developers B/br/2014/33 28/01/2014 3 90.00 15.48 0.00 15.14
216 B B3 8 ongoing gq nw br P/F 80mm thick Interlocking tiles paver M-40 Grade in streets of Mohalla New Karamsar Colony (Part B) ILT80 P/F 80mm thick Interlocking tiles paver M-40 Grade in streets of Mohalla New Karamsar Colony (Part B) 62.77 57.75 Sh Inderjit Singh B/br/2016/35 22/04/2016 20 90.00 47.18 0.00 57.75
217 B B3 8 ongoing gq nw br Construction of Road by laying 30mm thick SDBC from Main Tibba Road to Dr. Karam Singh Road on Towerline No.5 SDBC Construction of Road by laying 30mm thick SDBC from Main Tibba Road to Dr. Karam Singh Road on Towerline No.5 34.75 33.19 M/s VKBS Const. Co. B/br/2016/59 04/05/2016 2 85.00 27.40 0.00 33.19
218 B B3 8 ongoing gq nw br Const. of Road by laying BM & SDBC from main Tibba road to Budha Nallah Pulley via Gurmail Park & Gita Nagar SDBC Const. of Road by laying BM & SDBC from main Tibba road to Budha Nallah Pulley via Gurmail Park & Gita Nagar 30.29 28.93 M/s VKBS Const. Co. B/br/2016/60 04/05/2016 2 10.00 0.00 0.00 28.93
219 B B3 8 ongoing gq nw br P/F 80mm thick Interlocking tiles in Ram ditta Nagar ILT80 P/F 80mm thick Interlocking tiles in Ram ditta Nagar 46.55 39.10 M/s CNC Precision Engineering B/br/2016/9 18/04/2016 3 80.00 30.47 0.00 39.1
220 B B3 8 ongoing cq nw br Const ofRCC road by laying RMC (M-20) in streets of Mohalla Gulabhi Bagh.(39.63), Laying RMC M-20 in streets of Mohalla Gurmail Park on Tibba Road (Part A) (24.26) RMC4 Gurmail Park on Tibba Road 63.89 57.50 Sh Varinder Singh B/br/2016/153 02/06/2016 4 85.00 7.10 39.34 18.16
221 B B3 8 ongoing gq nw br Construction of Road by laying BM & SDBC on road from Tibba road to New Karamsar Colony via Mayapuri & Subhash Nagar. SDBC Construction of Road by laying BM & SDBC on road from Tibba road to New Karamsar Colony via Mayapuri & Subhash Nagar. 58.78 56.13 M/s Bansal Const. Co. B/br/2016/61 04/05/2016 3 13.00 7.52 0.00 56.13
222 B B3 8 ongoing gq nw br Providing & laying 80mm thick Interlocking Tiles/paver block M-40 grade in streets of Company Bagh (Part A) ILT80 Providing & laying 80mm thick Interlocking Tiles/paver block M-40 grade in streets of Company Bagh (Part A) 51.03 46.95 M/s Gupta Contractors Pvt. Ltd. B/br/2016/40 22/04/2016 3 95.00 4.40 27.42 19.53
223 B B3 8 ongoing gq nw br Laying RMC M-20 in streets of Gurmel Park RMC4 Laying RMC M-20 in streets of Gurmel Park 57.13 46.92 M/s Capital Const. Co. B/br/2016/10 18/04/2016 3 70.00 8.93 17.99 28.93
224 B B3 8 ongoing gq nw br P/F 80mm thick Interlocking tiles in streets of mohalla Company Bagh Colony (Part B) ILT80 P/F 80mm thick Interlocking tiles in streets of mohalla Company Bagh Colony (Part B) 75.00 69.00 M/s Asis Builders B/br/2016/41 22/04/2016 4 80.00 42.85 0.00 69
225 B B3 8 ongoing gq nw br Providing & laying 80mm thick Interlocking tiles in various streets of W No.8 (Part-2) Providing & laying 80mm thick Interlocking Tiles/paver block M-40 grade in streets of mohalla Kartar Nagar(48.23) and Providing & laying 80mm thick Interlocking Tiles/paver block M-40 grade in streets of New Company Bagh-Part B in W No.8 (40.76) and P/F 60mm & 80mm thick Interlocking Tiles/paver blocks in streets of New Karamsar Colony W-8 (32.21) and Laying 80mm thick Interlocking Tiles/paver blocks of M-40 grade in streets of Mohalla Guru Gobind Singh Nagar, Tibba road(32.16) ILT80 W No.8 153.36 141.09 M/s SK Const. Co. B/br/2016/159 02/06/2016 5 75.00 35.28 69.76 71.33
226 B B3 8 ongoing other nw br Const. of Mettaled Roads in various streets of W No.8 (84.90 Lacs) Const. of streets by laying BM & PC from Towerline No.5 to Gulabi Bagh in Mohalla Kishan Vihar W No.8 (34.05) and Const. of Road by laying 30mm thick SDBC in streets of Mohalla Iqbal Nagar W No.8 (30.86) and Construction of road by laying BM & PC from New Karamsar Colony to Juneja Colony in W No.8 (19.99) BMPC W No.8 84.90 81.08 M/s Dass Builders Pvt. Ltd. B/br/2016/135 30/05/2016 3 35.00 10.99 12.48 68.6
227 B B3 8 ongoing other nw br P/F 80mm thick Interlocking Tiles in streets of Mohalla Gita Nagar Part-A W-8 ILT80 Gita Nagar 63.19 51.69 M/s Gupta Engineers and Builders B/br/2016/203 24/10/2016 3 80.00 33.04 0.00 51.69
228 B B3 8 ongoing cq nw br P/F Interlocking Tiles/paver block 80mm thick in the area of sub zone B3 (Revised) ILT80 Sub Zone B3 43.66 34.80 Apex Developers B/br/2014/33 28/01/2014 3 100.00 33.93 23.00 11.8
229 B B3 8 ongoing gq nw br Laying RMC (M-20) in streets of Mohalla Gurmail Park W.No.8 RMC4 Gurmail Park, W.No.8 57.13 46.92 Capital Construction Co. B/br/2016/G-33 10/EEB 18/04/2016 3 70.00 8.93 17.99 28.93
230 B B3 8 ongoing gq nw br P/F 80mm thick Interlocking tiles paver block M-40 grade in Anand Market near Kabir Nagar on Tibba Road, W No.08(14.36) and P/F 80mm thick Interlocking tiles paver block M-40 grade in streets of Beant Nagar on Tibba road W No.08(29.79) and P/F 80mm thick Interlocking tiles paver block M-40 grade in streets of mohalla New Punjabi Bagh near Towerline No.2 W No.08(31.00) ILT80 W No.8 75.15 65.64 Sh Ashok Kumar sobti B/br/2016/222 07/12/2016 3 80.00 52.80 0.00 65.64
231 B B4 13 ongoing cq nw br Development of 2 nos cremation ground B/s of Avon Cycle, Nichi Mangli Others Nichi Mangli 23.68 19.01 J.B & Co. B/br/2011/77 12/07/2011 4 100.00 19.01 19.01 0
232 B B4 13 ongoing cq nw br Construction of road & links from sharu Steel to A-One Ispat ( Chandigarh Road) Others Near Sharu Steel Phase-VII 68.60 67.57 Ganpati Construction B/br/2009/275 28/02/2009 3 100.00 49.25 49.25 18.32
233 B B4 13 ongoing cq mw br Repair and Maintenance of market area in Block A, Urban estate Phase-2, Ludhiana PCC Jamalpur Phase-I, Urban Estate 14.05 12.64 Inderjeet Builder B/br/2011/65 04/07/2011 2 100.00 12.28 12.28 0.36
234 B B4 13 ongoing cq mw br Development of 2 nos park in phase II Urban estate jamalpur Near Dy.Mayor Residence Parks Phase II Urban estate jamalpur Near Dy.Mayor Residence 9.26 6.58 Ram Parkash Kakkar B/br/2011/126 27/07/2011 3 100.00 6.58 6.58 0
235 B B4 13 ongoing cq nw br Construction of 3 no. Park in 34 Focal Point W.No.13 Parks Focal Point Phase-VIII 32.17 28.25 Rai Construction Co. B/br/2011/107 27/07/2011 4 100.00 12.62 0.00 28.25
236 B B4 13 ongoing cq nw br Construction of central Verge from Aarti Steel to Gurudwara Phase-I & 2 Jamalpur,ludhiana. Others Aarti Steel to Gurudwara Phase-I & 2 Jamalpur,ludhiana. 25.06 22.01 Samridhi Const. Co. B/br/2011/48 27/06/2011 4 100.00 22.01 22.01 0
237 B B4 13 ongoing cq nw br Repair & Painting of various Parks in Ward No.13 Parks Various parks in W-13 87.17 65.69 Ram Parkash Kakkar B/br/2013/13 04/12/2013 5 100.00 66.00 25.30 40.39
238 B B4 13 ongoing cq nw br Laying BM & PC on road from CHD. Road to Jeevan Nagar Tubewell (Veer Palace Road) W-13 Tubewell12.5HP CHD. Road to Jeevan Nagar Tubewell (Veer Palace Road) 43.99 33.74 Sunil Kumar B/br/2014/36 28/01/2014 3 100.00 29.45 0.00 33.74
239 B B4 13 ongoing cq nw br Const of Central Verge on Veer Palace road from Chandigarh road to Roackman cycle Ltd. Others Veer Palace Road 27.49 27.74 Ludhiana Const Co. B/br/2011/91 G-33/ZB 26/07/2011 4 100.00 27.74 27.74 0
240 B B4 13 ongoing cq nw br Laying 80 mm thick Interlocking Tiles adjoining DCM School, Phase-I urban Estate,Jamalpur. ILT80 Jamalpur Phase-I, Urban Estate 16.65 13.85 SONA ENTERPRISES B/br/2013/24 31/12/2013 3 100.00 11.21 0.00 13.85
241 B B4 13 ongoing cq nw br Laying BM & PC on Road near Dr.Usha Sacchar House Phase-II, Jamalpur BMPC Phase-II, jamalpur 4.37 3.48 Sunil Kumar B/br/2014/25 28/01/2014 3 100.00 2.08 0.00 3.48
242 B B4 13 ongoing cq nw br Laying 60mm thick Interlocking tiles of side road berm of Urban Estate Phase-II Jamalpur W No.13 ILT60 Urban Estate Phase-II 52.97 42.18 Ashok Kumar Sobti B/br/2015/20 31/08/2015 4 100.00 47.20 0.00 42.18
243 B B4 13 ongoing gq nw br Prov/laying of 12" and 16" dia sewer line in various areas of w.no 13 & 14 Sewage various areas of w.no 13 & 14 45.30 31.65 M/s Ashok Kumar Sobti B/br/2016/09/G33 11/04/2016 6 0.00 0.00 0.00 31.65
244 B B4 13 ongoing other nw br Const. of Road by laying BM & SDBC from Chandigarh road to Jeevan Nagar main road at Hari Singh Nagar SDBC W No.13 56.48 53.94 M/s IHR Associates B/br/2016/71 04/05/2016 3 40.00 19.53 0.00 53.94
245 B B4 13 ongoing other nw br Const. of RCC Road by laying RMC (M-30) Opp. Hero Gate Park in the area of 34 acre scheme of Phase-VIII Focal Point R-RMC W. No.13 53.85 46.78 M/s IHR Associates B/br/2016/54 22/04/2016 3 90.00 0.00 0.00 46.78
246 B B4 13 ongoing other nw br Const. of Road by laying SDBC in Urban Estate Phase-II , Jamalpur near UPSE jain School (Part II) W. No.13 SDBC W No.13 73.98 70.65 Sh Sunil KUmar Contractor B/br/2016/72 04/05/2016 3 90.00 0.00 0.00 70.65
247 B B4 13 ongoing other nw br P/F 80mm thick Interloicking tiles paver block M-40 grade in streets of GTB Nagar & Paramjit Colony W No.13 ILT80 Paramjit Colony 66.96 57.36 Sh Kulbhushan sharma B/br/2016/223 07/12/2016 3 100.00 57.36 0.00 57.36
248 B B4 13 ongoing gq nw br P/F 50mm thick Interlocking tiles paver block M-30 grade on central verge from Metro to Veer Palace Road on Gurudwara Main road W No.13 (Revised Est) ILT60 W No.13 15.38 13.43 The Dharour Co-Op L/c Society Ltd. B/br/2016/186 27/07/2016 1 100.00 13.40 0.00 13.43
249 B B4 13 ongoing gq nw br Const of road by laying RCC RMC (M-30) opp C-116 (Roxi International), in Phase V, Focal Point W No.14 R-RMC W No.14 122.21 96.63 M/s Glisten B/br/2017/18 26/09/2017 4 80.00 15.65 54.65 41.98
250 B B4 13 ongoing gq nw br Annual Rate Contract for Maintenance of water Supply & Sewerage Lines and Purchase of Material for W. No. 23 New Sewage W. No. 23 4.20 3.62 The Premier Co-op L&C Society Ltd. B/br/2018/70/G33 21/09/2018 12 0.00 0.00 0.00 3.62
251 B B4 14 ongoing cq nw br Construction of road of village Nichi Mangli Others Nichi Mangli 7.68 7.72 Apex Builder B/br/2011/118 27/07/2011 3 100.00 6.63 6.63 1.09
252 B B4 14 ongoing gq nw br Construction of New Mettaled Road Behinde D-147 to 153 Focal Point Phase 4A, Ludhiana BMPC Near 100' Road, Phase-IV 37.38 32.23 Soham Construction Co. B/br/2011/40 08/06/2011 3 100.00 14.54 14.70 17.53
253 B B4 14 ongoing cq nw br Construction of 3 nos park in phase-4 A Focal Point, Ludhiana Parks Phase-IV A 28.38 26.96 C.J Builders B/br/2011/47 27/06/2011 4 100.00 19.40 17.36 9.6
254 B B4 14 ongoing mlaq nw br Reconditioning of road from Focal Point Phase-VII to Gobindgarh Railway crossing( Sua Road) BMPC Gobindgarh, Phase-VII 69.30 52.36 Shiva Construction B/br/2011/106 27/07/2011 4 100.00 57.86 57.86 -5.5
255 B B4 14 ongoing cq nw br Laying DBOE in Choudary Colony in Gobindgarh Others Choudary Colony in Gobindgarh 13.04 13.04 Parminder Singh B/br/2009/228 26/02/2009 2 100.00 12.90 12.90 0.14
256 B B4 14 ongoing gq nw br Construction of RCC (RMC) Road from Fire Brigade Road to Jiwan Nagar Focal Point,Ludhiana. R-RMC Fire Brigade Road 104.67 92.93 ESS ESS Builders B/br/2011/100 27/07/2011 5 100.00 84.43 84.43 8.5
257 B B4 14 ongoing cq nw br Re-Conditioning of Road from Phase-VII to Gobindgarh BMPC Phase-VII to Gobindgarh 50.41 39.37 Shiva Construction B/br/2011/96 27/07/2011 4 100.00 43.80 43.80 -4.43
258 B B4 14 ongoing gq mw br Strengthening of Roads of Phase VI of W.No.14 Focal Point Part II BMPC Focal Point Phase-VI 85.15 83.87 Apex Builder B/br/2009/298 28/02/2009 4 100.00 93.10 93.10 -9.23
259 B B4 14 ongoing cq mw br Laying PCC in Street No.1 to 14 of Vishkarma colony,Ludhiana. PCC Vishkarma Colony 31.82 20.93 H.K Construction B/br/2011/215 14/11/2011 3 100.00 11.60 11.60 9.33
260 B B4 14 ongoing mlaq mw br Laying Mix Seal of Road Durga Colony Road (site Changed to Backside along Aarti Steel Links) BMPC Aarti Steel Links 27.70 26.60 Narinder Kumar & Co. B/br/2010/46 13/08/2010 4 100.00 26.60 26.60 0
261 B B4 14 ongoing cq nw br Repair & Maintance of Park in Dhandari Khurd Parks Park in Dhandari Khurd 4.16 3.95 Khullar Brothers B/br/2011/85 21/07/2011 2 100.00 3.56 3.56 0.39
262 B B4 14 ongoing cq nw br Laying BM & PC up to D 210 to 228 Service Road Focal Point BMPC D 210 to 228 Service Road Focal Point Phase-VII 15.60 15.36 Dass Builders B/br/2009/286 28/02/2009 2 100.00 10.26 10.26 5.1
263 B B4 14 ongoing cq nw br Const of streets with RMC (M-20 Grade) in area of SubZone B4 RMC4 Near Railway Line, Dhandari Khurd 67.59 58.73 Kabir Infra Structure Pvt. Ltd. B/br/2013/6 04/12/2013 4 100.00 59.81 33.17 25.56
264 B B4 14 ongoing cq nw br Const of RCC Road (RMC M-30 Grade) from Dhandari Khurd to Ishwar Colony R-RMC Dhandari Khurd to Ishwar Colony 99.96 87.41 Inderjit Bajaj B/br/2013/8 04/12/2013 6 100.00 74.12 39.81 47.6
265 B B4 14 ongoing cq nw br Repair & Painting of 10 Nos. Park in Ward No.14 Parks Area Adjoining Metro Road 29.81 22.64 Ram Parkash Kakkar B/br/2013/10 04/12/2013 3 100.00 18.09 0.00 22.64
266 B B4 14 ongoing cq nw br Const. of Boundry Wall & Fixing of MS Grill & Benches in the Park/Green Belt of Focal Point Phase-VII near D-228 to D-210 in W-14. Parks Focal Point Phase-VII near D-228 to D-210 in W-14. 36.66 25.66 Aglow Builders B/br/2014/28 28/01/2014 3 100.00 23.95 6.66 19
267 B B4 14 ongoing cq nw br Recond. of road from Village Dhandhari Khurd to Sua Road Ludhiana. BMPC Zone-B 64.90 50.64 Shiva Constructions B/br/2011/99 27/07/2011 4 100.00 6.62 0.00 50.64
268 B B4 14 ongoing cq nw br Const. of RCC roads (RMC M-30 grade) adjoining kangaroo Industry Phase-IV RMC6 Zone-B 79.91 70.45 Inderjeet Bajaj B/br/2013/5 04/12/2013 6 100.00 56.78 0.00 70.45
269 B B4 14 ongoing cq nw br Laying 6" thick RMC M-30 from village Dhandari Khurd to Sua Road W-14, Ludhiana RMC6 From village Dhandari Khurd to Sua Road 99.96 79.26 Ess Ess Builders B/br/2014/4 10/09/2014 6 50.00 0.00 0.00 79.26
270 B B4 14 ongoing cq nw br Dev. of Park infront of C-84 Focal Point Phase-V W No.14 Parks Focal Point Phase-V 19.79 18.18 M/s Rajowal Co-Op L/C Society Ltd. (Rajowal) B/br/2015/11 11/03/2015 3 100.00 18.16 0.00 18.18
271 B B4 14 ongoing gq nw br Const. of RCC Road by laying RMC (M-30) from Aarti Steel to Kangaroo Industry on Metro Road Focal Point RMC6 Metro Road 273.80 231.90 Ceigall India Ltd. B/br/2015/27 24/09/2015 4 60.00 88.15 0.00 231.9
272 B B4 14 ongoing gq nw br Const. of road by laying DBM & SDBC from Kangaroo Industry to Chandigarh Road on Metro Road DBM Metro Road 200.86 151.00 J.K Infocon B/br/2015/28 24/09/2015 4 100.00 151.74 105.25 45.75
273 B B4 14 ongoing gq nw br Const. of road by laying DBM & SDBC from Aarti Steel to Dhandari Railway Bridge on main focal point road DBM Main Focal Point Road 225.67 170.08 J.K Infocon B/br/2015/29 24/09/2015 5 100.00 167.91 112.30 57.78
274 B B4 14 ongoing gq nw br Const. of RCC Road by laying RMC (M-30) from Dhandari Railway Bridge to Metro Unit IV Focal Point RMC6 Metro Unit-IV Focal Point 184.84 156.55 J.B & Co. B/br/2015/32 24/09/2015 3 70.00 79.86 0.00 156.55
275 B B4 14 ongoing cq nw br Construction of park near E-369 (Puneet Cycle) in W No.14 (Revised) Others Park near E-369 41.57 38.73 The Samrala Co-Op L/C Society B/br/2016/144 30/05/2016 2 100.00 7.99 30.72 8.01
276 B B4 14 ongoing other nw br Providing & laying 80mm thick Interlocking Tiles/paver block M-40 grade in streets of mohalla Muslim Colony (Part A) W No.14 ILT80 W No.14 67.61 57.09 Sh Varinder Singh B/br/2016/21 18/04/2016 3 80.00 0.00 0.00 57.09
277 B B4 14 ongoing other nw br Laying of RMC( M-20) in streets of Mohalla Vishkarma Colony (Part-2) W-14 (45.16) and Const. of Road by laying RMC( M-20) in streets of LIG (Labour Colony) W No.14(34.82) RMC4 W No.14 79.98 66.39 M/s Capital Const. Co. B/br/2016/157 02/06/2016 4 95.00 0.00 0.00 66.39
278 B B4 14 ongoing other nw br Const. of Road by laying SDBC in streets of Mohalla HM Colony W No.14 (36.15) and Construction of Road by laying BM & SDBC from Metro Road to Vishkarma Chowk in W No.14 (23.73) SDBC W No.14 59.88 57.19 Sh Sunil KUmar Contractor B/br/2016/74 04/05/2016 3 83.00 23.60 16.34 40.85
279 B B4 14 ongoing cq nw br Const. of Road by laying BM & SDBC from Sua road to Dhandari Railway Line W No.14 SDBC W No.14 64.48 61.58 M/s VKBS Const. Co. B/br/2016/75 04/05/2016 3 25.00 15.42 0.00 61.58
280 B B4 14 ongoing other nw br Laying RMC in different streets of W No.14 (Part-1) (150.22 Lacs) Const. of road by Laying of RMC-M 20 in streets of Vishkarma Colony (Part-1) of W-14 at Ludhiana (19.40) Const. of RCC Road by laying RMC (M-30) from Majestic Chowk to the road joining to Vishavnath mandir to Jeevan Nagar chowk Phase V Focal Point.(130.82) RMC4 W No.14 150.22 128.80 M/s Capital Const. Co. B/br/2016/130 30/05/2016 4 70.00 16.21 55.04 73.76
281 B B4 14 ongoing other nw br Laying RMC in different streets of W No.14 (Part-2) (95.89 Lacs) Const. of RCC Road by laying RMC (M-30) in area of C-279 from Ganpati Chowk to Main focal point Phase-VI W No.14 RMC4 W No.14 95.89 84.14 M/s RHG Construction B/br/2016/134 30/05/2016 3 88.00 40.25 26.28 57.86
282 B B4 14 ongoing other nw br Renovation of park near Vishawnath Mandir W No.14 Others Park 24.25 23.17 M/s The Khairey Co-Op L&C Society B/br/2016/173 23/06/2016 2 100.00 23.17 0.00 23.17
283 B B4 14 ongoing other nw br Construction of park in Phase VII focal point near D-229 W No.14 Parks W No.14 16.45 15.72 M/s The Khairey Co-Op L&C Society B/br/2016/172 23/06/2016 1 95.00 15.66 0.00 15.72
284 B B4 15 ongoing gq nw br Laying Bm & PC on Road of Choundhary Colony BMPC Choundhary Colony 29.41 26.86 Apex Builder B/br/2012/24 04/07/2012 2 100.00 26.86 26.86 0
285 B B4 15 ongoing cq nw br Repair of Roads of Mohindra Colony,Ludhiana. BMPC Mohindra Colony 30.70 26.72 Sunil Kumar B/br/2011/182 16/11/2011 3 100.00 26.72 26.72 0
286 B B4 15 ongoing cq nw br Laying PCC in Streets of New Moti Nagar PCC New Moti Nagar 40.65 27.38 Jyoti Builders B/br/2011/226 15/12/2011 3 100.00 27.38 27.38 0
287 B B4 15 ongoing cq nw br Repair & Mtc of Park Near Vardhman Chowk and Near B.V.M School Sect-39,Ludhiana. Parks Vardhman Chowk 9.78 6.84 Ram Parkash Kakkar B/br/2011/124 27/07/2011 4 100.00 6.84 6.84 0
288 B B4 15 ongoing cq nw br Reapir & Mtc. Of Parks of Mohindra Colony W.No.15 Parks Mohindra Colony 5.61 3.93 Ram Parkash Kakkar B/br/2011/125 27/07/2011 4 100.00 3.93 3.93 0
289 B B4 15 ongoing cq nw br Development of 3 nos Park in Sector-39 Near baba Jaswant Singh Dental College Parks Near baba Jaswant Singh Dental College 8.38 5.94 Ram Parkash Kakkar B/br/2011/143 27/07/2011 5 100.00 5.94 5.94 0
290 B B4 15 ongoing cq nw br Construction of RCC road from Everest School Moti Nagar to Jain Mandir Sector 39 RMC4 Everest School Moti Nagar to Jain Mandir Sector 39 83.66 67.83 Kabir Const. Co. B/br/2012/8 15/05/2012 4 100.00 67.83 67.83 0
291 B B4 15 ongoing cq nw br Reapir of Park Near Everest School At Moti Nagar,Ludhiana. Parks Near Everest School At Moti Nagar,Ludhiana. 5.94 5.64 Puran Chand Mahajan B/br/2010/120 23/12/2010 2 100.00 5.64 5.64 0
292 B B4 15 ongoing mlaq nw br Widening of road by Laying PC on Road of Sector 39 Part 1 BMPC Sector 39 102.29 97.18 Baba Premix & Infra Structure (P) Ltd. B/br/2010/133 30/12/2010 6 100.00 97.18 70.00 27.18
293 B B4 15 ongoing cq nw br Laying PCC in Street No.1,2 & Links Heera Nagar (50%) PCC Street No.1,2 & Links Heera Nagar 37.74 33.96 Mahesh Sharma B/br/2011/7 05/05/2011 3 100.00 33.96 33.96 0
294 B B4 15 ongoing cq nw br Reconditioning of Road of Moti Nagar Near Everest School,Ludhiana. RMC4 Road of Moti Nagar Near Everest School 13.38 12.94 Sham Sunder B/br/2008/90 17/11/2008 1 100.00 12.94 12.94 0
295 B B4 15 ongoing cq nw br Laying BM & PC on Road of Heera Nagar,Ludhiana. BMPC Heera Nagar 31.56 30.77 Sham Sunder B/br/2008/91 17/11/2008 2 100.00 30.77 30.77 0
296 B B4 15 ongoing cq nw br Construction of park near bharti Vidya Mandir Sector -39,Ludhiana. Parks Sector -39 6.49 5.11 Apex Builders B/br/2011/223 14/12/2011 1 100.00 5.11 5.11 0
297 B B4 15 ongoing cq nw br Construction of road by laying RMC from Ambala road to moti nagar at Saini Colony RMC4 Saini colony 61.82 53.24 Kabir Construction Co. B/br/2011/212 13/12/2011 3 100.00 43.24 43.24 10
298 B B4 15 ongoing cq nw br Laying BM & PC on Swarn Palace Road & Links W-15 BMPC Swarn Palace Road & Links 45.39 33.33 Sunil Kumar B/br/2014/29 28/01/2014 3 100.00 26.90 0.00 33.33
299 B B4 15 ongoing cq nw br Reconditioning of road by laying RMC M-30, Saini Colony W-15 RMC6 Saini Colony 45.14 37.62 Manmohan Singh B/br/2014/32 28/01/2014 3 100.00 33.51 0.00 37.62
300 B B4 15 ongoing cq nw br Repair of Mini Rose Garden Sector -39 Ward No. 15. Parks MINI ROSE GARDEN 20.03 19.01 SAHARAN MAJRA CO-OP L/C B/br/2014/60 28/02/2014 2 70.00 8.87 0.00 19.01
301 B B4 15 ongoing cq nw br Laying 60mm thick interlocking tile of side road berm of sec- 39 Others SEC-39 99.78 82.23 Teg Builders B/br/2014/50 13/02/2014 6 100.00 72.66 0.00 82.23
302 B B4 15 ongoing cq nw br Repair of Park near Everest School Moti Nagar Parks Everest School Moti Nagar 5.94 5.64 Puran Chand Mhajan B/br/2010/120 23/12/2010 2 100.00 5.64 4.34 1.3
303 B B4 15 ongoing cq nw br Const. of RCC road opp. Mandir Sec 39 R-RMC Sec-39 49.07 39.26 LRY labour contractor B/br/2011/222 14/12/2011 3 100.00 3.73 0.00 39.26
304 B B4 15 ongoing gq nw br Const. of road by laying RMC M-30 in Sector-39 backside Councillor Mandeep Kaur Sandhu residence RMC6 Sec 39 63.67 51.78 Rajesh Kumar Sood B/br/2015/21 31/08/2015 4 100.00 51.79 0.00 51.78
305 B B4 15 ongoing gq nw br Renovation of park backside Gurudwara Sahib W No.15 Others Backside Gurudwara Sahib 12.77 11.48 The Khairay Co-Op Labour & const Society B/br/2016/174 23/06/2016 1 95.00 9.35 0.00 11.48
306 B B4 15 ongoing other nw br Laying 4" thick RMC( M-20) in streets of backside of Gurudwara Sahib Sec -39 RMC4 W No.15 36.66 35.19 M/s The Ghanghas Co-Op L& C Society B/br/2016/91 16/05/2016 2 95.00 7.63 25.76 9.43
307 B B4 15 ongoing other nw br P/F 60mm thick Interlocking Tiles/paver block M-35 grade on side berms in streets of Mohalla Moti Nagar Block-A W No.15 ILT60 W No.15 38.95 37.39 M/s The Rajjowal Co-Op L & C Society B/br/2016/88 16/05/2016 2 85.00 30.84 23.00 14.39
308 B B4 15 ongoing other nw br Laying RMC (M-20) in streets of New Moti Nagar W No.15(Part-I) RMC4 W No.15 70.78 57.34 Sh Rajesh KUmar Sood B/br/2016/24 18/04/2016 3 75.00 9.30 30.83 26.51
309 B B4 15 ongoing other nw br Const. of Road by laying RMC( M-20) in streets of mohalla Aariya Colony W No.15 RMC4 W No.15 48.77 43.36 M/s Kohinoor Builders B/br/2016/52 22/04/2016 3 90.00 0.00 0.00 43.36
310 B B4 15 ongoing other nw br Const. of Road by laying SDBC in the area of Mohindra Colony W. No.15 SDBC W No.15 26.72 25.52 Sh Sunil KUmar Contractor B/br/2016/76 04/05/2016 2 90.00 0.00 0.00 25.52
311 B B4 15 ongoing other nw br Laying RMC in different streets of W No.15 (Part-2) (189.89 Lacs) Const. of Road by laying RMC( M-20) in streets of Sec-39 opp Gurudwara Guru Ram Dass ji W No.15 (46.39) and Laying RMC( M-20) in streets of Moti Nagar Block A W-15 at Ludhiana (65.98) and Const. of street by laying RMC( M-20) of Sec-39 opp Baba Jaswant Singh College W No.15 (77.52) RMC4 W No.15 189.89 159.64 M/s Teg Builders B/br/2016/131 30/05/2016 5 70.00 0.00 0.00 159.64
312 B B4 15 ongoing other nw br Laying RMC in different streets of W No.15 (Part-1) (164.51 Lacs) Const. of road by laying RMC( M-30) in Heera Nagar (Part-I) W No.15(48.39)and Const. of road by laying RMC( M-30) in Heera Nagar (Part-II) W No.15 (34.69)and Laying RMC (M-20) in streets of New Moti Nagar W No.15(Part-II) (81.43) RMC4 W No.15 164.51 142.88 M/s RHG Construction B/br/2016/132 30/05/2016 5 95.00 123.66 120.07 22.81
313 B B4 15 ongoing cq nw br Laying RMC( M-20) in streets of Sec 39 Opp DCM School W No.15 RMC4 W No.15 68.21 59.25 Sh Varinder Singh B/br/2016/224 07/12/2016 3 70.00 39.97 0.00 59.25
314 B B4 15 ongoing gq nw br Const. of Guru Ravidas Dharamshalla in Sherpur Kalan W No.15 Others W No.15 5.00 4.95 M/s The Dharour Society Ltd. B/br/2016/247 26/12/2016 1 100.00 4.95 0.00 4.95
315 B B4 15 ongoing gq nw br Const. of room in Govt. School of Sherpur Kalan W No.15 Others W No.15 3.00 2.91 M/s The Dharour Society Ltd. B/br/2016/245 26/12/2016 1 100.00 2.91 0.00 2.91
316 B B4 15 ongoing gq nw br Construction/Renovation of various parks in Railway Colony & Mohindra Colony & New Moti Nagar W No.15 (47.22) and P/F 60mm thick Interlocking tiles paver block M-35 grade on side berms of road from Everest school to Vardhman Chowk W No.15 (45.52) Others W No.15 92.74 72.40 Teg BUilders B/br/2017/7 18/05/2017 4 75.00 14.34 38.73 33.67
317 B B4 16 ongoing cq nw br Laying BM & PC on Road of Sherpur Khurd BMPC Adjoining Sherpur MC office 37.77 30.20 I.H.R. Associate B/br/2011/214 13/12/2011 3 100.00 28.43 28.43 1.77
318 B B4 16 ongoing cq nw br Laying BM & PC on road Near Mall Godown ,Ludhiana. BMPC Nall Godown at Focal Point 13.20 11.62 I.H.R. Associate B/br/2012/5 15/05/2012 2 100.00 11.92 11.92 -0.3
319 B B4 16 ongoing gq nw br Laying BM & PC on Rana Gas Road & Links of Ranjit Nagar,Ludhiana. BMPC Rana Gas Road, Links of Ranjit Nagar 16.95 14.73 S.K. Const. Co. B/br/2012/12 18/05/2012 2 100.00 10.09 10.09 4.64
320 B B4 16 ongoing gq nw br Development of cremation ground at sherpur khurd Others Cremation ground at sherpur khurd 8.88 8.35 LRY Labour Constructor B/br/2011/213 13/12/2011 1 100.00 6.30 4.64 3.71
321 B B4 16 ongoing other nw br Construction of Dharamshala hall in Sherpur Khurd Others Dharamshala hall in Sherpur Khurd 14.30 14.34 Ludhiana Const.. cO. B/br/2010/134 30/12/2010 2 100.00 14.08 14.08 0.26
322 B B4 16 ongoing cq nw br Const. of Dharmshalla in Baba Deep Singh Nagar Ldh Others Baba Deep Singh Nagar 28.11 27.08 Sh. Varinder Singh B/br/2012/27 27/08/2012 3 90.00 27.52 0.00 27.08
323 B B4 16 ongoing cq nw br Const of RCC Road (RMC M-30 Grade) in area of Sub Zone B2 Ward No.16 R-RMC Cancer Hospital Road 71.86 64.53 Narinder Kumar & Co. B/br/2013/7 04/12/2013 5 100.00 52.03 0.00 64.53
324 B B4 16 ongoing cq nw br Construction of Park at Baba Deep Singh Nagar W-16 Parks Baba Deep Singh Nagar 5.73 4.35 Aglow Builders B/br/2014/30 28/01/2014 1 0.00 0.00 0.00 4.35
325 B B4 16 ongoing gq nw br Const of room in Shahid Bhagat singh Colony Welfare Society Reg Moti Nagar W No.16 Others W No.16 3.00 2.97 The Dharour Society Ltd. B/br/2016/246 29/12/2016 1 100.00 2.97 0.00 2.97
326 B B4 16 ongoing cq nw br P/F 60mm thick Interloicking tiles paver block M-35 grade in Village Sherpur Kalan W No.14 (33.65) & Laying RMC( M-30) in various streets of Kailash Nagar & Sherpur Opp. Rana gas W No.16 (61.27) ILT60 W No.16 94.92 76.88 M/s Gupta Contractors Pvt. Ltd. B/br/2016/234 20/12/2016 3 75.00 53.63 0.00 76.88
327 B BG B_General ongoing gq nw br Construction of truck Parking in Transport Nagar Backside G.T Road Gurudwara Part-A Others Transport Nagar Backside G.T Road Gurudwara 55.35 52.57 Kabir Const.co B/br/2009/171 18/02/2009 3 80.00 5.00 0.00 52.57
328 B BG B_General ongoing gq nw br Const. of RCC Road by laying RMC (M-30) from Vardhman chowk upto Jain Mandir (Everest School road) and Const. of RCC Road by laying RMC (M-30) at starting from Main Focal Point Road upto Giaspura Phatak in W No.16 BMPC Const. of RCC Road by laying RMC (M-30) from Vardhman chowk upto Jain Mandir (Everest School road) and Const. of RCC Road by laying RMC (M-30) at starting from Main Focal Point Road upto Giaspura Phatak in W No.16 180.44 152.83 J.B & Co. B/br/2015/26 15/09/2015 3 90.00 154.00 0.00 152.83
329 B BG B_General ongoing gq nw br PURCHASE OF DIFF. MATERIAL FOR CENTRAL STORE B&r LUDHIANA Others CENTRAL STORE B&R 57.38 46.91 CAPITAL CONSTRUCTION CO. B/br/2012/10 17/10/2012 3 100.00 21.30 21.30 25.61
330 B BG B_General ongoing gq nw br PROCUREMENT OF ENAMEL PAINT SUPER SNOWCEM & OTHER PAINTING MATERIAL FOR CENTRAL STORE B&R LUDHIANA Others CENTRAL STORE B&R 42.47 28.49 CAPITAL CONSTRUCTION CO. B/br/2012/28 16/11/2012 3 100.00 25.91 13.79 14.7
331 B BG B_General ongoing cq nw br PROCUREMENT OF ENAMEL PAINT SUPER SNOWCEM & OTHER PAINTING MATERIAL FOR CENTRAL STORE B&R LUDHIANA BMPC CENTRAL STORE B&R 47.61 37.84 ASHOK KUMAR SOBTI B/br/2013/34 28/02/2013 1 100.00 32.09 6.59 31.25
332 B BG B_General ongoing gq nw br SUPPLY OF RCC GRILL CENTRAL STORE LUDHIANA Others CENTRAL STORE B&R 9.76 8.30 SURYA CONST. CO. B/br/2013/35 28/02/2013 1 100.00 9.12 7.50 0.8
333 B BG B_General ongoing gq nw br PROCUREMENT OF 60MM CEMENT CONCRETE PAVER BLOCK & KERB STONE FOR CENTRAL STORE B&R Others CENTRAL STORE B&R 29.57 18.85 M/s Singla & Co. B/br/2013/44 08/10/2013 1 100.00 15.27 3.41 15.44
334 B BG B_General ongoing gq nw br PROCUREMENT OF DIFF. MATERIAL FOR CENTRAL STORE B&R Others CENTRAL STORE B&R 84.80 69.50 TEG BUILDERS B/br/2013/45 18/11/2013 2 100.00 73.35 65.25 4.25
335 B BG B_General ongoing gq nw br Repair & maintenance of work of various wards in zone B Others Area of Zone B 44.57 38.95 Rajesh Kumar Sood B/br/2013/1 17/04/2013 6 100.00 0.00 0.00 38.95
336 B BG B_General ongoing gq nw br Const of filth Depot Garbage collection in Zone B ludhiana Others Area of Zone B 25.84 20.23 Rajesh Kumar Sood B/br/2013/33 15/01/2013 3 100.00 0.00 0.00 20.23
337 B BG B_General ongoing gq nw br Const of Suwidha Centre & Addition rooms at sub zonal office building Zone B Others Zone B 52.48 50.84 Asis Builders B/br/2013/4 02/09/2013 3 100.00 14.03 32.00 18.84
338 B BG B_General ongoing gq nw br Repair & Maintenance work of Various Wards of different Sub Zones of Zone- B1 Others Area of Sub Zone B1 29.60 27.61 Soham Const. Co. B/br/2014/46 12/02/2014 6 100.00 24.86 0.00 27.61
339 B BG B_General ongoing gq nw br Repair & Maintenance work of Various Wards of different Sub Zones of Zone- B2 Others Area of Sub Zone B2 14.97 13.47 Soham Const. Co. B/br/2014/43 12/02/2014 6 100.00 13.50 5.43 8.04
340 B BG B_General ongoing gq nw br Repair & Maintenance work of Various Wards of different Sub Zones of Zone- B3 Others Area of Sub Zone B3 10.96 10.17 HARKIRAT SINGH B/br/2014/52 28/02/2014 6 100.00 10.68 5.19 4.98
341 B BG B_General ongoing gq nw br Repair & Maintenance work of Various Wards of different Sub Zones of Zone- B4 Others Area of Sub Zone B4 18.27 16.73 Durga Const. Co. B/br/2014/61 28/02/2014 3 100.00 18.38 7.54 9.19
342 B BG B_General ongoing cq nw br Const. of unified citizen service delivery centre(Sewa Kender Type-II) at various places in the area of MC Ludhiana. Others Zone B(B&R) 56.76 52.01 Durga Const. Co. B/br/2015/8/G-33/ZB 23/01/2015 2 100.00 56.76 51.74 0.27
343 B BG B_General ongoing cq nw br Laying BM & PC on RK Road to Kabir Road Ward No. 17 BMPC Laying BM & PC on RK Road to Kabir Road Ward No. 17 35.72 27.98 S.K. Const Co. B/br/2014/45/G-33 B&R 12/02/2014 3 100.00 28.47 0.00 27.98
344 B BG B_General ongoing gq nw br Annual Rate contract for maintenance of w/s and sewage system and P/O Material for W.no10,11 &12 Others W.no 10,11, & 12 27.00 22.14 The Rajowal co-op L&C Society Ltd. B/br/2015/21/G33 26/06/2015 12 0.00 0.00 0.00 22.14
345 B BG B_General ongoing gq nw br Annual Rate contract for maintenance of w/s and sewage system and P/O Material for W.no 43,13,14,15 & 16 Others W.no 43,13,14,15 & 16 45.00 33.75 M/S Varinder Singh B/br/2015/22/G33 26/06/2015 12 0.00 0.00 0.00 33.75
346 B BG B_General ongoing gq nw br Annual Rate contract for maintenance of w/s and sewage system and P/O Material for W.no17,18,40,41 & 42 Others W.no 17,18,40,41 & 42 45.00 36.65 M/S Varinder Singh B/br/2015/23/G33 26/06/2015 12 0.00 0.00 0.00 36.65
347 B BG B_General ongoing gq mw br Annual Rate contract for maintenance of w/s and sewage system and P/O Material for W.no 43,13,14,15 & 16 Others W.no 43,13,14,15 & 16 45.00 33.75 M/S Varinder Singh B/br/2015/22/G33 26/06/2015 12 0.00 0.00 0.00 33.75
348 B BG B_General ongoing cq nw br Const. of Unified Citizen Service Delivery Centre (Sewa Kender Type-II) at various places in the area of Municipal Corporation, Ludhiana. Others MC Ludhiana 5.17 5.07 The Rajowal Co-Op L/C Society Ltd B/br/2015/15 08/05/2015 1 5.00 0.00 0.00 5.07
349 B BG B_General ongoing cq nw br “Internal Furnising of newly constructed Unified Citizen Services Delivery Centre ( Sewa Kender Type–II of Rs. 5.17 Lacs (each) in Zone B. 1.Suffian Chowk Adjoining Dargarh on Kidwai Nagar, main road. 2.Municipal Corporation office Sub Zone B-4, Nr.Sherpur Chowk. 3.Municipal Corporation office Sub Zone B-4 (O & M ) on Metro Road. 4.In adjoining park near Police Chowky on Tajpur road. Others MC Ludhiana 20.68 19.37 The Samrala Co-Op L/C Society B/br/2015/16 05/07/2015 1 100.00 20.26 10.05 9.32
350 B BG B_General ongoing cq nw br Const of Night Shelter at Moti Nagar Others Moti Nagar 84.65 66.76 Capital Const Co. B/br/2015/31 24/09/2015 4 45.00 26.88 39.88 26.88
351 B BG B_General ongoing gq nw br Rejuvenation of road from Gupta Chowk to Shiv Chowk on RK Road Others RK road 391.64 302.54 IHR Associates B/br/2015/25 15/09/2015 5 100.00 56.18 233.09 69.45
352 B BG B_General ongoing cq nw br P/F of speed Bumps in W-11 Others W No.11 3.00 2.91 M/s Ganesh Traders B/br/2015/22 31/08/2015 1 100.00 2.85 0.00 2.91
353 B BG B_General ongoing cq nw br Providing Platform for dumping garbage in the area of Zone-B BMPC Zone B 3.24 2.90 The Samrala Co-Op Society Ltd. B/br/2015/18 21/08/2015 1 10.00 0.00 0.00 2.9
354 B BG B_General ongoing gq nw br Rejuvenation of road from Gupta Chowk to Shiv Chowk on R.K. Road Others Zone-B 391.95 243.29 IHR Associates B/br/2015/25 15/09/2015 5 50.00 188.00 35.00 208.29
355 B BG B_General ongoing cq nw br Repair and Maintenance of Mini rose Garden ward 41 Parks Mini Rosa Garden 1.88 1.86 The Rajowal Co-op L/C Society Ltd B/br/2015/41/G-33 21/10/2015 2 100.00 1.83 0.00 1.86
356 B BG B_General ongoing cq nw br Construction of Road by laying 30mm thick SDBC from Shiv Vihar (Fish Chowk) to Dr. Karam Singh Grewal road on Towerline no.5. SDBC Shiv Vihar 29.19 27.88 M/s JK Infoconn B/br/2016/56 04/05/2016 2 100.00 4.36 17.91 9.97
357 B BG B_General ongoing cq nw br P/F 80mm thick Interlocking tiles in street No.5, 6 and Other streets backside Bhawani Model School of Mohalla New Subhash Nagar Part-2 ILT80 P/F 80mm thick Interlocking tiles in street No.5, 6 and Other streets backside Bhawani Model School of Mohalla New Subhash Nagar Part-2 36.55 35.08 M/s The Gill Co-Op L&C Society B/br/2016/147 01/06/2016 2 60.00 20.06 0.00 35.08
358 B BG B_General ongoing gq nw br Const. of Road by laying BM & SDBC on main road from Tajpur road via road of EWS Colony upto Sabji Mandi road W No.7 SDBC Const. of Road by laying BM & SDBC on main road from Tajpur road via road of EWS Colony upto Sabji Mandi road W No.7 35.97 34.35 M/s CH Builders Pvt. Ltd. B/br/2016/58 04/05/2016 2 100.00 5.23 24.99 9.36
359 B BG B_General ongoing cq nw br Const. of Road by laying RMC( M-30) on Tibba road from Puneet Nagar to HP Gas Godown W No.07 RMC4 Const. of Road by laying RMC( M-30) on Tibba road from Puneet Nagar to HP Gas Godown W No.07 63.86 52.37 Sh Rajesh Kumar Sood B/br/2016/6 18/04/2016 3 70.00 37.56 0.00 52.37
360 B BG B_General ongoing gq nw br P/F 80mm thick Interlocking tiles in streets of Mohalla Grewal Colony Part A (33.47), P/F 80mm thick Interlocking tiles in streets of Raju Colony Part B.(32.74) ILT80 P/F 80mm thick Interlocking tiles in streets of Mohalla Grewal Colony Part A (33.47), P/F 80mm thick Interlocking tiles in streets of Raju Colony Part B.(32.74) 66.21 58.93 M/s Friends & Co. B/br/2016/154 02/06/2016 4 49.00 12.31 16.58 42.35
361 B BG B_General ongoing gq nw br Const. of Road by laying BM & BC from main Gopal Nagar road to Dyeing Industry via Mata Karam Kaur road.(33.74), Const. of Road by laying BM & PC from Tibba Police Chowky to Baba Namdev Colony.(32.58) BMPC Const. of Road by laying BM & BC from main Gopal Nagar road to Dyeing Industry via Mata Karam Kaur road.(33.74), Const. of Road by laying BM & PC from Tibba Police Chowky to Baba Namdev Colony.(32.58) 66.32 63.33 M/s Dass Builders Pvt. Ltd. B/br/2016/169 17/06/2016 3 50.00 10.05 19.34 43.99
362 B BG B_General ongoing gq nw br Providing & laying 80mm thick Interlocking Tiles/paver block M-40 grade in streets of mohalla Manjit Nagar.(44.57), P/F 80mm thick Interlocking tiles in streets of Mohalla Grewal Colony Part B.(50.67) ILT80 Providing & laying 80mm thick Interlocking Tiles/paver block M-40 grade in streets of mohalla Manjit Nagar.(44.57), P/F 80mm thick Interlocking tiles in streets of Mohalla Grewal Colony Part B.(50.67) 95.24 85.50 M/s Friends & Co. B/br/2016/37 22/04/2016 4 50.00 11.97 24.84 60.66
363 B BG B_General ongoing gq nw br P/F 80mm thick Interlocking tiles in streets of Mohalla Vijay Nagar Part B ILT80 P/F 80mm thick Interlocking tiles in streets of Mohalla Vijay Nagar Part B 76.90 70.75 Sh Ashok Kumar Sobti B/br/2016/39 22/04/2016 4 100.00 5.03 57.85 12.9
364 B BG B_General ongoing gq nw br Const. of Road by laying RMC( M-20) in streets of mohalla Ram Nagar W No.8 RMC4 Const. of Road by laying RMC( M-20) in streets of mohalla Ram Nagar W No.8 46.07 38.63 M/s CNC Precision Engineering B/br/2016/8 18/04/2016 3 40.00 8.07 7.09 31.54
365 B BG B_General ongoing gq nw br P/F 60mm thick Interlocking tiles in streets of mohalla Gita Nagar (Part B) ILT60 P/F 60mm thick Interlocking tiles in streets of mohalla Gita Nagar (Part B) 122.25 103.75 M/s Ramanjeet Singh & Co. B/br/2016/11 18/04/2016 5 100.00 5.25 101.17 2.58
366 B BG B_General ongoing gq nw br P/F 80mm thick Interlocking tiles in streets of Mohalla Gopal Nagar (Part A) ILT80 P/F 80mm thick Interlocking tiles in streets of Mohalla Gopal Nagar (Part A) 70.43 59.74 M/s Apex Developers B/br/2016/12 18/04/2016 4 100.00 1.28 58.22 1.52
367 B BG B_General ongoing gq nw br Providing & laying 80mm thick Interlocking tiles in various streets of W No.8 (Part-1) Providing & laying 80mm thick Interlocking Tiles/paver block M-40 grade in streets of mohalla New Company Bagh (Part-A) W No.8(21.79) and Providing & laying 80mm thick Interlocking Tiles/paver block M-40 grade in streets of mohalla Rishi Nagar (Part-A) W No.8(43.54) and Providing & laying 80mm thick Interlocking Tiles/paver block M-40 grade in streets of mohalla Rishi Nagar (Part-B) W No.8(45.34)and Providing & laying 80mm thick Interlocking Tiles/paver block M-40 grade in streets of mohalla Vishal Vihar Colony W No.8(31.19) ILT80 W No.8 141.86 128.91 Sh Satwinder Singh Bajwa B/br/2016/125 30/05/2016 4 82.00 6.74 79.93 48.98
368 B BG B_General ongoing gq nw br Providing & laying 80mm thick Interlocking tiles in various streets of W No.8 (Part-4) Providing & laying 80mm thick Interlocking Tiles/paver block M-40 grade in streets of mohalla New Gopal Nagar W. No.08 (53.84) and Providing & laying 80mm thick Interlocking Tiles/paver block M-40 grade in streets of mohalla Gopal Nagar (64.20) and P/F 80mm thick Interlocking Tiles/paver blocks of M-40 grade in streets of Mohalla Simranjit Nagar of W-8 (56.18) ILT80 W No.8 174.22 156.35 Sh Satwinder Singh Bajwa B/br/2016/122 30/05/2016 5 100.00 1.38 134.96 21.39
369 B BG B_General ongoing gq nw br Const. of Mettaled Roads in various streets of W No.8(Const. of streets by laying BM & PC from Towerline No.5 to Gulabi Bagh in Mohalla Kishan Vihar W No.8 (34.05) and Const. of Road by laying 30mm thick SDBC in streets of Mohalla Iqbal Nagar W No.8 (30.86) and Construction of road by laying BM & PC from New Karamsar Colony to Juneja Colony in W No.8 (19.99)) SDBC W No.8 84.90 81.08 M/s Dass Builders Pvt. Ltd. B/br/2016/135 30/05/2016 3 15.00 9.93 0.00 81.08
370 B BG B_General ongoing gq nw br Supply of stable bleaching powder make DCM/Shri Ram ISI marked in central store O&M including feeding and maintenance of dozzers Others central Store 75.77 62.42 M/s Rajdeep Enterprises B/br/2016/11/G33 11/04/2016 9 0.00 0.00 0.00 62.42
371 B BG B_General ongoing gq nw br Laying Zebra crossing lines with Thermoplastic paint on Chandigarh road. Others Chd Road 4.95 4.57 The Ghangas Co-Op L/C Society Ltd. B/br/2016/162 02/06/2016 1 100.00 4.06 0.00 4.57
372 B BG B_General ongoing gq nw br Const. of RCC Road by laying RMC (M-30) at Kakka Dhaula Road to Jamalpur Dump upto Weighing Bridge Others Kakka Dhaula Road 264.14 234.79 Sh Daljit Singh Khurd Govt. Contractor B/br/2016/108 27/05/2016 6 75.00 33.47 160.16 74.63
373 B BG B_General ongoing gq nw br Repair and Maintenance of various Parks in W.No.17. Parks W.No.17 33.03 29.73 M/s Sihar Co-Op L/C Society Ltd. B/br/2016/196 01/09/2016 4 100.00 3.03 29.57 0.16
374 B BG B_General ongoing gq nw br Const. of Unified Citizen Service Delivery Centre (Sewa Kender Type-II) with internal furnishings backside of Blind School Village Kuliewal Others Back side Blind School 21.67 20.24 Smridhi construction B/br/2016/194 29/08/2016 3 100.00 13.04 7.20 13.04
375 B BG B_General ongoing other nw br Providing & laying 80mm thick Interlocking Tiles/paver block M-40 grade in streets of mohalla Karamsar Colony (Part A) (undeclared) Ward No.06. ILT80 W No.6 88.78 80.90 Sh Ashok Kumar Sobti B/br/2016/119 30/05/2016 2 100.00 0.17 41.02 39.88
376 B BG B_General ongoing other nw br Providing & laying 80mm thick Interlocking tiles in various streets of W No.7 (Part-2) (182.08 Lacs) Providing & laying 80mm thick Interlocking Tiles/paver block M-40 grade in streets of mohalla EWS Colony Pocket -IV W No.7(42.38) and Providing & laying 80mm thick Interlocking Tiles/paver block M-40 grade in streets of mohalla Grewal Colony(Part-D) W No.7(36.36) and Providing & laying 80mm thick Interlocking Tiles/paver block M-40 grade in streets of Mohalla Baba Jiwan Singh Nagar Part A, Tajpur road (35.77) and Providing & laying 80mm thick Interlocking Tiles/paver block M-40 grade in streets of mohalla Puneet Nagar-Part C(Undeclared Area) W No.7 (46.22) andP/F 80mm thick Interlocking Tiles/paver blocks in street of Baba Banda Bhadur colony to Shamshan ghat near Hospital W-7 (21.35) ILT80 W No.7 182.08 165.45 Sh Charanjit Singh B/br/2016/123 30/05/2016 5 60.00 7.92 90.19 75.26
377 B BG B_General ongoing other nw br Providing & laying 80mm thick Interlocking tiles in various streets of W No.8 (Part-1) (141.86 Lacs) Providing & laying 80mm thick Interlocking Tiles/paver block M-40 grade in streets of mohalla New Company Bagh (Part-A) W No.8(21.79) and Providing & laying 80mm thick Interlocking Tiles/paver block M-40 grade in streets of mohalla Rishi Nagar (Part-A) W No.8(43.54) and Providing & laying 80mm thick Interlocking Tiles/paver block M-40 grade in streets of mohalla Rishi Nagar (Part-B) W No.8(45.34)and Providing & laying 80mm thick Interlocking Tiles/paver block M-40 grade in streets of mohalla Vishal Vihar Colony W No.8(31.19) ILT80 W No.8 141.86 128.91 Sh Satvinder Singh Bajwa B/br/2016/125 30/05/2016 4 100.00 1.32 105.71 23.2
378 B BG B_General ongoing other nw br Providing & laying 80mm thick Interlocking tiles in various streets of W No.8 (part-3) (120.86 Lacs) Providing & laying 80mm thick Interlocking Tiles/paver block M-40 grade in streets of mohalla Sat Kartar Nagar(68.49) and Providing & laying 80mm thick Interlocking Tiles/paver block M-40 grade in streets of mohalla Shera Colony W No.8 (52.37) ILT80 W No.8 120.86 101.26 Sh Barjinder Kumar Govt. Contractor B/br/2016/126 30/05/2016 4 67.00 4.48 100.40 0.86
379 B BG B_General ongoing other nw br Construction of Road by laying SDBC in streets of Mohalla Kishore Nagar W No.9 (44.80 )and Const. of Road by laying BM & SDBC from GT road via Baba Balak Nath Mandir wali Gali upto St No.3 of Adarsh Nagar W No.9 (33.54) SDBC W. No.9 78.34 74.81 M/s C H Builders B/br/2016/62 04/05/2016 4 100.00 0.61 37.54 37.27
380 B BG B_General ongoing other nw br Laying 80mm thick Interlocking Tiles/paver blocks of M-40 grade in streets of Mohalla Indra colony near Chd. Road of W-9 (40.33) and Laying 80mm thick Interlocking Tiles/paver blocks of M-40 grade in streets of Mohalla Beantpura of W-9 (25.31) ILT80 W. No.9 65.64 60.39 M/s Asis Builders B/br/2016/42 22/04/2016 3 100.00 0.80 49.86 10.53
381 B BG B_General ongoing other nw br Laying 80mm thick Interlocking Tiles/paver blocks of M-40 grade in st no.7 of Mohalla Hargobindpura & links 5-1/2, 3 & 4 and Beantpura St No.0. ILT80 W. No.9 58.93 49.51 Sh Anuj Abrol B/br/2016/13 18/04/2016 3 100.00 1.60 3.96 45.55
382 B BG B_General ongoing other nw br Construction of Road by laying BM & PC in Onkar Vihar W No.10 BMPC W No.10 69.73 66.59 M/s Apex Builders B/br/2016/64 04/05/2016 3 100.00 4.09 62.00 4.59
383 B BG B_General ongoing other nw br Construction of streets by laying SDBC on Grewal Harcharan Nagar W No.10 SDBC W No.10 25.12 23.99 M/s shiva Const. Co. B/br/2016/165 10/06/2016 2 59.02 14.16 0.00 23.99
384 B BG B_General ongoing other nw br Providing & laying 60mm thick Interlocking Tiles/paver blocks of M-35 grade in links street along Phirni of village Kuliewal to Sham,shan Ghat & adjoining Mohani Sarpanch House W No.11 (18.37) and Providing & laying 80mm thick Interlocking Tiles/paver blocks of M-40 grade in streets of mohalla Bachan Nagar W. No.11(46.70) ILT60 W No.11 65.07 59.86 M/s Asis Builders B/br/2016/149 02/06/2016 3 100.00 0.01 48.37 11.49
385 B BG B_General ongoing other nw br Laying RMC( M-20) 6" thick on main road from Master Colony to Bachittar Nagar Under Towerline W No.11 RMC4 W No.11 52.08 43.75 M/s Capital Const. Co. B/br/2016/14 18/04/2016 3 65.00 6.45 22.04 21.71
386 B BG B_General ongoing other nw br Providing & laying 80mm thick Interlocking Tiles/paver blocks of M-40 grade in streets of mohalla Master Colony W. No.11. ILT80 W No.11 52.03 47.87 M/s Teg Builders B/br/2016/44 22/04/2016 3 100.00 4.84 38.46 9.41
387 B BG B_General ongoing other nw br Laying RMC( M-20)6" thick from Sarpanch Colony to New Sarpanch Colony W No.12 (33.80) and Laying 4" thick RMC( M-20) in streets of New Guru Nanak Nagar from New Sarpanch Colony to 33' road W. No.12 (40.12) RMC4 W No.12 73.92 60.55 Sh Rajesh KUmar Sood B/br/2016/150 02/06/2016 4 85.00 21.19 21.13 39.42
388 B BG B_General ongoing other nw br Laying RMC M-20, 6" thick from Blind School to Sarpanch Colony RMC4 W No.12 85.15 69.07 M/s Capital Const. Co. B/br/2016/16 18/04/2016 4 55.00 4.56 33.57 35.5
389 B BG B_General ongoing other nw br Providing & laying 80mm thick Interlocking Tiles/paver blocks of M-40 grade in the area of Sant Nagar W. No.12. ILT80 W No.12 70.14 64.44 M/s Swardha Builders B/br/2016/46 22/04/2016 4 100.00 1.34 53.60 10.84
390 B BG B_General ongoing other nw br P/L 80mm thick I/tiles in Old Sunder Nagar W No.12 ILT80 W No.12 130.44 110.70 M/s Ramanjeet Singh & Co. B/br/2016/17 18/04/2016 5 100.00 1.37 94.88 15.82
391 B BG B_General ongoing other nw br Const. of Road by laying BM & SDBC adjoining Veer Palace road in W No.12 SDBC W No.12 23.14 22.10 Sh Sunil KUmar B/br/2016/68 04/05/2016 2 63.00 10.63 0.00 22.1
392 B BG B_General ongoing other nw br P/L 80mm thick Interlocking Tiles in Baba Shri Chand Colony W No.12 ILT80 W No.12 59.60 49.62 M/s Anuj Abrol Contractor B/br/2016/92 27/05/2016 3 100.00 35.58 0.02 49.6
393 B BG B_General ongoing other nw br P/L 80mm thick I/tiles on 33 road in Guru Nanak Nagar W No.12 ILT80 W No.12 173.81 150.07 Sh Ashok Kumar Sobti B/br/2016/51 22/04/2016 5 69.00 75.13 28.58 121.49
394 B BG B_General ongoing other nw br Construction of Road by laying BM & SDBC on Guru Arjun Dev Nagar main road W No.9 SDBC W. No.9 44.13 42.14 Sh Sunil KUmar Contractor B/br/2016/141 30/05/2016 3 100.00 4.98 35.63 6.51
395 B BG B_General ongoing other nw br Laying RMC in different streets of W No.9 (120.79 Lacs) Laying RMC( M-20) at Mohalla Guru Arjun Dev Nagar adjoining GV Dharam Kanda Tajpur Road of W-9 (28.31) and Laying RMC( M-20) in streets of Mohalla Ravidaspura, Aadarsh Nagar & Guru Arjun Dev Nagar of W-9 at Ludhiana (33.39) and Laying RMC( M-20) in street no.5 to 9 & links of Mohalla Guru Arjun Dev Nagar of W-9(59.09) RMC4 W. No.9 120.79 103.87 M/s R K Const. Co. B/br/2016/128 30/05/2016 4 70.00 3.74 68.95 34.92
396 B BG B_General ongoing other nw br Construction of metalled roads in various streets of W No.11 (191.26 Lacs) Const. of streets by laying SDBC in Ahloowalia Colony W No.11 (29.64)and Const. of streets by laying SDBC in Mohalla Gobind Colony W No.11 (46.57)and Const. of streets by laying SDBC in Mohalla Jyoti Colony W No.11 (20.76)and Const. of streets by laying SDBC in Mohalla Rasila Nagar W No.11 (26.65)and Const. of Streets by laying BM & SDBC in Ansal Bachittar Enclave W No.11 (67.64) SDBC W No.11 191.26 182.65 Sh S S Singla B/br/2016/93 27/05/2016 5 60.00 54.81 58.52 124.13
397 B BG B_General ongoing other nw br Providing & laying 80mm thick Interlocking tiles in various streets of W No.12 (Part-1) (191.73 Lacs) ILT80 W No.12 191.73 168.24 M/s RHG Construction B/br/2016/111 30/05/2016 5 100.00 32.56 119.51 48.73
398 B BG B_General ongoing other nw br Providing & laying 80mm thick Interlocking tiles in various streets of W No.12 (Part-2) ILT80 W No.12 195.12 171.22 M/s RHG Construction B/br/2016/112 30/05/2016 5 100.00 22.38 116.82 54.4
399 B BG B_General ongoing other nw br P/L 80mm thick Interlocking tiles in various streets of W No.12 (Part-3) ILT80 W No.12 182.36 160.02 M/s RHG Construction B/br/2016/113 30/05/2016 5 100.00 29.87 102.12 57.9
400 B BG B_General ongoing other nw br Providing & laying 80mm thick Interlocking tiles in various streets of W No.12(Part-4) ILT80 W No.12 192.48 168.90 M/s RHG Construction B/br/2016/114 30/05/2016 5 100.00 12.43 145.50 23.4
401 B BG B_General ongoing other nw br Providing & laying 80mm thick Interlocking tiles in various streets of W No.12 (Part-6) (183.57Lacs) ILT80 W No.12 183.57 161.08 M/s RHG Construction B/br/2016/115 30/05/2016 5 100.00 7.63 126.70 34.38
402 B BG B_General ongoing other nw br Providing & laying 80mm thick Interlocking tiles in various streets of W No.12 (Part-7) ILT80 W No.12 187.60 164.62 M/s RHG Construction B/br/2016/116 30/05/2016 5 100.00 20.31 120.89 43.73
403 B BG B_General ongoing other nw br Providing & laying 80mm thick Interlocking tiles in various streets of W No.12 (Part-8) ILT80 W No.12 172.48 150.06 Sh Avtar Singh B/br/2016/117 30/05/2016 5 30.00 38.58 0.00 150.06
404 B BG B_General ongoing other nw br P/L80mm thick Interlocking tiles in various streets of W No.12 (Part-10) (132.61Lacs) ILT80 W No.12 132.61 116.37 M/s RHG Construction B/br/2016/118 30/05/2016 4 100.00 17.55 94.88 21.49
405 B BG B_General ongoing other nw br Const. of road by laying SDBC in Urban Estate Phase-I, Jamalpur W No.13 SDBC W No.13 80.95 77.31 M/s C H Builders P. Ltd. B/br/2016/69 04/05/2016 3 66.00 10.56 40.81 36.5
406 B BG B_General ongoing other nw br Const. of Road by laying SDBC in streets of Mohalla HM Colony W No.13 SDBC W No.13 50.00 47.75 M/s Kabir Infra Pvt. Ltd. B/br/2016/70 04/05/2016 3 100.00 0.00 41.58 6.17
407 B BG B_General ongoing other nw br Providing & laying 80mm thick Interlocking Tiles paver block M-40 grade in streets of mohalla Muslim Colony-Part B in W.No.14 ILT80 W No.14 28.95 27.79 M/s The Khairey Co-Op L&C Society B/br/2016/87 16/05/2016 2 100.00 0.28 23.18 4.61
408 B BG B_General ongoing other nw br Laying RMC (M-20) in street No.17 & 18 of Mohalla Jeewan Nagar in W No.13 RMC4 W No.13 27.73 26.73 M/s The National SOC B/br/2016/90 16/05/2016 2 61.00 5.05 11.35 15.38
409 B BG B_General ongoing other nw br Laying 80mm thick Interlocking Tiles/paver blocks of M-40 grade in streets G-1 & links of Guru Bagh Colony W-13 ILT80 W No.13 32.81 31.42 M/s The Khairey Co-Op L&C Society B/br/2016/146 01/06/2016 2 100.00 22.79 8.00 23.42
410 B BG B_General ongoing other nw br Laying BM & PC on streets of Paramjit Colony W No.13 BMPC W No.13 60.98 58.24 M/s JK Infocon B/br/2016/73 04/05/2016 3 100.00 11.39 45.60 12.64
411 B BG B_General ongoing other nw br Const. of road by laying RMC( M-20) from Ganpati Chowk to Dhandari Khurd W No.14 (26.71) and Laying RMC( M-30) from main focal Point road to Sherpur Phirni W-14 at Ludhiana (28.48) RMC4 W No.14 55.19 47.47 M/s Capital Const. Co. B/br/2016/152 02/06/2016 3 66.00 13.37 17.38 30.09
412 B BG B_General ongoing other nw br Laying 6" thick RMC( M-30)on main road of Durga Colony near T/well to Dhandari Khurd W No.14 RMC6 W No.14 60.53 49.85 Sh Rajesh Kumar Sood B/br/2016/22 18/04/2016 3 70.00 22.92 11.94 37.91
413 B BG B_General ongoing other nw br Const. of RCC Road by laying RMC (M-30) Opp K-283 in 34 acre scheme of Phase-VIII Focal Point R-RMC W No.13 57.59 48.51 M/s IHR Associates B/br/2016/23 18/04/2016 3 67.00 9.40 23.99 24.52
414 B BG B_General ongoing other nw br Laying 4" thick RMC in streets of Bhagat Singh Colony W No.15 RMC4 W No.15 177.51 140.23 M/s Capital Const. Co. B/br/2016/25 18/04/2016 5 37.00 24.57 28.56 111.67
415 B BG B_General ongoing other nw br Laying RMC( M-20) in streets of mohalla Railway Colony Part 1 RMC4 W No.15 77.06 62.43 Sh Rajesh KUmar Sood B/br/2016/26 18/04/2016 4 66.00 21.05 19.98 42.45
416 B BG B_General ongoing other nw br Laying 4" thick RMC( M-20) in streets of mohalla Fouji Colony Sherpur Khurd W No.16 RMC4 W No.16 21.58 20.72 M/s The Khairey Co-Op L&C Society B/br/2016/86 16/05/2016 2 95.00 20.65 0.00 20.72
417 B BG B_General ongoing other nw br Laying 80mm thick Interlocking Tiles/paver blocks of M-40 grade in Asha Colony near Giaspura Phatak W No.16 (13.64) and Providing & laying 60mm thick Interlocking Tiles/paver block M-35 grade in streets of Balmiki mohalla & Ranjit Nagar W No.16 (10.55) and Laying 80mm thick Interlocking Tiles/paver block M-40 grade in streets of mohalla Ranjit Nagar W No.16(8.75) ILT80 W No.16 32.94 31.62 M/s The Khairey Co-Op L&C Society B/br/2016/89 16/05/2016 2 100.00 4.93 25.46 6.16
418 B BG B_General ongoing cq nw br Laying 60mm thick Interlocking Tiles on side berms of various parks in HM, HIG & MIG Colony ILT60 W No.13 24.43 22.48 M/s The Sunet Co-Op L & C Society B/br/2016/160 02/06/2016 4 75.00 5.05 9.42 13.06
419 B BG B_General ongoing other nw br Construction of metalled roads in various streets of W No.14 (98.94 Lacs) SDBC W No.14 98.94 94.49 M/s Apex Builders B/br/2016/136 30/05/2016 4 65.00 8.33 53.45 41.04
420 B BG B_General ongoing other nw br Construction of metalled roads in various streets of W No.15 (122.26 Lacs) Const. of streets by laying SDBC in Mohalla Moti Nagar Block- B & C in W No.15 (30.00) and Const. of Road by laying BM & SDBC at BVM School road W No.15 (15.28) and Const. of Road by laying BM & SDBC from NRI police station upto metro road & New moti Nagar chowk to Chandigarh road W. No.14 & 15 (76.98) SDBC W No.15 122.26 116.76 Sh Sunil KUmar Contractor B/br/2016/137 30/05/2016 4 100.00 8.64 85.00 31.76
421 B BG B_General ongoing other nw br Laying RMC in different streets of W No.13 (Const. of RCC Road by laying RMC (M-30) from E-730 to E-750 in the area of 34 acre scheme of Phase-VIII Focal Point RMC4 W No.13 83.55 71.91 M/s Rai Construction Co. B/br/2016/133 30/05/2016 3 54.00 22.31 16.71 55.2
422 B BG B_General ongoing other nw br Construction of metalled roads in various streets of W No.13 (149.92 Lacs) Const. of road by laying BM & SDBC from Metro Road to Veer Palace Road on Gurudwara Main road W No.13 (67.43) Const. of Road by laying BM & PC at Guru Bagh Colony W No.13 (82.49) BMPC W No.13 149.92 143.17 M/s C H Builders P. Ltd. B/br/2016/138 30/05/2016 5 45.00 12.04 41.11 102.06
423 B BG B_General ongoing other nw br Construction of metalled roads in various streets of W No.13 (82.31 Lacs) Const. of Road by laying SDBC in road Urban Estate Phase-II, Part I Jamalpur W. No.13(34.95) and Const. of Road by laying BM & SDBC in Village Nichi Mangli W. No.13 (47.36) SDBC W No.13 82.31 78.61 M/s Shiva Constructions B/br/2016/139 30/05/2016 3 100.00 5.71 63.82 14.79
424 B BG B_General ongoing other nw br Construction of metalled roads in various streets of W No.15 (193.57Lacs) Construction of Road by laying BM & SDBC from main road of gajjamal jain colony to 100 feet road & links upto Swarn palace road W No.15 (64.35) and Const. of Road by laying BM & SDBC from main Delhi road to swarn palace W. No.15 (65.04) and Const. of streets by laying BM & SDBC in Gajjamal jain Colony W No.15 (64.18) SDBC W No.15 193.57 184.86 M/s Apex Builders B/br/2016/140 30/05/2016 5 83.00 25.48 94.47 90.39
425 B BG B_General ongoing other nw br Providing & laying 60mm thick Interlocking Tiles/paver block M-35 grade in streets of mohalla Kailash Nagar W No.169(85.14) ILT80 W No.16 85.14 77.78 Sh Varinder Singh B/br/2016/127 30/05/2016 3 100.00 6.89 62.02 15.76
426 B BG B_General ongoing other nw br Const. of Road by laying BM & SDBC from park adjoining Dholewal flyover upto Gurudwara Sahib on Oswal road W. No.17 SDBC Dholewal 68.98 65.58 M/s Apex Builders B/br/2016/77 04/05/2016 3 100.00 64.41 60.52 5.06
427 B BG B_General ongoing other nw br Const. of Road by laying BM & SDBC from petrol pump to Shamshanghat pulley & Kashmir Nagar chowk upto road adjoining Nallah W. No.18 SDBC petrol pump to Shamshanghat pulley & Kashmir Nagar chowk upto road adjoining Nallah 56.99 54.43 M/s C H Builders P. Ltd. B/br/2016/78 04/05/2016 3 57.00 33.03 0.00 54.43
428 B BG B_General ongoing other nw br Laying 4" thick RMC in Ganesh Nagar W No.40 RMC4 Ganesh Nagar 68.51 61.66 M/s S.K Const. Co. B/br/2016/98 27/05/2016 3 40.00 29.06 10.15 51.51
429 B BG B_General ongoing other nw br Laying 80mm thick Interlocking Tiles/paver blocks of M-40 grade in streets of Mohalla New Hargobind Nagar of W-41 ILT80 New Hargobind Nagar 75.13 65.70 Sh Baljit Singh Gill B/br/2016/29 22/04/2016 3 100.00 20.22 41.72 23.98
430 B BG B_General ongoing other nw br Laying 60mm thick Interlocking Tiles in streets on side berms of roads of Kidwai Nagar W-42 ILT60 Kidwai Nagar 63.79 57.04 Sh Baljit Singh Gill B/br/2016/30 22/04/2016 3 60.00 8.08 21.37 35.67
431 B BG B_General ongoing other nw br Laying RMC in different streets of W No.18 (129.69 Lacs) Laying RMC( M-20) in streets of Mohalla Kashmir Nagar in W No.18 (29.25) and Const. of RCC Road by laying RMC (M-30) from Delhi GT road upto Petrol pump on Kashmir Nagar road W No.18 (100.44) RMC4 W No.18 129.69 114.65 M/s Kabir Infra Pvt. Ltd. B/br/2016/104 27/05/2016 4 86.00 47.64 32.42 82.23
432 B BG B_General ongoing other nw br Providing & laying 80mm thick Interlocking tiles in various streets of W No.40 (73.23 Lacs) Laying 80mm thick Interlocking Tiles/paver blocks of M-40 grade in street no. 12,13 & 14 of Mohalla Janakpuri in W No.40(45.42) and Providing & laying 80mm thick Interlocking Tiles/paver blocks of M-35 grade in streets of Mohalla Dharampura W. No.40.(27.81) ILT80 W No.40 73.23 62.66 M/s Friends & Co. B/br/2016/105 27/05/2016 3 75.00 15.19 29.15 33.51
433 B BG B_General ongoing other nw br P/F 60mm thick Interlocking Tiles/paver blocks of M-35 grade in street no.1 & 6 of Mohalla Janakpuri and link of street no.16 of Mohalla Kidwai Nagar W. No.41. ILT60 Kidwai Nagar 45.40 39.68 Sh Naresh Kumar Contractor B/br/2016/143 30/05/2016 2 80.00 10.70 14.62 25.06
434 B BG B_General ongoing other nw br Laying RMC in different streets of W No.42 (140.70 Lacs) Const. of Road by laying RMC( M-20) in streets of Mohalla Kidwai Nagar & Furniture market W No.42(38.28) and Const. of Road by laying RMC( M-20) in streets of Mohalla Hargobindpura W No.42(15.12) and Laying PCC in various streets of Amarpura near Krishna Model School W No.42(31.05) and Laying PCC in various streets of Mohalla Amarpura (Uchcha Tibba) W. No.42(56.25) RMC4 W No.42 140.70 117.43 M/s Asis Builders B/br/2016/106 27/05/2016 4 80.00 36.79 60.14 57.29
435 B BG B_General ongoing gq nw br Laying RMC in in different streets of ward no. 31 (PIDB-2) RMC4 Ward No. 31 90.96 78.99 M/s Gagandeep Arora B/br/2016/95/EED 25/05/2016 3 40.00 18.23 13.47 65.52
436 B BG B_General ongoing gq nw br Construction of Mettaled Roads in Various Streets of ward no. 58 (Part-1) (PIDB-2) SDBC Ward No. 58 148.68 141.98 Daljit Singh Khurd B/br/2016/104/EED 25/05/2016 4 50.00 23.54 39.06 102.92
437 B BG B_General ongoing mlaq nw br P/Laying 60 mm I/Tile on Sider burm at Moti Nagar ILT60 P/Laying 60 mm I/Tile on Sider burm at Moti Nagar 38.95 37.39 The Rajowal Co-op L/C Society Ltd. B/br/2016/88 16/05/2016 2 72.00 5.86 19.12 18.27
438 B BG B_General ongoing other nw br Providing & laying 60mm thick Interlocking Tiles/paver block M-35 grade in streets of mohalla EWS Colony Pocket -III (Part A) W No.7 (42.46) and P/F 80mm thick Interlocking tiles paver block M-40 grade in Streets of Mata Karam Kaur Colony (Part-1) W No.07 (31.85) ILT80 EWS Colony 74.31 60.74 Sh Satvinder Singh Bajwa B/br/2016/201 24/10/2016 3 95.00 0.96 43.28 17.46
439 B BG B_General ongoing other nw br P/F 60mm & 80mm thick Interlocking Tiles in streets of Mohalla Guru Ram Dass (GRD) Nagar W No.7 ILT60 GRD Nagar 43.65 36.52 Sh Ashok Kumar Sobti B/br/2016/198 05/10/2016 2 100.00 3.37 22.82 13.7
440 B BG B_General ongoing other nw br Providing & laying 60mm thick Interlocking Tiles/paver block M-35 grade in street of mohalla EWS Colony Pocket -III (Part B) W No.7 ILT60 EWS Colony 60.18 52.28 M/s Ramanjeet Singh & Co. B/br/2016/204 24/10/2016 2 100.00 40.13 2.91 49.37
441 B BG B_General ongoing other nw br Providing & laying 80mm thick Interlocking Tiles/paver block M-40 grade in streets of mohalla Raju Colony (Part A) W No.8 ILT80 Raju Colony 53.00 43.17 Sh Ashok Kumar Sobti B/br/2016/208 03/11/2016 2 100.00 31.79 1.11 42.06
442 B BG B_General ongoing gq mw br Renovation of Parks in Mohalla Harcharan Nagar & Ranjit Singh Park. Parks Ludhiana 8.09 7.69 The Samrala Co-Op L & C Society Ltd. B/br/2016/195 31/08/2016 2 100.00 2.02 7.52 0.17
443 B BG B_General ongoing other nw br P/F 60 & 80mm thick Interlocking tiles in streets of Gurmail Park near VDM School W No.8 ILT60 Gurmail Park 55.93 47.19 M/s Gupta Engineers and Builders B/br/2016/205 24/10/2016 2 70.00 7.24 21.49 25.7
444 B BG B_General ongoing other nw br Laying RMC( M-20) in streets of Kirti Nagar W No.15 RMC4 Kirti Nagar 47.46 39.84 Sh Ashok Kumar Sobti B/br/2016/199 05/10/2016 2 75.00 7.02 18.07 21.77
445 B BG B_General ongoing other nw br Laying RMC( M-20) from Mohindra Colony to Everest school on Grewal road W No.15 RMC4 Mohindra Colony to Everest School 68.13 58.21 Sh Ashok Kumar Sobti B/br/2016/206 24/10/2016 2 60.00 7.21 30.94 27.27
446 B BG B_General ongoing other nw br Const. of road by laying RMC (M-20) in Gajjamal Jain Colony Opp Sethi Sweets Shop W No.15 RMC4 Gajjamal Jain Colony 90.83 77.61 Sh Ashok Kumar Sobti B/br/2016/202 24/10/2016 3 80.00 55.83 0.00 77.61
447 B BG B_General ongoing other nw br Reconditioning of road by laying SDBC on main road of Kishore Nagar & remaining streets of Beantpura W No.9 SDBC Kishore Nagar & Beantpura 28.43 27.86 Sh Sunil KUmar B/br/2016/210 03/11/2016 2 100.00 0.01 18.74 9.12
448 B BG B_General ongoing other nw br Reconditioning of various roads by laying SDBC in Sec-38 W No.11 SDBC Sec-38 33.72 33.05 M/s C H Builders P. Ltd. B/br/2016/211 03/11/2016 2 100.00 6.25 25.67 7.38
449 B BG B_General ongoing gq nw br Construction of Parapet wall by laying PCC 1:2:4 infront of Varandah in Dr. Ambedkar Colony W No.17 Others W No.17 1.66 1.65 M/s J.P Builders B/br/2016/166 13/06/2016 1 100.00 1.06 0.00 1.65
450 B BG B_General ongoing gq nw br Painting of central verge from Samrala chowk upto Jamalpur chowk on Chandigarh road. Others chandigarh Road 1.97 1.91 The Sunet Co-OP L&C Society Ltd. B/br/2016/231 07/12/2016 1 100.00 1.91 0.00 1.91
451 B BG B_General ongoing cq nw br Laying RMC in streets of mohalla Kotalamgir W No.42 RMC4 Kot Alamgir 26.93 26.42 Sh Ashok Kumar Sobti B/br/2016/192 12/08/2016 3 80.00 8.73 8.25 18.17
452 B BG B_General ongoing gq nw br Const. of road by laying BM and PC from Rahon Road to Fish Chowk , Const. of road in Mohalla Jain Colony on Rahon Road by laying BM and PC. BMPC zone-B 73.99 70.66 J.K. Infocon B/br/2016/55 04/05/2016 4 58.00 30.28 10.44 60.22
453 B BG B_General ongoing gq nw br Const. of RCC Road by laying RMC (M-30) at Kakka Dhaula road RMC6 Kakka Daula Road 85.10 63.36 M/s Kabir Infra Pvt. Ltd. B/br/2016/200 07/10/2016 3 100.00 93.38 80.68 -17.32
454 B BG B_General ongoing cq nw br P/L 80/60mm thick Interlocking tiles in various streets of W No.9 Laying 60mm thick Interlocking Tiles/paver blocks of M-35 grade in streets of Mohalla Indrapuri of W-9 (13.18)and Laying 80mm thick Interlocking Tiles/paver blocks of M-40 grade in streets of Mohalla Indrapuri Street No.1 of W-9 (15.13)P/F 50mm & 60mm Interlocking tiles on side berms & Const. of Footpath on Guru Arjun Dev Nagar Main road W No.9 (119.66) ILT80 W.No. 9 147.97 134.06 Sh. Baljit singh Gill B/br/2016/B/br/2016/110 30/05/2016 4 66.00 66.34 0.00 134.06
455 B BG B_General ongoing gq nw br Laying 80mm thick Interlocking Tiles/paver blocks of M-40 grade in streets of Mohalla Guru Ram Dass colony W No.15 ILT80 W No.15 44.45 39.95 M/s Teg Builders B/br/2016/53 22/04/2016 3 100.00 10.36 38.84 1.11
456 B BG B_General ongoing cq nw br Laying RMC(M-20) in various streets of W No.18 RMC4 W No.18 59.79 50.37 M/s Apex Developers B/br/2016/236 20/12/2016 3 100.00 11.95 49.45 0.91999999999999
457 B BG B_General ongoing gq nw br Laying RMC (M-20) in various streets of Mohalla Hari Singh Nagar W No.13(44.42) and Laying RMC (M-30) in street No.18 of Mohalla Jeewan Nagar in W No.13 (20.43) RMC4 W No.13 64.85 57.26 M/s Surya Constructions B/br/2016/227 07/12/2016 3 100.00 21.79 35.43 21.83
458 B BG B_General ongoing gq nw br P/F 80mm thick Interlocking tiles paver block M-40 grade in missing links of Fouji Colony W No.16 (25.64) and Renovation of Dharamshalla at Sherpur W No.16 (20.38) Others W No.16 46.02 43.63 M/s Asis Builders B/br/2016/220 07/12/2016 3 100.00 54.26 29.57 14.06
459 B BG B_General ongoing gq nw br Construction/Renovation of various parks in Sec-39 W No.15(55.92) and Construction/Renovation of various parks in Saini Colony & Moti Nagar Block-A, B & C W No.15 (55.92) Parks Sec 39 111.84 85.06 M/s Teg Builders B/br/2016/228 07/12/2016 4 100.00 18.52 66.53 18.53
460 B BG B_General ongoing gq nw br Laying 60mm thick Interlocking Tiles M-35 paver block side road berms Urban Estate Phase-II, Jamalpur W No.13 ILT60 W No.13 65.61 54.42 Sh Ashok Kumar Sobti B/br/2016/188 27/07/2016 3 100.00 54.39 36.24 18.18
461 B BG B_General ongoing gq nw br Const. of RCC Road by laying RMC (M-30) from Akal Spring road & Links of Phase-V Focal Point W No.14 R-RMC Akal Spring road (Revised Est) 168.70 143.11 M/s SK Construction Co. B/br/2016/225 07/12/2016 5 100.00 21.57 135.19 7.92
462 B BG B_General ongoing gq nw br Laying RMC (M-20) in streets of Mohalla Guru Gobind Singh Nagar Tibba road RMC4 Guru Gobind ISngh Nagar 52.43 41.34 Sh Rajesh Kumar Sood B/br/2016/50 05/02/2016 4 100.00 33.13 3.80 37.54
463 B BG B_General ongoing cq nw br P/F of Speed Bumps in Ward No.18 Others Ludhiana 4.29 3.49 The Sutlej Co-Op L&C Society Ltd. B/br/2017/01 11/04/2017 2 100.00 0.92 4.15 -0.66
464 B BG B_General ongoing cq nw br P/F 80mm thick Interlocking tiles/paver block M-40 grade on rvenue rasta from Bhamian road to Khurana Colony W No.10 ILT80 Khurana Colony 17.70 16.72 M/s The KhairayCo-Op L&C Society Ltd. B/br/2016/221 07/12/2016 2 100.00 14.56 3.34 13.38
465 B BG B_General ongoing gq mw br Repair,Renovation & Paint of MC Building near Shingar Cinema Zone B Ludhiana Others MC Building Zone B 29.29 26.03 M/s The Lubhana Co-Op L&C Society Ltd. B/br/2016/241 20/12/2016 2 0.00 0.00 0.00 26.03
466 B BG B_General ongoing gq nw br Repair and Maintenance work of various areas of W No.40 in Sub Zone B1 Others Sub Zone B1 12.83 11.43 M/s Durga Const. Co. B/br/2016/237 20/12/2016 1 55.00 6.01 0.00 11.43
467 B BG B_General ongoing gq nw br Repair & maintenace of various parks in W No.42 (19.78) and Const. of Senior citizen home in W No.42 (15.60) and Repair & Maintenance of Garbage Dump in the area of Mustaq Ganj in W No.42 (11.48) Others Parks in W No.42 46.86 42.52 M/s Durga Const. Co. B/br/2016/240 20/12/2016 3 100.00 12.34 34.50 8.02
468 B BG B_General ongoing gq nw br Reconditioning of Road by laying RMC (M-20) in the streets of Chanderlok Colony W No.5 RMC4 Chanderlok Colony 65.89 58.11 Sh Sham Sunder Singla B/br/2016/244 26/12/2016 3 60.00 10.56 21.43 36.68
469 B BG B_General ongoing gq nw br P/F 80mm thick Interlocking tiles paver block M-40 grade in streets of Mohalla Jaswant Nagar & Adarsh Nagar W No.9 ILT80 W NO.9 75.17 59.15 Sh Kulbhushan Sharma B/br/2017/3 28/04/2017 3 100.00 9.59 45.49 13.66
470 B BG B_General ongoing gq nw br P/F 80mm thick Interlocking tiles paver block M-40 grade in Guru Gobind Singh Nagar opp Radha Swami Satsang Ghar W No.08 ILT80 W No.8 65.32 52.03 Sh Kulbhushan Sharma B/br/2017/4 28/04/2017 2 100.00 22.49 45.63 6.4
471 B BG B_General ongoing gq nw br P/F 60mm thick Interlocking tiles paver block M-35 grade on side berms of road Urban Estate Jamalpur Phase-1(Part-2) ILT60 W No.13 88.98 70.67 M/s Anil Kumar & Sons B/br/2017/5 28/04/2017 3 100.00 30.92 50.08 20.59
472 B BG B_General ongoing gq nw br Annual demand of material required for engagement of labour Others Central store 222.15 184.42 M/s Ashok Kumar sobti B/br/2016/298 16/12/2016 9 40.00 24.75 43.11 141.31
473 B BG B_General ongoing cq nw br Development & maintenance of park on Metro road adjoining Gurudwara road W No.13 Parks W NO.13 10.98 9.66 M/s Sunet Co-Op Labour & Construction Society B/br/2017/6 18/05/2017 1 100.00 1.06 9.54 0.12
474 B BG B_General ongoing gq nw br Providing & Fixing Cautionary/ Mandatory & other boards in area of Zone B. Others Chandigarh road 1.96 1.72 M/s Asis Builders B/br/2016/163 02/06/2016 1 100.00 1.72 0.00 1.72
475 B BG B_General ongoing gq nw br Const. of Unified Citizen Service Delivery Centre (Sewa Kendra) Type-II of various places in area of MC Ludhiana Buildings Sewa Kendra 42.57 41.71 M/s Asis Builders B/br/2015/138/2-A 27/01/2015 2 100.00 2.46 39.24 2.47
476 B BG B_General ongoing gq nw br Laying RMC in Different streets of W No.16 RMC6 W No.16 83.80 75.42 M/s Capital Const. Co. B/br/2017/14 22/06/2017 3 90.00 18.54 60.32 15.1
477 B BG B_General ongoing gq nw br Const. of Road by laying RMC( M-20) in streets of Sec 39 near Disposal W No.15(33.03) and Laying RMC( M-20) in streets of Moti Nagar Block-A backside Bharat Sewak School W No.15(13.31) RMC4 W No.15 46.34 34.19 M/s JP Builders B/br/2017/56 29/12/2017 2 100.00 10.77 31.04 3.15
478 B BG B_General ongoing cq nw br Construction of Suwidha Kendra in the building of Zone B. Others Zone B 9.45 8.98 M/s Asis Builders B/br/2016/214 09/11/2016 1 100.00 8.94 0.00 8.98
479 B BG B_General ongoing gq nw br P/F 60mm thick Interlocking tiles paver block M-35 grade in St No. 1 to 4 of Guru Arjun Dev Nagar W No.9 ILT80 W No.9 88.23 64.36 Sh Ashok Kumar sobti B/br/2017/25 15/12/2017 4 85.00 65.16 0.00 64.36
480 B BG B_General ongoing gq nw br Laying RMC( M-20) in streets of Guru Arjun Dev Nagar backside GV Dharam Kanda W No.9 RMC4 W No.9 69.70 52.24 Sh Ashok Kumar sobti B/br/2017/23 15/12/2017 3 90.00 58.58 0.00 52.24
481 B BG B_General ongoing gq nw br Laying RMC( M-20) in streets of Vishkarma Nagar, Tajpur road W No.9 RMC4 W No.9 77.04 57.18 Sh Satvinder Singh Bajwa B/br/2017/34 15/12/2017 4 100.00 5.17 43.48 13.7
482 B BG B_General ongoing gq nw br P/F 80mm thick Interlocking tiles paver block M-40 grade in streets adjoining Chandigarh Public School & Baba Chicken in Guru Arjun Dev Nagar W No.9 ILT80 W No.9 46.96 37.05 M/s Anil Kumar & Sons B/br/2017/8 18/05/2017 3 75.00 27.49 0.00 37.05
483 B BG B_General ongoing gq nw br P/F 80mm thick Interlocking tiles paver block M-40 grade in streets of New Subhash Nagar near Tikona Park W No.07 ILT80 W No.7 75.89 56.16 Sh Ashok Kumar sobti B/br/2017/37 15/12/2017 4 100.00 2.20 42.80 13.36
484 B BG B_General ongoing gq nw br P/F 60mm thick Interlocking Tiles/paver block M-35 grade on side berms of road in mohalla HM Colony W No.14 (Part-A) ILT60 W No.14 76.48 55.07 Sh Ashok Kumar sobti B/br/2017/22 15/12/2017 4 75.00 15.18 19.16 35.91
485 B BG B_General ongoing gq nw br Laying RMC( M-20) in streets of Harcharan Nagar near CMC Ahata W No.18(22.01), P/F 80mm thick Interlocking tiles paver block M-40 grade in Harikartar Colony W No.40 (31.23) and Laying PCC in various streets of Sancy Mohalla W NO.42 (19.85) Others W No.40 73.09 51.12 Sh Ashok Kumar sobti B/br/2017/38 15/12/2017 4 100.00 20.34 25.29 25.83
486 B BG B_General ongoing gq nw br Const. of RCC Road by laying RMC (M-30) on Kakka Dhaula road (Part-II) RMC6 w No.7 80.66 56.38 M/s NKC Const. Pvt. Ltd. B/br/2017/57 28/12/2017 3 65.00 34.34 0.00 56.38
487 B BG B_General ongoing gq nw br Laying RMC( M-20) in various streets of W No.18 (Revised) RMC4 W No.18 55.13 42.32 M/s RK Const. Co. B/br/2017/02 11/04/2017 2 75.00 20.74 31.95 10.37
488 B BG B_General ongoing gq nw br Reconditioning of Road by laying 30mm thick SDBC in streets of Mohalla SatkarNagar W No.8(28.02) and Reconditioning of Road by laying 30mm thick SDBC in streets of Mohalla Moti Bagh W No.8(25.50)and Reconditioning of Road by laying 30mm thick SDBC in streets of Mohalla New Ramesh Nagar W No.8(15.94) and Reconditioning of Road by laying 30mm thick SDBC in streets of Mohalla Aadarsh Nagar W No.8(10.69) SDBC W No.8 80.15 76.54 M/s Apex Builders B/br/2016/249 29/11/2016 4 55.00 40.39 0.00 76.54
489 B BG B_General ongoing gq nw br P/F 60mm thick Interlocking tiles paver block M-35 grade on side berms of road Urban Estate Jamalpur Phase-1(Part-III) ILT60 W NO.13 79.05 52.67 Sh Kulbhushan Sharma B/br/2017/51 27/12/2017 3 55.00 28.45 0.00 52.67
490 B BG B_General ongoing gq nw br P/F 60mm thick Interlocking Tiles/paver block M-35 grade on side berms of road in mohalla HL Colony W No.14 (Part-B) ILT60 W No.14 77.16 54.79 M/s NKC Const. Pvt. Ltd. B/br/2017/31 15/12/2017 4 65.00 12.61 21.02 33.77
491 B BG B_General ongoing gq nw br P/F 60mm thick Interlocking Tiles/paver block M-35 grade on side berms of road in mohalla HIG Colony W No.14 ILT60 W No.14 69.41 49.28 M/s NKC Const. Pvt. Ltd. B/br/2017/33 15/12/2017 3 30.00 14.16 0.00 49.28
492 B BG B_General ongoing gq nw br P/F 60mm thick Interlocking tiles paver block M-35 grade in streets of Mohalla Hargobindpura W No.9 ILT60 W No.9 85.74 63.85 M/s Teg Builders B/br/2017/29 15/12/2017 4 100.00 4.57 57.97 5.88
493 B BG B_General ongoing gq nw br P/F 60mm thick Interlocking tiles paver block M-35 grade in the streets of Mayapuri W No.6 ILT60 W No.6 65.12 47.86 M/s Dynamic tiles B/br/2018/68 29/01/2018 3 70.00 10.20 21.29 26.57
494 B BG B_General ongoing other nw br Providing & laying 80mm thick Interlocking tiles in various streets of W No.12 (Part-9) ILT80 W No.9 98.14 84.01 M/s JP Builders B/br/2016/109 30/06/2016 3 100.00 4.55 68.88 15.13
495 B BG B_General ongoing gq nw br P/F 60mm thick Interlocking tiles paver block M-35 grade on Side Berms of Jain colony W No.05 ILT60 W No.5 84.85 67.79 M/s Anil Kumar & Sons B/br/2017/16 22/06/2017 3 50.00 32.72 0.00 67.79
496 B BG B_General ongoing gq nw br Const. of R/gullies on main Janakpuri road W No.17, 40 & 41 Others W No.17 3.00 2.53 M/s Samrala Co-Op L&C Society Ltd. B/br/2015/42 21/10/2015 1 100.00 2.53 0.00 2.53
497 B BG B_General ongoing gq nw br P/F 80mm thick Interlocking tiles in streets of Mahatma Enclave on Tibba road (Part-B) W No.07 ILT80 W No.7 52.59 38.81 M/s NKC Const. Pvt. Ltd. B/br/2018/88 30/01/2018 3 85.00 9.36 20.99 17.82
498 B BG B_General ongoing gq nw br Laying RMC( M-20) in streets of New Shivaji Nagar St No.12 & adjoining links of W No.40 (15.08) and Laying RMC( M-20) on Main Ganesh Nagar road W No.40 & 41(62.96) RMC4 W NO.40 & 41 78.04 55.30 Sh Satvinder Singh Bajwa B/br/2017/35 15/12/2017 4 100.00 7.08 46.60 8.7
499 B BG B_General ongoing gq nw br P/F 60mm thick Interlocking tiles paver block M-35 grade in St No.6-1/2, 7 & 8 in Mohalla Janakpuri W No.41 ILT60 W No.41 57.17 39.95 M/s Apex Developers B/br/2017/26 15/12/2017 3 100.00 18.70 20.78 19.17
500 B BG B_General ongoing gq nw br P/F 80mm thick Interlocking tiles paver block M-40 grade in Gita Nagar near Tubewell W No.8 ILT80 W NO.8 96.60 68.58 Sh Ashok Kumar sobti B/br/2017/43 27/12/2017 4 100.00 23.79 18.76 49.82
501 B BG B_General ongoing gq nw br P/F 80mm thick Interlocking Tiles/paver blocks in streets of Prem Vihar (Part-A) W-7 ILT80 W No.7 92.90 64.04 Sh Ashok Kumar sobti B/br/2017/48 27/12/2017 4 100.00 32.10 22.99 41.05
502 B BG B_General ongoing gq nw br P/F 80mm thick Interlocking Tiles/paver blocks in streets of Prem Vihar (Part-B) W-7 ILT80 W No.7 96.64 67.64 Sh Ashok Kumar sobti B/br/2017/47 27/12/2017 4 100.00 8.31 37.41 30.23
503 B BG B_General ongoing gq nw br P/F 80mm thick Interlocking tiles in Punjabi Bagh near Mayapuri Chowk W No.08 ILT80 W No.8 57.44 43.90 Sh Ashok Kumar sobti B/br/2018/67 29/01/2018 3 25.00 7.60 0.00 43.9
504 B BG B_General ongoing gq nw br P/F 60mm thick Interlocking tiles paver block M-35 grade in the streets of Guru Gobind Singh Nagar W No. 8 ILT60 W No.8 57.37 41.50 Sh Ashok Kumar sobti B/br/2017/41 27/12/2017 3 100.00 34.00 0.13 41.37
505 B BG B_General ongoing gq nw br P/F 60mm thick Interlocking Tiles/paver block M-35 grade on side berms of road in mohalla HM Colony W No.14 (Part-B) ILT60 W NO.14 56.57 28.35 M/s NKC Const. Pvt. Ltd. B/br/2017/36 15/12/2017 3 100.00 19.75 20.20 8.15
506 B BG B_General ongoing gq nw br P/F 80mm thick Interlocking tiles in Streets of Bharpur Nagar W No.07 ILT80 W No.7 85.18 58.77 M/s Teg Builders B/br/2017/45 27/12/2017 4 100.00 12.92 75.54 -16.77
507 B BG B_General ongoing gq nw br Const. of Road by laying RMC( M-20) in streets of Mohalla Ravidaspura of W-9 RMC4 W No.9 35.45 31.91 M/s The Sunet Co-Op L&C Society Ltd. B/br/2016/175 23/06/2016 2 80.00 18.40 0.00 31.91
508 B BG B_General ongoing gq nw br Repair & maintenance of Kushat aasham W No.43 Others W No.43 4.00 3.87 M/s Kohinoor Builders B/br/2018/78 29/01/2018 1 100.00 4.00 0.00 3.87
509 B BG B_General ongoing gq nw br P/F 80mm thick Interlocking tiles paver block M-40 grade in Mohalla Anandpura (Part-A) W No.6 ILT80 W No.6 70.07 48.25 Sh Varinder Singh B/br/2017/39 27/12/2017 3 100.00 21.16 30.70 17.55
510 B BG B_General ongoing gq nw br Const. of Road by laying BM & SDBC from Hero Majestic Chowk to Rockman Industry(36.62) and Const. of Road by laying BM & SDBC from Beer Factory to policestation road.(34.76) SDBC 71.38 67.81 M/s JK Infocon Pvt. Ltd. B/br/2018/95 01/03/2018 3 100.00 73.46 0.00 67.81
511 B BG B_General ongoing gq nw br P/F 80mm thick Interlocking tiles paver block M-40 grade in streets of BK Estate (New Vijay Nagar) on Gopal Nagar road W No.07 ILT80 W No.7 92.55 63.69 Sh Sunil Kumar B/br/2017/58 01/12/2017 4 75.00 47.75 0.00 63.69
512 B BG B_General ongoing gq nw br P/F 60mm thick Interlocking Tiles in streets of New Starcity Colony (Part-C) W-7 RMC4 W No.7 71.84 52.66 M/s SK Const. Co. B/br/2018/89 30/01/2018 3 50.00 22.87 0.00 52.66
513 B BG B_General ongoing gq nw br P/F 60mm thick Interlocking Tiles in the streets of Bhola Colony (Part-A), W. No.07. ILT60 W No.7 56.71 41.57 M/s SK Const. Co. B/br/2018/83 30/01/2018 3 75.00 30.97 0.00 41.57
514 B BG B_General ongoing gq nw br P/F 80mm thick Interlocking Tiles/paver blocks of in streets of Shiv Shanker Colony (Part-B )W-7 ILT80 W No.7 60.35 44.24 M/s SK Const. Co. B/br/2018/82 30/01/2018 3 80.00 34.33 0.00 44.24
515 B BG B_General ongoing gq nw br P/F 80mm thick Interlocking Tiles in streets of New Puneet Nagar-Part B W No.7 ILT80 W No.7 93.83 66.11 Sh Satvinder Singh Bajwa B/br/2018/72 29/01/2018 4 100.00 8.47 40.09 26.02
516 B BG B_General ongoing gq nw br P/F 80mm thick Interlocking tiles in streets of EWS Colony near Mandir W No.07 ILT80 W No.7 66.10 45.18 Sh Satvinder Singh Bajwa B/br/2018/71 29/01/2018 3 100.00 0.91 39.53 5.65
517 B BG B_General ongoing gq nw br Const. of mettalled road at BSUP flats at Mundian Kalan Site. Others Mundian Kalan 40.57 38.54 M/s SK Const. Co. B/br/2018/172 30/01/2018 2 100.00 34.91 0.00 38.54
518 B BG B_General ongoing gq nw br Repair & maintenanace of park in LIG Colony back side Karma Hospital near Indra Colony W No.7(8.37) and other works Parks W No.7 & 11 41.28 30.00 M/s RK Const. Co. B/br/2017/50 27/12/2017 2 100.00 7.99 20.92 9.08
519 B BG B_General ongoing gq nw br Providing & laying 80mm thick Interlocking Tiles in street No.1/3 of Indra Colony W No.05 ILT80 W No.5 6.65 5.10 M/s The Dharour Co-Op L&C Society Ltd. B/br/2018/61 29/01/2018 1 100.00 3.71 0.00 5.1
520 B BG B_General ongoing gq nw br P/F 80mm thick Interlocking Tiles/paver blocks in streets of New Starcity Colony (Part-A) W-7 BMPC W No.7 78.51 54.33 M/s Garg Enterprises B/br/2018/96 08/03/2018 3 60.00 27.78 0.00 54.33
521 B BG B_General ongoing gq nw br Construction of shed & wall at crimation ground of Baba Deep Singh Nagar W-16 Others W No.16 12.86 12.18 Sh Neeraj B/br/2017/9 18/05/2017 3 100.00 11.75 0.00 12.18
522 B BG B_General ongoing gq nw br Const. of Road by laying RMC( M-20) in streets of mohalla Ram Nagar W No.8 RMC6 W NO.8 24.86 20.92 The Gill Co-OP Labour & Construction Society Deploma Holder Ltd. B/br/2016/226 07/12/2016 2 65.00 13.60 0.00 20.92
523 B BG B_General ongoing gq nw br Laying PC in streets of Mohalla Kabir nagar W No.8 (21.18) and Providing & Fixing of Speed Bumps in W No.08(4.53) and P/F 80mm thick Interlocking tiles paver block M-40 grade in Guru Gobind Singh Nagar near Ram Nagar W No.08(17.62) Others W No.8 43.33 39.86 Sh Sunil Kumar B/br/2017/59 28/12/2017 2 70.00 28.17 0.00 39.86
524 B BG B_General ongoing gq nw br P/F 80mm thick Interlocking tiles in street of Gita Nagar on Vijay Nagar road W No.08(29.15) & P/F 80mm thick Interlocking Tiles/paver blocks of in streets of New Preet Nagar W-8(25.75) ILT80 W No.8 54.90 40.41 M/s NKC Const. Pvt. Ltd. B/br/2018/86 30/01/2018 3 40.00 11.48 0.00 40.41
525 B BG B_General ongoing gq nw br P/F 80mm thick Interlocking Tiles/paver blocks in streets of National Colony W-7 ILT80 W No.07 97.66 69.83 M/s Garg Enterprises B/br/2018/90 30/01/2018 4 45.00 29.65 0.00 69.83
526 B BG B_General ongoing gq nw br P/F 80mm thick Interlocking tiles paver block M-40 grade in Mohalla Anandpura(Part-B) W No.6 ILT80 W No.6 95.63 63.34 Sh Satvinder Singh Bajwa B/br/2017/40 27/12/2017 4 100.00 20.16 29.58 33.76
527 B BG B_General ongoing other nw br P/F 80mm thick Interlocking Tiles at passage around flats in Mundian Kalan under BSUP Project (JNNURM Scheme) ILT60 Mundian Flats 42.35 32.99 M/s Gupta Engineers & Builders B/br/2018/173 30/01/2018 2 85.00 7.91 19.84 13.15
528 B BG B_General ongoing gq nw br Laying PCC in various streets of Mohalla Mustaq Gunj W NO.42 & 43 PCC W No.42 & 43 90.56 62.39 M/s Capital Const. Co. B/br/2017/24 15/12/2017 4 50.00 14.44 13.77 48.62
529 B BG B_General ongoing gq nw br P/F 60mm thick Interlocking Tiles/paver block M-35 grade on side berms of road in mohalla HL Colony W No.14(Part-A) ILT60 W No.14 74.69 53.03 M/s NKC Const. Pvt. Ltd. B/br/2017/32 15/12/2017 4 100.00 28.61 23.82 29.21
530 B BG B_General ongoing gq nw br Providing & laying 80mm thick Interlocking Tiles/paver block M- 40 grade in streets of mohalla Starcity (Part E)on Tibba road W-7 ILT80 W No.7 65.26 45.21 M/s T&G Const. B/br/2018/66 29/01/2018 3 45.00 17.36 0.00 45.21
531 B BG B_General ongoing gq nw br Renovation of various parks at HIG,MIG & HL & Labour Colony.(W-14) Parks W No.14 48.84 33.94 M/s Apex Developers B/br/2018/4 12/06/2018 2 70.00 21.88 0.00 33.94
532 B BG B_General ongoing gq nw br Laying RMC( M-30) in streets of New Kidwai Nagar near DD Jain College W No.41 RMC6 W No.41 44.22 31.40 Sh Ashok Kumar sobti B/br/2018/9 18/07/2018 2 55.00 17.18 0.00 31.4
533 B BG B_General ongoing gq nw br Const of RCC road by laying RMC (M-30) from Lottey Dharam Kanda to Jeewan Nagar road W No.14 R-RMC W No.14 45.93 34.33 M/s Capital Const. Co. B/br/2017/30 15/12/2017 3 100.00 33.45 0.00 34.33
534 B BG B_General ongoing gq nw br P/F 60/80mm thick Interlocking tiles in streets of Gurmail Park near Divine School Tibba road W No.08 ILT80 W No.8 89.92 62.05 Sh Rajesh Kumar Sood B/br/2018/74 29/01/2018 3 100.00 38.52 0.00 62.05
535 B BG B_General ongoing gq nw br P/F 60mm/80mm thick Interlocking tiles in New Manjit Nagar near Prem Vihar W No.07 ILT80 W No.7 85.83 60.08 Sh Rajesh Kumar Sood B/br/2018/76 29/01/2018 4 60.00 37.07 0.00 60.08
536 B BG B_General ongoing gq nw br P/F 80mm thick Interlocking tiles in St No.18 of Shakti Nagar W No.08(8.85) and P&F 60/80mm thick Interlocking tiles on Main Gulabi Bagh Road W No.08 (49.81) ILT80 W No.8 58.66 41.65 Sh Rajesh Kumar Sood B/br/2018/73 29/01/2018 3 100.00 28.75 2.37 39.28
537 B BG B_General ongoing gq nw br P/F 80mm thick Interlocking tiles in Guru Gobind Singh Nagar near Mayapuri Chowk W No.08 ILT80 W No.8 57.84 43.38 Sh Rajesh Kumar Sood B/br/2018/75 29/01/2018 3 100.00 35.14 0.00 43.38
538 B BG B_General ongoing gq nw br P/F 80mm thick Interlocking tiles in streets of Chanderlok Colony near Subhash Nagar in W No.5 ILT80 W No.05 94.98 63.54 Sh Vishal Kumar Bhatia B/br/2018/99 08/03/2018 4 100.00 49.56 39.82 23.72
539 B BG B_General ongoing gq nw br P/F 80mm thick Interlocking Tiles/paver blocks of in streets of Shiv Shanker Colony (Part-A) W-7 ILT80 W No.7 56.02 40.34 M/s Apex Developers B/br/2018/80 30/01/2018 3 100.00 33.94 0.00 40.34
540 B BG B_General ongoing gq nw br P/F 80mm thick Interlocking tiles in streets of GK Estate WNo.08(48.78) and Const. of road by laying RMC(M-30) from Ganpati road to Durga Colony W.No.14 (25.91) RMC4 ludhiana 74.69 56.68 M/s Asis Builders B/br/2018/8 18/07/2018 3 100.00 34.70 19.84 36.84
541 B BG B_General ongoing gq nw br Construction & Renovation of Guru Ravidass Dharamshalla in St No.1 of Indra Colony W No.5 Others W No.5 1.50 1.42 Sh Prince Sharma B/br/2018/91 01/03/2018 1 100.00 1.42 0.00 1.42
542 B BG B_General ongoing gq nw br P/L 80mm thick Interlocking Tiles/paver block M-40 grade in streets of mohalla Starcity (Part-B) on Tibba road ILT80 W No.7 80.04 53.50 M/s Anil Kumar & Sons B/br/2008/70 29/01/2008 3 65.00 32.75 0.00 53.5
543 B BG B_General ongoing gq nw br P/F 80mm thick Interlocking Tiles/paver blocks in streets of Prem Vihar (Part-C) W-7 ILT80 W No.7 80.03 56.82 Sh Ashok Kumar sobti B/br/2017/46 27/12/2017 4 100.00 30.67 0.00 56.82
544 B BG B_General ongoing gq nw br P/F 80mm thick Interlocking Tiles/paver block M-40 grade in streets of Jai Shakti Nagar (Part-B) W-7 ILT80 W No.7 96.67 68.63 Sh Ashok Kumar sobti B/br/2017/44 27/12/2017 4 65.00 43.70 0.00 68.63
545 B BG B_General ongoing gq nw br P/F 80mm thick Interlocking Tiles/paver blocks of in streets of EWS Colony (Part-B)W-7 ILT80 W No.7 85.41 60.64 Sh Ashok Kumar sobti B/br/2017/49 27/12/2017 4 30.00 6.77 10.37 50.27
546 B BG B_General ongoing gq nw br Construction of road by laying SDBC in MIG Colony W No.10 (28.43) and Construction of streets by laying SDBC in Sukhdev Nagar W No.10 (12.17 ) and Construction of streets by laying SDBC in New Sukhdev Nagar W No.10 (14.80) SDBC W No.10 55.40 52.91 M/s VKBS Const. Co. B/br/2016/63 04/05/2016 3 100.00 2.30 46.43 6.48
547 B BG B_General ongoing gq nw br P/F 80mm thick Interlocking tiles in Streets of Punjabi Bagh W No.08 ILT80 W No.8 68.98 46.74 Sh Deepak Madaan B/br/2017/42 27/12/2017 3 80.00 26.23 0.00 46.74
548 B BG B_General ongoing gq nw br Supply of Crusher & Coarse Sand for Hot Mix Plant of Municipal Corporation Ludhiana Others HMP Ludhiana 98.55 74.33 M/s Teg Builders B/br/2018/01 01/05/2018 4 70.00 27.70 47.40 26.93
549 B BG B_General ongoing gq nw br Renovation of various parks at HM, HE & labour Colony. (W-14) Parks W No.14 47.78 33.30 Sh Vishal Kumar Bhatia B/br/2018/3 12/06/2018 2 75.00 25.13 0.00 33.3
550 B BG B_General ongoing gq nw br P/F 60/80mm thick Interlocking tiles in streets of Sawtantar Nagar W No.06 ILT80 W No.6 91.38 66.99 Sh Varinder Singh B/br/2018/5 12/06/2018 4 50.00 27.94 0.00 66.99
551 B BG B_General ongoing gq nw br P/F 50/60 mm thick interlocking tiles on side berms , footpath & const. of RMC central verge on road from Shiv mandir chowk to adjoining green land school end. ILT60 Shiv mandir chowk to adjoining green land school end. 62.25 45.41 Sh Ashok Kumar sobti B/br/2018/6 12/06/2018 3 15.00 0.00 0.00 45.41
552 B BG B_General ongoing gq nw br P/F 50/60 mm thick interlocking tiles on side berms, footpath & const. of RMC central verge on road from Adarsh nagar link to puda road ILT60 Adarsh nagar link to puda road 62.10 45.30 Sh Ashok Kumar sobti B/br/2018/7 12/06/2018 3 15.00 0.00 0.00 45.3
553 B BG B_General ongoing cq nw br P/F 80mm thick Interlocking tiles in streets of G.K. Estate near Gopal chowk W No.08 ILT80 W No.8 62.00 43.77 M/s Dynamic tiles B/br/2018/10 18/07/2018 3 5.00 0.00 0.00 43.77
554 B BG B_General ongoing cq nw br P/F 80mm thick Interlocking tiles in main streets of EWS Colony backsaide Hospital W No.07 ILT80 W No.7 96.40 68.90 Sh Satvinder Singh Bajwa B/br/2018/11 18/07/2018 3 10.00 0.00 0.00 68.9
555 B BG B_General ongoing gq nw br P/F 60/80mm thick Interloicking tiles paver block M-35 grade in balance streets of Muslim Colony W No.14 ILT80 W No.14 55.81 37.05 Sh Varinder Singh B/br/2018/12 01/07/2018 3 0.00 0.00 0.00 37.05
556 B BG B_General ongoing gq nw br Laying RMC( M-30) in streets of Hargobind Nagar W No.41(Part-A) RMC6 W No.41 58.23 40.76 Sh Ashok Kumar sobti B/br/2018/13 18/07/2018 3 30.00 0.00 0.00 40.76
557 B BG B_General ongoing gq nw br Laying RMC( M-30) in streets of mohalla Janakpuri W No.41 RMC6 W No.41 40.38 27.73 M/s Ahuja Builders & Construction Co. B/br/2018/14 18/07/2018 2 80.00 22.99 0.00 27.73
558 B BG B_General ongoing gq nw br Laying RMC( M-30) in streets of Hargobind Nagar W No.41 RMC6 W No.41 49.85 34.03 M/s Ahuja Builders & Construction Co. B/br/2018/15 18/07/2018 2 80.00 24.26 0.00 34.03
559 B BG B_General ongoing gq nw br Const. of Road by laying RMC (M-30) in streets of backside Phase-VIII, Jeewan Nagar W No.13 R-RMC W No.13 50.55 35.31 Sh Ashok Kumar sobti B/br/2018/16 18/07/2018 3 50.00 0.00 0.00 35.31
560 B BG B_General ongoing gq nw br Const. of room in Senior Citizen home in W No.41 New Kidwai Nagar Others W No.41 3.00 2.94 M/s Kohinoor Builders B/br/2018/17 18/10/2018 2 20.00 0.00 0.00 2.94
561 B BG B_General ongoing gq nw br Const. of RCC road by laying RMC (M-30) along plot no.179,180 & 181 Phase-VI, Focal Point, Ludhiana (49.86) ----50% R-RMC Focal Point 24.93 17.81 M/s NKC Const. Pvt. Ltd. B/br/2019/18 04/01/2019 2 100.00 17.79 0.00 17.81
562 B BG B_General ongoing gq nw br Const. of RCC road by laying RMC (M-30) along plot no.179,180 & 181 Phase-VI, Focal Point, Ludhiana (49.86) ----50% R-RMC Focal Point 24.93 17.81 M/s Apex Developers B/br/2019/19 04/01/2019 2 5.00 0.00 0.00 17.81
563 B BG B_General ongoing gq nw br P/F 80mm thick Interlocking tiles in streets of Sanjay Gandhi Colony on Tajpur road W No.07 ILT80 W No.7 94.21 65.38 M/s Paving Stone (India) Pvt. Ltd. B/br/2019/20 18/02/2019 6 5.00 0.00 0.00 65.38
564 B BG B_General ongoing gq nw br P/F 60mm thick Interlocking tiles in Iqbal Nagar on Tibba road W No.08 ILT60 W No.8 95.62 66.62 M/s Paving Stone (India) Pvt. Ltd. B/br/2019/21 18/02/2019 5 5.00 0.00 0.00 66.62
565 B BG B_General ongoing gq nw br P/F 60mm thick Interlocking tiles in streets of Jamalpur W No.24 ILT60 W No.24 74.07 52.01 Sh Rajeev Singla B/br/2019/22 18/02/2019 4 15.00 0.00 0.00 52.01
566 B BG B_General ongoing gq nw br P/F 80mm thick Interlocking tiles in streets of New subhash Nagar near School W No.06 ILT80 W No.6 73.78 54.11 Sh Ashok Kumar sobti B/br/2019/23 18/02/2019 3 5.00 0.00 0.00 54.11
567 B BG B_General ongoing gq nw br P/F 80mm thick Interlocking tiles in streets of New subhash Nagar backside sodi Bakery W No.06 ILT80 W No.6 96.69 69.94 Sh Ashok Kumar sobti B/br/2019/24 18/02/2019 4 5.00 0.00 0.00 69.94
568 B BG B_General ongoing gq nw br P/F 80mm thick Interlocking tiles in streets of Indra Colony in W No.5 ILT80 W No.5 67.07 48.96 M/s Dynamic tiles B/br/2019/25 18/02/2019 4 5.00 0.00 0.00 48.96
569 B BG B_General ongoing gq nw br P/F 80mm thick Interlocking tiles in streets of Chanderlok Colony opp. Govt. school in W No.5 (56.09) and P/F 60/80mm thick Interlocking tiles in streets of Attal Nagar near Mandir in W No.5 (29.69) ILT80 W No.5 85.78 61.98 M/s Dynamic tiles B/br/2019/26 18/02/2019 5 5.00 0.00 0.00 61.98
570 B BG B_General ongoing gq nw br P/F 60/80mm thick Interlocking Tiles in streets of Prem Vihar (Part-E) W-7 ILT80 W No.7 78.64 55.84 Sh Ashok Kumar sobti B/br/2019/27 18/02/2019 5 5.00 0.00 0.00 55.84
571 B BG B_General ongoing gq nw br P/F 80mm thick Interlocking Tiles in streets of Prem Vihar (Part-D) W-7 ILT80 W No.7 75.85 54.03 M/s Apex Developers B/br/2019/28 18/02/2019 4 5.00 0.00 0.00 54.03
572 B BG B_General ongoing gq nw br P/F 80mm thick Interlocking Tiles/paver block M-40 grade in streets of mohalla Starcity (Part A)on Tibba road W-7 ILT80 W No.7 74.17 52.67 Sh Ashok Kumar sobti B/br/2019/29 18/02/2019 4 5.00 0.00 0.00 52.67
573 B BG B_General ongoing gq nw br P/F 60/80mm thick Interlocking tiles in the remaining various streets of Sub Zone B3 W No.7 & 8 (49.88) and P/F 60mm thick Interlocking tiles in streets of Prem Vihar near Overhead water tank W No.07 (9.94) ILT80 W No.7 & 8 59.82 53.84 M/s SK Const. Co. B/br/2019/30 18/02/2019 5 5.00 0.00 0.00 53.84
574 B BG B_General ongoing gq nw br Laying RMC( M-30) in streets of Jaiswal Complex (Dyeing Industrial Area) Part-C W No.7 RMC6 W No.7 & 8 90.85 68.02 M/s NKC Const. Pvt. Ltd. B/br/2019/31 18/02/2019 5 0.00 0.00 0.00 68.02
575 B BG B_General ongoing gq nw br Laying RMC( M-30) in streets of Jaiswal Complex (Dyeing Industrial Area) Part-B W No.7 RMC6 W No.7 81.35 60.91 M/s NKC Const. Pvt. Ltd. B/br/2019/32 18/02/2019 4 0.00 0.00 0.00 60.91
576 B BG B_General ongoing gq nw br Laying RMC (M-30) in streets of Vishkarma colony W No.14 RMC6 W No.14 83.18 58.12 M/s NKC Const. Pvt. Ltd. B/br/2019/33 18/02/2019 5 5.00 0.00 0.00 58.12
577 B BG B_General ongoing gq nw br Const. of RCC road by laying RMC (M-30) from Pearl Hosiery to Plot No.C-7 Textile Colony W No.17 RMC6 W No.17 90.13 64.69 M/s NKC Const. Pvt. Ltd. B/br/2019/34 18/02/2019 5 5.00 0.00 0.00 64.69
578 B BG B_General ongoing gq nw br Laying RMC( M-30) in streets of Hargobind Nagar W No.40 RMC6 W No.40 80.09 55.20 Sh Varinder Singh B/br/2019/35 18/02/2019 5 5.00 0.00 0.00 55.2
579 B BG B_General ongoing gq nw br P/F 80mm thick Interlocking tiles in streets of New Raju Colony W No.8 ILT80 W No.8 74.48 52.50 M/s Apex Developers B/br/2018/64 29/01/2018 3 40.00 18.07 0.00 52.5
580 B BG B_General ongoing gq nw br P/F 60/80mm thick Interlocking tiles in Gurmail Park near School W No.08 ILT80 W No.8 54.53 39.34 Sh Deepak Madaan B/br/2019/46 07/03/2019 3 0.00 0.00 0.00 39.34
581 B BG B_General ongoing gq nw br P/F 60mm/80mm thick Interlocking tiles in Manjit Nagar on Gopal Nagar road W No.07 ILT80 W No.07 65.09 43.82 Sh Hitesh Aggarwal B/br/2019/53 07/03/2019 3 0.00 0.00 0.00 43.82
582 B BG B_General ongoing gq nw br Laying BM & SDBC in streets of Mohalla Karamsar Colony backside Bedi Building material Store & remaining streets of Nalwa Colony W No.6 SDBC W No.06 76.26 58.55 Sh Rajesh Kumar Sood B/br/2019/59 07/03/2019 4 0.00 0.00 0.00 58.55
583 B BG B_General ongoing gq nw br Const. of Road by laying BM & SDBC on Main Bhagwan Nagar Road W No. 10 (47.44)--- (50%-50% work alloted to each Contractor) SDBC W No.10 23.72 18.18 M/s SK Const. Co. B/br/2019/60 07/03/2019 3 0.00 0.00 0.00 18.18

Legend





Technology Powered by Webrosoft Solutions (P) Ltd www.webrosoft.com